Laserfiche WebLink
Monitoring System Certification-Pa of 3 <br /> Site Address: 7910 Sacramento Rd. Hammer Lane Date of TcstinglServicing: 01125102 <br /> F. In - Tank Gauging 1 SIR Equipment: a Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑Yes 0 No* Were al]tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes 0 No* Was accuracy of system product level readings tested? <br /> ❑Yes 0 No* Was accuracy of system water level readings tested? <br /> ❑Yes 0 No* Were all probes reinstalled properly? <br /> ❑Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): D Check this box if LLD's are not installed. <br /> Corn Tete the followin checklist: <br /> M Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> 11 NIA (Check all that apply) Simulated leak reate: 0 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); 0 0.2 g.p.h. (2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br /> I Yes ❑ No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> g11Ye ❑ No* Was the testing apparatus properly calibrated? <br /> 11 No* For mechanical LLD's, does-the LLD restrict product flow if it detects a leak? <br /> ® NIA <br /> 0 No* For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br /> 0 NIA <br /> 0 No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 Nr'A or disconnected? <br /> ❑ No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br /> 0 N,A malfunctions or fails a test? <br /> 0 Yes 11 No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> 0 Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> s * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />