Laserfiche WebLink
i 1 2 1 3 1 4 5 61 7 1 8 9 10 1 11 11 12 1 13 1 14 <br /> I 15 I 16 , 17 18 <br /> Suction System - Open check via lve, pw; pcpf,a and Bruin product from line into tank. ALTERNATIVE BACKFILL MATERIALS: Defined as any material not rneeting above requirements SPECIAL FITTINGS: The shut-off valve Shear' or "Safety" valve at the base of lila product <br /> 01 GENERAL REQUIREMENTS Do not replace poppet. Remst0ll cover on valve, for approved materials. or dispenser is secured In position (to the stabilizer bar of the dispenser containmnt box os detailed <br /> M Pressure S tem- "Break" p p Approval Company P q prior to use of such material. In certain on the drawings. M <br /> Sy-,tem- ppe at union ul remote pain Drain product into tank or A ravel of Com,an Representative is required <br /> These Geneful Requirements apply to all sections of the specifications as if stated separately in each separate contoiner. instances, the approval of the lank manufacturer may be required to preserve the tank warranty. Position the valve so that the line test port plug is accessible. <br /> section. Company shall obtain such approval. <br /> Avoid spills. Do nal allow product to drain into call. Cnnlraclor may be held liable if soil PIPE WRAPPING: All underground sleet pipe and fillings shall be field primed and wrapped. <br /> COMPANY REPRESENTATIVE: The Regional Manager or Representative authorized by him, contamination occurs during tank and line removal. Alternate materials. if used, must be dry and free of ice and snow. The lank hale sides must be Wrapping material shall be 35 mil polyethylene tape "Polyken 930" manufactured by the Kendall <br /> hereinafter referred to In these specifications as Company Representative, shored or side sloped to permit entry for compaction and testing. Company (of equal approved by Company Representative). Wrap overlap shall be one-half width <br /> Flush all product, vent and vapor return lines back in lank or separate container(s). (Flushing of wrapping material. Wrap 1-1/2" and 2" fittings with Potyken 900 tit mils) with a 50% <br /> In separate containers can be dumped into product tanks for storage-) Flush each Ilne with a <br /> STATUS OF COMPANY'S REPRESENTATIVE: Company Representative has authority to it-oke minimum of 1t) gallons of water. BEDDING OF TANKS. A 12" minimum bed of backfiill moteriat is to be placed in the hole, shollapbe PMdkenul92oreas Polyken 931 can be used before wrapping with Polyken 90U. Primer <br /> smoothed and sloped to allow a tank sic p - Y (above 40' F) or Polyken 919 (above 10' F), <br /> all decisions regarding work performed under this contract. - P pe of 1" in 10' downward toward the fill end Tier to <br /> Open all openings and flush inside of each took with a minimum of 200 gallons of .voter using setting Ih? lank. Exceptions. Do not wrap the union al the remote <br /> high pressure spray' equipment with wand to "wash down" the sides and bottom of the lank, y P pump and/or FRP pipe/flex connector <br /> WORK INCLUDED: All lobar, material, utilities and equipment required for full) performance and When specified, the hold or iia-Bonn "logs' shall be installed prior to be bed moleriai, connections. <br /> completion of work herein specified or shown on accompanying drawings, including procurement Company Representative will arrange for a vocaum buck to nolle-f oil re,_.),ered prcd.,ct (liquid . . <br /> L p <br /> SETTING ,g BEDDING PIPE: A 2' :nd sloo bed of backfill material o to be placed in all piping <br /> of and payment far all recassar permits, utilities', eta unless otherwise? Hated on the plans or and ,ludas). b'ocuurn truck Is to return "resay..r_9 pf sJact to "slip it :' impar , •xaity or Caution - Do not pfice ':inksJr, �-;mcg?le slabs, amaers, beaks. cradles or rout the tanks in net E- <br /> p y y p 9 trenches. Smooth,per <br /> compact and slope bedding material to albs a ,lope of i/4 per foot toward the <br /> Specifications or specified by Company Representative. approved-treating facility with approved oil/water s?act gator system. to the ltop Tof thehe tank if tied <br /> is any chandown , ce ictust never " tett onrot e the bed <br /> dthe t tank bolbfom.i ,n the ll funks. 