Laserfiche WebLink
RG(;F.j vjiL; <br /> UST SYSTEM RETROFIT OR REPAIR FEB 04 2016 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by FFHD� ,IRON <br /> 1. Site ma enclosed? YES NO tnJv tl�/1y NTA <br /> P [I [] 1404In.nrn�m„eee,� <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (If <br /> addiM piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Slow flow-91 &89 trouble shot to defective leak detector , replaced 91 LD <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> (1) VMI 99LD 2000 Leak Detector <br /> 3 <br />