My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
18806
>
2300 - Underground Storage Tank Program
>
PR0232388
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:04:29 AM
Creation date
11/5/2018 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232388
PE
2361
FACILITY_ID
FA0003607
FACILITY_NAME
WOODBRIDGE AM PM*
STREET_NUMBER
18806
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
WOODBRIDGE
Zip
95258
APN
01543010
CURRENT_STATUS
01
SITE_LOCATION
18806 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\18806\PR0232388\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/12/2017 11:04:41 PM
QuestysRecordID
3225123
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Emplolec Training Pa e 2 of 2� <br /> •All facility employees have received the reyaired on-th_job tra � <br /> ining within the past year. <br /> All facility ees employhired within the past 30 day";have received the nquircd on the jd+training. X <br /> hlonthl.� lnsptxtion— _. ----- - <br /> - --_. �y N SIA Ikltc[hmc <br /> ------ --- - --- -----... .. 4-6-15 <br /> Monitoring system ceniliention(within past 12 ntontiv+) -- - - <br /> -x— 4-6 15 <br /> Spill Bucket testing completed(within past I3 months) _ 5_.._ <br /> Leak Uetcctor-mechanical%ekcunnic forntostsiles(wilhin past 12 months) X 4-6-1- <br /> The above are asual(r done nr,(etfw on an annnar hasic/or local+rgukrlur. <br /> Line Tightness(usual$ upon c <br /> —on <br /> stnlction or when no positive shutdown)---- __ <br /> Tank lightness(Usually only after construction or when using SIR) <br /> Se:ondary containment(SB989)tuts have been wmpleled(usually every 3 years) - x 05-08-14 <br /> Oicer les+irtg ur muinrena�xre completed us're�q+rired Lisl!tx•m beintr.____-__."_ __ _ <br /> rTest/Maintenancc: <br /> ance: AQ X 10—)7-1-� <br /> 'I c: _.. _ -----"1 RIMl CT INCLUDEDYe�—•N0NA575 PAID — <br /> ---J-'- __•---- --- MAY 06 2016 ---- <br /> Items Requiring Follow-up Action.+: _--- <br /> V �-- <br /> Monthly inspection must be conducted by an ICC licen.ed Designated Operator. <br /> A copy of this checklist must be provided to IIST owner or operator. but not to State Watcr Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained un-site or. if approved by the local agency, off-site at a readily <br /> ava�loe;ation. I <br /> 9•d B££:Ot 9t,90 AaW <br />
The URL can be used to link to this page
Your browser does not support the video tag.