1/8 per foot may ba used If approved in writing Representative, <br /> The tank must be free from flammable vapors prior L, rgnnovol. One rrethcd is to remove all n,;le <br /> DOCUMENTS: Drawings and spec'dlcobons are cooperative. Execute work indiicated in one as if tank fixtures, except for the lank cent an9 pierce soli] carbon dioxide (dry ice) in the took. t. SEE SECTION 07 FOR BACKFILL MATERIALS. <br /> indicated in both. Work not detailed or specified must be some quality and type as work detailed minimum of 1 ,5 IDs per ICO yalbi5 of .rink :longi, :must ve aJiea plu.T O tank <br /> or specified. Controctor shall verify all dimensions and conditions on the site, Report at once except the vent and OF,. the tank ,o Piping shall over <br /> placed o i prepared bed N such u manner Cr to minimize points at which ore pip? <br /> any discrepancies found between drawings, specifications and site conditions for adjustment by p + y + may cross over another pipe. At points where piping must uoss over, a minimum of 2 I/2" must <br /> Cornpaay Representative before starling work in question. Under no circumstances should work After tank venting, the va'+er space shall be iested b Inch the combustible : os ind:cotor robe � � R(��J jJ� T, 'VENT r'3S VAPOR RE(,J�ERY PIPING separate the pipes. <br /> k D r placing a' p - <br /> in question be started If a discrepancy is discovered after award of Contract. Terms of contract Into the fill opening with the drop tube removed, Readings should be taken at the bottom, , <br /> app) to this work. Contractor to keep a complete set of drawings and speciflrations and any middle and upper portions of the tank. The tank atrnosphBfer must be 207 or less of the lower When piping is placed on the bed, proceed to "First Test" (below) poor to backfilling trenches. <br /> pertinent supplemental documents on the job at all times. When the word PROVIDE is used an flammable limit prior to removal. Refer to the probe manufacturer's instructwns for testing In MATERIALS: All pipes, fittings, riseis, vampping matterials, etc., shall be furnished and installed CLEANING SOLVENTS: Remove any accumulation or occidental spill of e cleaning v <br /> p p the Contractor. Specific motertols noted In this specification and/or on Ions will be P DP g sol ants on <br /> m <br /> drawings or in specifications, Il shad be taken to mean "Furnish and Inista!I," low oxygen conditions. by F p / p the tank immediately with a clean cloth. After lila piping is completed, inspect the containment <br /> furnished by Company. sump and other collection points for piping cleaning solvents. Contractor will be responsible for K <br /> K Prior to removal, all tank openings should be plugged. One piny should have a I/s. vent hole any damage to tank resulting from on accumulation of pipe cleaning solvent. <br /> LAWS, CODES, ORDINANCES AND REGULATIONS: Laws, Codes. Ordinances and Regulations to prevent excessive pressure buildup. This vent hale must face upward at all times. All pipe runs are to be of "flberglas; pipe and sized In accordance with plana, 9 <br /> which apply to this work must be rigidly followed. Determine handling off any variationspiping <br /> between Ions or specifications and overnin ordinances, etc., w!ih Comp any Representative Plug any corrosion caused holes using screwed boiler plugs. Company Representative will inspect Flex connectors ore to b? used of !Le vent user base mid Bis enser base g REPhIalf section oo;f ipe is roto acceptable. lro approved <br /> by Company of piping using field cul <br /> D 9 9 p G pipin cannectians. p F P Pp y ce Representative, repair using <br /> Zone starting work. the removed tanks, then release the tanks 6cr shipment. manufacturer supplied Alpe fittings and procedures Is acceptable. Repaired pipe re wires <br /> Above ground vent riser Is to be steel pipe. complete testing or retest. using procedures below_ p q <br /> All U.L. Labels shall be removed and given !o the Company Representative. <br /> PRECAUTIONS', Protect adjoining property, earthwork, trees. etc., train domage and give proper Black Iron pipe or fitting shall be used with diesel fuel. Do not use galvanized pipe or fillings SECONDARY C)NTAINMENT FITTINGS: Two piece fittings require more adhesive than normal <br /> written notice of proposed work to adjoining property owners, Repair only damage to adjoining All tanks must be property labeled pr,ar is Ocn3p,flut,on frorr the site. Transport and disposal with dieselael. bell end spigot joints, Two 7/16 wrenches or a variable torque Impact wrench is required to <br /> properties caused by this operation to satisfaction of Company Represeni!otive. Protect completed of the tunas and product Lae= nu- ho ,., ^.r.Lmce with, all stale and local regulations. <br /> I FIBERGLASS PIPE Pip? and fillings to b? UL ale"proved