Laserfiche WebLink
04/1812003 08:18 40897101 SSS INC PAGE 03 <br /> Monitoring System Certittcatio -P14 � of 3 <br /> Site Address: 7910 Sacramento Rd. @ Hammer Lane <br /> Date of 1`estin.Ocrvicinf.,; 02171/03 <br /> D. Results of Testing/Servicing <br /> Software Version Installed. 119.02 <br /> Con, Ictt ti folloyvi +l <br /> u ,eckiint: <br /> ®Yes to No* Ts the audible alarm operational? <br /> M.Yes ❑ No* is the visual alarm-7-- <br /> 3 Yes ❑ No* Were all sensors visually iatspected, tanctionally tested,and confirmed operational? <br /> Q Yes ❑ No* Were all sensor$itrstalled at lowest point of secondary containment and positioned so that other equipment will <br /> not iutt:e['crar with their aoper operation'! <br /> 0 Yes ❑No* If alarms are relayed to a remote monitoring station, <br /> Q NIA _operational? is all conununications equipment(e.g, modem) <br /> M Yes ❑ No* For pressurized piping systems,does the Turbine automatically shutdown if the piping secondary containment <br /> ❑NIA. monitoring systean detects a leak,fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive Shut-clown" (Cljec.-A c�/I(herr apply) U9 Sump(l rend/Sensors; ❑ Dispenser Containttrent Sensors. <br /> Did you Confirm positive shirt-down due to leaks and sensor Iailurefdisconnectiott? M Yes ONO <br /> ❑Yes ❑ No* For tank systems that utilize the monitoring,system as the primary tank ovpifili%x,arnin <br /> ® <br /> N/A mechanical overfill prevention valve is installed),. is rite overfill wanihig a(aTm visible and audible at the tank <br /> fill 0111t(10 and operating proper! ? if so. at what percent of tank capacity does the alarm trigger? 0 <br /> El Yes* w o was arry monitOsiil cquiPmcnt mplaCcd?Tfyes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E below, <br /> Q Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems (heck all Mat a1�pI)t <br /> ❑ FrOdUct; ❑ Water. If yes describe causes in Section E, below. <br /> M Yes p No* Was monitoring system set-up reviewed to ensure proper settings? (Rllreclr set-a( 7e orl3, i a dicahle.) <br /> a Yes ❑ No* Is all monitoring �ep,inmeut operational per mancutactur•cr`s apeeificntic)Ijy? <br /> *In Section F below,describe how and ,when tltese deficiencies were pr will be corrected, <br /> E. Conitnents• <br />