My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
18806
>
2300 - Underground Storage Tank Program
>
PR0232388
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:04:29 AM
Creation date
11/5/2018 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232388
PE
2361
FACILITY_ID
FA0003607
FACILITY_NAME
WOODBRIDGE AM PM*
STREET_NUMBER
18806
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
WOODBRIDGE
Zip
95258
APN
01543010
CURRENT_STATUS
01
SITE_LOCATION
18806 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\18806\PR0232388\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/12/2017 11:04:41 PM
QuestysRecordID
3225123
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 0 4 2016 <br /> VMI 99 LD-2000 New Series ENVIRONMENTAL <br /> �..iC�IT61'\Cn��T1/C�.IT <br /> Highest Performance, <br /> Most Requested Mechanical Line Leak Detector Built Today!! <br /> • Any Fuel' <br /> • Any Pump` <br /> • Any Pipeline System' <br /> • Longest Length Pipeline System` <br /> • Largest Volume Pipeline System' <br /> • Integrated Check Valve / <br /> Pressure relief <br /> .see technical specification <br /> 1 .T <br /> The 99 LD-2000 <br /> VMI / <br /> The 99 LD-2000 is now the most requested mechanical line leak detector built today. New <br /> engineering and the VMI 2-year warranty (after installation) make the 99 LD-2000 more <br /> attractive to station operators today than ever before. Not only is the 99 LD-2000 less ex- <br /> pensive to own, it is faster and less subject to field and line variables than ever before! <br /> Integrated In-Line Check Valve / Pressure Relief <br /> Leaking check valves in the turbine, defective submersible pump pressure relief, or a defec- <br /> tive bypass valve will allow the line system to depressurize, resetting the leak detector. <br /> Drain-back into the pump or thermal contraction will cause vapor pockets to form. Vapor <br /> pockets increase the length of time it takes for a leak detector to open to full flow. Pump <br /> problems such as these result in slow flow and technical support calls. The resulting service <br /> costs and customer dissatisfaction all take away from the bottom line - making money. <br /> The 99 LD-2000 Is The Only Leak Detector <br /> Capable Of Holding Line Pressure After the Pump Is Off— <br /> Even With Pump Component Wear Or Failure. <br /> "Patent pending <br />
The URL can be used to link to this page
Your browser does not support the video tag.