fol petroleum rindalcahel fuels, non- tighten the fittings. Make sure adhesive fills all yaps between pipe ends and fitting sockets, <br /> work from damage until accepted by Company Representative. <br /> Follow any state ar Sal regu -Itians r=,par airy s,•i rumples or inspection of tank hole anal/or metallic for underground piping of pel.roleurn product <br /> Ias All pipe will have bell and spigot joints. FLEX CONNECTOR BOOTS Encase all flex connectors when in contact wild soil in an isolation <br /> tanks. All product piping All have secog dary contaimmenl. Vent and vapor recovery piping do nal require boot. Move the isolation to inspect and lest all prinvory piping and flex connector, <br /> J MATERIAL: In be new, purchased locally if possible, and of brand herein specified. Broads and secondary mnboinnlent unless specified elsewhere, <br /> gyrades specified are approved and included to establish type and quality requirements. If When free product is found during any phase cf the removal of underground tank(s) or piping TESTING OF PIPING: Notify the Cornpony Representative, who MUST observe all tests, at least <br /> f"ontractor would prefer to substitute brands and grades that are equal to those specified, systern(s), immediately nofff, "e Company Rel ler:-: i r,.e - Approved Fberglass P,pe <br /> 24 hours in advance of any tests. Contractor to coordinate testing with local inspectors and <br /> procurement <br /> on propos=al substitutions must be submitted to Carnryony Representative prior to <br /> procurement to determine acceptability to Company. EXCAVATIONS. Excavate only to the depths required by me plans. Jr is instructed by Company Ameron Company Representative. <br /> Representutive. Dudley - 3000/L Pipe System The Contractor is responsible for all labor, material, and equipment to conduct pressure tests (air <br /> SUPERVISION AND COORDINATION: General Contractor Is responsible for progress, execution If unexpected water condition or rock is encountered. Immediately contact the Company Soith Flbenaloss, Inc. or hydrostatic) of all product, vent and vapor recovery piping. <br /> and quality of Subconlructor's work and is to coordinate and expedite procurement of materials Representative for instructions before proceeding with the excavation. Red Thread II Pipe System TESTING DEVIATIONS: Do not deviate from the following testing procedures. Perform alternate <br /> and performance of work of respective trades and Subcontractors. Generol Contractor to have <br /> the some qualified responsible representative who understands and speaks English fluent) on the TANK HOLE SIZE IN STABLE SOIL'. Size excavation perimeter to,ollnw 24" minimum between Adhesives for Primary Product Piping Adhesives for Vent, Vo or, and Secondary Containment Piping testing procedures required by local inspectors after Chevron tests are completed and <br /> p p g y F P Y C 9 documented. <br /> jet at all limes, including time of final inspection. General Con(radgor is responsible for tanks and 24 rnimmum between tank sides and end caps Anal the wall of the lank hole. DS-8014 (Must be Heat Packed) DS-70691 <br /> establishing and maintaining all lines, levels Ord grades shown on plans or otherwise required. + DS-8069 I. FIRST TEST (Prior to Back Filling Pipe Trenches): Do not connect piping to tanks, remote <br /> General Contractor to maintain site in accessible condition for other traides and contractors i Pumps or dispensers. Do not seal or install secondary containment fittings until primary Piping <br /> Fd TANK HOLE SIZE IN UNSTABLE SOIL Unstable sal ,s defined gs having less thou 750 lbs./sq. Non-rnetotlic fittings ore to be thus? manufactured by the supplier of the pipe being used. is tested. H <br /> it cohesion, as ralculoted from an unconfined compressioH test, or soils with an ultimate bearing <br /> RESPONSIBILITY: The Contractor accepts full responsibility for proper handling and installation capacity of less than 3,500 lbs./sciAt. Loose Scnd, muck, bog, peal, swornp air landfill where soil Install primary acid secondary pipe and fittings in accordance with the mOnufacturer's instructions. Test the entire piping system, i.e., product. vent secondary containment and vapor recover <br /> of the fiberglass reinforced plastic (FRP) or composite underground tankis and FRP piping, and is soft are generally considered unstable soils. <br /> (where applicable), in accordance with the following procedure. Y <br /> shall ensure that good workmanship, practices and