My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
7910
>
2300 - Underground Storage Tank Program
>
PR0231660
>
COMPLIANCE INFO 2002-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 4:12:56 PM
Creation date
11/5/2018 6:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2013
RECORD_ID
PR0231660
PE
2361
FACILITY_ID
FA0003733
FACILITY_NAME
NORTH SIDE SHELL
STREET_NUMBER
7910
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
07949006
CURRENT_STATUS
02
SITE_LOCATION
7910 LOWER SACRAMENTO RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\7910\PR0231660\COMPLIANCE INFO 2002-2013.PDF
QuestysFileName
COMPLIANCE INFO 2002-2013
QuestysRecordDate
8/1/2017 3:46:12 PM
QuestysRecordID
3538774
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-P*of 3 0 <br /> Site Address: 7910 Sacramento Rd. c@ Hammer Lane Date of Testing/Servicing: 6123104 <br /> F. In-Tank Gauging/SIR.Equipment: pg Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes ❑No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> pg Yes ❑No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑N/A (Check all that apply) Simulated leak reate: gg 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.) ❑ 0.2 g.p.h. (2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> pg Yes ❑ No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> M Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> gg N/A <br /> pg Yes ❑No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> pg Yes ❑No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑N/A or disconnected? <br /> pg Yes [I No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> pg Yes ❑No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> pg Yes ❑No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.