Laserfiche WebLink
12119/2663 19:55 488971 SSS INC PAGE 83 <br /> Monitoring System Certification-Page 2 of 3 <br /> ifate of Testn=Servicit r '11!13103 <br /> 7910 Sacramento Rd � Fdammer Lane � �� <br /> Results of Testing /Servic-in <br /> Software Version flistallcd; <br /> Com tete the following checklist: <br /> Yes ❑ No* is the audible alaizn operational` <br /> Yes ❑ No* is the visual alarm operattOnai? <br /> F_14yes fl No* Were all sensors visually inspected, functional!y tested,and conftrrtled operational'? <br /> Yes ❑ No* Wel-F,all censers installed at 9owest point of secondary conminmcnt and positioned so that other egUipMellt will <br /> not interfere with their proper operation'! <br /> ®Yes ❑Noy if alarms are relayed to a r(�inote monitoring,station, is all conlinunications.equipment(e.g.modem) <br /> ❑ N/A operational:' <br /> ®Yes a No* For pressurized piping systems,docs die tnlrbine automatically shut down if the piping secondary containment <br /> ii NIA monitoring system detects a leak,fails to operate,or is electrically disco?rnected'? If yes: vAtich sensors initiate <br /> positive shut-down? ('Clieck all thar uppn y) 0 Sump/Trench Sensors, ❑Dispenser Containment Sensors. <br /> Did you canfunl positive slitit-down due to leaks and sensor failure/discotmection? ®'Yes El <br /> FD 2�l0* Ft�� ta��l:systcn�s that utilizo tlxc mwiitoriub:yz.uarn as the primary tank overfill warn,n2 device(i.e.no <br /> ® N!A mcchmical,overfill prevexition valve is illstalled), is the overfill warning,alarm visible and a.udiblc at the tank <br /> fill Dint s)and o crating properly? if so,at what percent of tank capacity does the alarm trigger'? 0A <br /> to No Was any monitoring,equipment t•cplaced'?If yes, identify specific sensors,probes,or outer equipment replaced <br /> and list the manufacturer narne and model for all replacement arts in Section E,below, <br /> 8 Na Was liquid:FoLm- l inside any seclundiry rnntainment systems designed as dry systems'? (C1tecic all that apply) <br /> ❑ Product; © Water_ if yes,dc5cribe causes in Section E,below. <br /> 2 Yes 0 No" Was monitoring system set-up reviewed to ensure proper scttin s'? (Attach set-up +•e o�ts, if a llcrrFil�. <br /> P81 Yes ❑ No"� is all nionitortng equipntetit operational per ttlatlu3acntrcr's sl1V'C I.tii 4tititii5'? <br /> *In Section E below,do--Tribe how and when these deficiencies were or will be corrected. <br /> F. Comments: Disp#5/6 Inop. <br />