construction procedwres are followed during 2. STEEL PIPE: (GOivonized or Black [ran) <br /> the handling and installation of the tanks and piping. Size exruvotion perimeter to allow 24" minimum between tanks and a rninimu:n of half the tank <br /> diameter between the lank sides/end caps and the Nall of the tank hole. Schedule 40 (ASTM A-120) Steel Pipe <br /> Soup Thmaximum <br /> Tile Contractor Is responsible for inspection of the tanks for damage upon receipt at the job site. 250 Railroad Unions Step One: Install pressure application system that includes two pressure gouges (15 <br /> Note any visible damage an the delivery receipt. Filter Labuc will be used to line fork hole for FRP tanks in ,,,..stable s±,.- 150 Malleable Iron Fittings Soup all joints Apply pressure air 10 psi into lila piping system. <br /> Ss using approved soap solution. <br /> The presence of the Company Representative onsite does riot relieve the Contractor of the Permanent shoring may be used to stabilize the wolls of the tank hale, it the arsenal On of the Do not use standord couplings typically furnished with the pipe. Carefully observe each joint for evidence of leaks. <br /> responsibility for proper tank handling, installation, and safety measures. Contractor and/or Company Representative. If permanent shoring Is used, follow "Stable Ship <br /> size crileriu. Refer to Alternate Backfllt Malenols.' below, HANDLING OF PIPE & FITTINGS: All pi my installations shall conform to pipe manufacturer's Step Two: Protect area around piping systems to prevent workmen, passers-by, etc., <br /> ii ecifications and installation guidelines from entry. Install pressure application system that includes two pressure gauges (150 <br /> ,P 9 psi maximum) Apply eat psi pressure to each piping system, hold for one minute, <br /> Q TESTING AND I those Isp The nature and type e tests or in t inspections o be conducted, in release pressure. Repeat for five cycles. Ci <br /> addition to those specifically called for on lila plans or In the specifications. will be listed by DEPTH OF TANK HOLE Contractor is responsible for es!ublishing the Conk hole depth, considering 1. FIBERGLASS PIPE'. Careful handling of piping is critical. Protect piping against abrasion <br /> Company Representative under "Scope of Work. The cost of such tests; will be paid by the the length of piping runs, to the pump blocks and vont risers, Pipe burial depth, yard slope and from shorp or hard objects; impact damage from improper storage, transporting, laying or Step Three: Repeal Step One. <br /> Company. the following criteria: (Measure of the Remote Pump opening). backfilling. Inspecf ail pipe for damage prior to installation in the piping system. <br /> If the Company Representative determines, during the course of construction, that additional 1. A minimum at 12" of backfill material Is required under the tanks. 2. STEEL PIPE AND FITTINGS: Protect against dunnage to protective coati.. wra 'mr . Record all test results bt the Company-supplied forms. Company Representative's approval of <br /> J g P 9/ DP 3 test is required. Alter obtaining such approval, the Contractor shall backfill trenches to <br /> the Contractor <br /> or testing, whether by Company TranRepresentativearrangements <br /> or a testing agency, are necessary, INSTALLATION REQUIREMENTS: Interior suffer e of all e g subgrpde, following the requirements of Section 02 and materials in Section 07. <br /> the Contractrn shall cooperate in making arrangements for such tests. If work In question has 2. FRP: The rninimim depth of cover is 3'0" and the maximum is TO°. _ pip , and fitGns roust be free from dirt, <br /> not yet been installed and questioned material is satisfactory, payment for the test shall be mode Cornposile: The minimum depth of cover is I'8' and the maxirnirn is 5'0 scale, metal, fiberglass particles, etc. before connecting. 2. SECOND TEST (After sealing secondary piping): Apply 10 psi to the secondary containment <br /> by Company. If the material is unsatisfactory, it shall be replaced at no additional cost tosystem, Soap all joints using approved soap solutions. <br /> Company, and the cost of the test shall be, Paid by Contractor. 3. Pitch the product lines 1/4" fool from the p-jnvpblocks towards tile. tanks. Product Piping must be pitched upward conlinu ,ulsy from tanks to risers a minimum of 1/4" per <br /> fool. Traps or sags will not be permitted. Group) all piping and locale as shown on the plans. 