Laserfiche WebLink
MAY-11 -2010 11 :26 AM P. 11 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION L <br /> PLAN TYPE ONITORFNG IS IDENTICAL FOR ALL UST,,AT THIS FACILITY. <br /> (Check one one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I. FACILITY INFORMATION <br /> FACILITY ID N(Agency Use On7»I I>7 — — <br /> koj <br /> BUSINESSNAME(Same esFACILITY NAME) <br /> BUSINESS SITE ADDRESS " w CITY Nos, <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANC <br /> State law requires that testing,preventive maintenance.and callmation of monitoring equipment(c S_sensors,pro ws,line leak defectors,etc.)be performed at <br /> the Otqueney specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that Such work must be performed by <br /> qualliled pommel <br /> MONITORING EQUIPMENT IS SERVICED NNUALLY mos ❑ 99.OTHER(Specify)'. Mol. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan most include a Site Plan showing the general tank and piping layouts and the loentions Where monitoring is performed(i.e..location of each sensor, <br /> Jim leak detector,Irlonhnring system control panel,etc I. if you already have a diagram(a g_current UST Monitoring Site Plan from a Monitoring Svatem Certification <br /> form,Harardous Materials Business Plan mop etc.)which shows all required information include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOO(S):(Check all that apply) 1e' <br /> CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS I /[Fii:I�DRY A b LIQUID FILLED C] c.PRE$'I IRIZED El d.VACUUM all <br /> PANEL MANUFACTURBR: V D iLd (S OA'>` MI1, MODEL 4: TCrS 3r0 N13 <br /> LEAK SENSOR MANUFACTURER: ��/K`.T_G/L C'Lnn�' _ bad MODEL N(S)' 1-/0j Mti <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TAIq 6 MP. <br /> PANEL MANUFACTURER: M)5. MODEL N' <br /> IN-TANK PROBE MANUFACTURER Mts. MODEL NIS), MIs. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ h.DAILY/NIGHTLY ❑ c.WEEKLY Mia. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify), aUl. <br /> PROGRAMMED TESTS: ❑ a.0.1 gp.h. ❑ b.02 g.P.h. ❑ c.OTHER(Spccif),)I Mil. fes <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR 82646 ❑ b.STATISTICAL PER 23 CCR,42646.1 Mab <br /> ❑ 4 WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR,42643 <br /> TESTING PERIOD: [3a.36 HOi IRS El b,60 HOIIRS Mal <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR 42643.I <br /> TEST FREQUENCY: ❑ n.ANNUALLY ❑ b.BIENNIALLY C) c.OTHER(9pecity)'. Mae' Mar_ <br /> ❑ 6 VISUAL MONITORING: ❑ a.DAILY O h.WEEKLY <br /> Mia <br /> ❑ 99.OTHER(9peelty): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THEFOLLOWING METHODS)(Check ail that apply) MIS. <br /> ❑ 1.CONTINUOUS MONITORING OF PIPING SUUM/p(S)lTRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: [y a.DRY ❑ b.LIQUID FILLED (] c.PRESSURIZED ❑ d.VACUUM K'I <br /> PANEL.MANtIFACTURER_ V9,gDoyL 206-6 M" MODEL.N: —My�y'7-��-�'--� ws. <br /> LEAK SENSOR MANUPACTURER: Mid. MODELN(S): �QJ Ws <br /> WILL A PIPING LEAK ALARM TRIGGER AUTONIATIC PUMP(i.e..TURBINE)SHUTDOWN? ga�a.YES [3 b.NO we <br /> WILL FAILURP/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? M^eym ❑ b,NO Mn <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g,p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK 19 DETECTED <br /> MLLD MANUFACTURER(.,,): Mac. MODEL N(S7Mas <br /> : <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3 0 e.p.h.LEAK TESTS <br /> ELLD MANUFACTURER(s): MIs. MODELN(SI: Nel <br /> PROGRAMMED IN LINE'TESTING: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h, Moa <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN'[ ❑ a.YES ❑ b_NO Mea' <br /> WILL BLLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN^. ❑ o.YES [3 It NO W4 <br /> Q 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a. ANNUALLY ❑ b.EVERY 3 YEAR$ ❑ c.OTHER(Specify) afa. Mos <br /> ❑ 5.V1913ALMONITORING: ❑ a DAILY ❑ b.WEEKLY ❑ c.MIN MONTHLY R EACH TIME ti YSTEM OPERATED- Mor <br /> •Allowed nal V,ama eNv ar AaC ORa IItbO) <br /> ❑ 6,SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR 41636(a)(3) <br /> ❑ 1.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(,,) <br /> ❑ 99.OTHER(Specify) Mae <br /> bwMrc-d(W24/04)-114 <br />