3. THIRD TEST (After connecting pipingto tanks but prior to backfifin Apply r <br /> 4. Pitch the vent and vapor return lines 1 4' per fact towards the turps. Lines are to be laid straight, wing fittings for rdirectionol and alevotion changes pa ppy p assure air <br /> For work already installed (which must be uncovered in order to be lasted), if it is defective, the P / P g 3 9 9 (30 psi max) to test system. This pressure on all lines until paving is completed. There should <br /> F Contractor shall bear the expenses of such uncovering, testing, Inspection and replacement of be no loss of pressure during the remainder of the construction, <br /> defective material or construction, If the work is not found defective, Contractor will be allowed 5. Minimum ss-avers.of 2 1/2 inch separation for oil fiberglass piping at croF <br /> on increase in the contract price or an extension of the contract time, or both, directly Minimum of 6 1/2 inch separation between fiberglass piping Do not support piping with foreign objects, suchi as scraps of wood, pipe, that may damage 4, FOURTH TEST (After Backfilling and Patch Paving): Applies to product lines after backfill <br /> attributable to such uncovering, testing, eta in the trench, and the walls of the trench. piping. Use foam supports. and patching of concrete islands, slobs, and yard paving is completed. <br /> For bedding of piping runs and backfill of pipe trenches, refer to Section 02 and to subsequent Test lines using9rn <br /> p <br /> Petro Tile Hydrostatic Line Testi.. c ui ent or approved <br /> SAFETY: Contractor shall perform the work in accordance with safe practices, taking all reasonable SAFETY REQUIREMENT: No person shall enter a tank hole excavation below the 5 fl. deep level portions of this section. Representative to designate lest fluid. Test fluid <br /> Chad be assigned product, diesel fuel, or water. <br /> precautions to protect the Facility and adjacent facilities, workmen and the public and providing, unless the walls are shored or the sides sloped as prescribed by current OSHA regulations such os Contractor to comply fully with the Procedure Manual for the Operation of Line Tester. <br /> where reasonably necessary, barriers, guards. temporary bridges, lights and watchmen. While on 54 CFR 45894 Ord 29 CFR 1926.550, 651, and 652. No exceptions. State or local requirements CUTTING OF PIPE: <br /> the premises of Company or its affiliates all of Company's safety rules shall be strictly observed; that ore more restrictive than Company specifications are a be odhered to as though specified in Test pressure sholl be 50 psi ( 1.5 times operating pressure (150%) for a remote pump system <br /> in articular, smoking shall be limited to such locations and occasions as are specifically Company specifications. The Contractor is responsible for an design, materials, equipment. ermits, 1, FIBERGLASS PIPE: Cul with a fine—toothed !Hacksaw blade or an abrasive wheel on a with on allowable tolerance of 0.010 <br /> P 9 P Y P Y P P Y GPgal/hr. <br /> authorized in writing by Company, Contractor shall not perform or permit any act on the etc„ for shoring or side sloping a hal?. circular power s-uw. Use o saw guide or "Wrap Around' To ensure a square cut end. Cul pipe <br /> premises of Company a its affiliates which involves a fire or explosion Ihazord, including end most be within 1/8" of square. Vent lines (no phase E vapor recovery): <br /> welding, torch cutting and disposal of debris by burning, without prior vwrilten consent of FILL AND BACKFILL All fill materlol shall be of o granular nature, free from vegetation and <br /> E Company. extraneous material. Company Repre,enlotive simll inspect and approve the material before It 2, STEEL PIPE Cut with a hand or power or Drawer-operated pipe cutter, as in normal filling Unless required by local agency, no second test required. E <br /> is spread. Spread material in lifts not to exceed 12 inches and tamp thoroughly. When required practice, _ <br /> The contractor Is responsible for certifying that employees and subconifmclors are trained and by local code, General Caniraclor shall provide a compaction test for certification of fill. - Vent lines and vapor recovery piping (with phase II vapor recovery): <br /> certified in Hazardous Waste Operations and Emergency Response (HAZWOPER) in accordance TAPERING & REAMING. Taper oil cut fiberglass pipe ends to 1-3/4 degrees using one of the <br /> with 29 CFR 1910.120, tapering tools available from the pipe monufacturer, Protect pipe during tapering to prevent- Contractor is responsible for vent and vapor recovery i in systems passing an locally <br /> BALLAST: Use water as ballast under at] conditions where ballast is required. damage to pipe. The finish toper shall be smloolh, clean and free from surface defects. The P, P PP 9 Y P g Y Y <br /> length of toper for 2" 'diameter / pip / imposed test requirements. , <br /> WARNING! Tests indicate that prolonged or repeated exposure to petroleum substances, m liquid 3 P ape is I -5 d' and for 3' diameter pipe Is 1 -3 4". For other site <br /> or vapor form, may be harmful, Refer to Material Safely Data Sheets for specific information pipe, cansuit pipe monifocturer's instructions. <br /> on various petroleum products. DRY HOLE CONDITION: Tanks. with backfill to top of tanks, must be ballasted if there is any - - <br /> chance that surface ar subsurface woter will drier the tarok hole to o depth of 23" of greater Steel pipe ends are toteteamed. 1d -- <br /> above the boftarn of the tongs- 3 <br /> Follow manufacturers precautions for fiberglass piping, resins. or solvents; used in assembling lila BONGING & ADHESIVE SYSTEMS (Fiberglass Pipe): Art n facture pipe surfaces ec be bonded _-- -- <br /> piping system. Caution - Da not bal'ast tanks until backfill Is M top of tanks, shall be cleaned with solvent supplied by pipe manufacturer_ If tapered section is wet or mast, - - <br /> dry with propane torch - do not overheat or blurn the pipe, If temperature is below 60' F (16' C). <br /> mDwarm all tapered surfaces prior to applying resin or use epoxy adhesive as recommended by•fhe D <br /> y WET HOLE CONDITION: Attempt to pump water trop the lank role to mantoin a "Dry Hole manufacturer on oil bell and spigot joints. Iwtix adhesive thoroughly in accordance with _ <br /> Condition" If anoble to Obtain a 'Dry Hole r dH'wn," notify Company Representative who will manufactarer's Instructions and apply to both snirfaces. Insert the spigot end into the bell using <br /> 02 EXCAVATION AND BACKFILLdeterminethe course of action. Install filler (,brei tie-down "logs" and bedding as specified a slight turning motion (one-half turn to a full turn Is necessary) and push, <br /> (Supplement to Construction Specifiaal!ons, M.O.S, 243) elsewhere. Set tank in hole, partially 611 with water until it sinks firmly on the bed. Use only —. <br /> enough water to ballast tank until backfill is to lop of lank. After backfill to lop of tank, fill Apply pressure until mechanical lock is achievred. Maintain back axial pressure on off previously <br /> tank with woter until completion of Installation. assembled joints to reduce the chance of separation. <br /> REMOVAL OF EXISTING TANKS AND PIPING SYSTEMS: Contraclor will furnish permits, Taber MARK DATE REVI8I0N3 INFTIAL <br /> and proper equipment. except as noted, to remove existing tanks and lines per the 1ollow6ay Caution - Bollos, level must never exceed ,voter or backfill leve; in the hole during installation. Inspect all fittings for proper alignment and payssible "b)rk-out" at the joints, (� <br /> procedure. Do not remove ballast until lank slab has been poured Do npot set remote pump motor until U.G. TANK AND PIPING <br /> i ballast water has been removed from tank. Follow pipe manufacturer's recom,nendcions on cure tune before disturbing joints or testing, <br /> Contractor, as part of the contract, will execute and comply with the Company's "Addendum If it Is anticipated that the temperature will inch below or F (16' G) of any time during the INSTALLATION <br /> A ST A LL A TION <br /> Tank Disposal Certification Agreement." curing process. apply heat to the joints. Only ,chemical or eleciricOl devices recommended by �Vt7 l`� /-� <br /> TANK HOLD-DOWNS (ila--Dawns): Install hold-down "b>ys" of all locations wt1h known water pipe rnunufacturer are acceptable for this porpoise. Do not use Open flame or sparking devices, <br /> oC All tanks and piping shall be removed and disposed of In accordance with the Addendum Tank conditions and at those locations where nater Is found during lank "ctr:io!,Dns Refer to " Tank such as propane torches, to cure resin. <br /> Disposal Cerlificotion Agreement and applicable store and local regulations, Hold-Down" drawing for design, fabrication and installotion requ,rernents, and to Section 05 of 9-32$2 <br /> o these specifications and drawing F-9 (N-PET-F9P-I.DWG) pp j perfect 8660 LOWER SACRAMENTO ROAD, <br /> a Removal of tanks and lines shall comply with API Recommended Practice 1604, Removal and THREADED JOINTS: Threaded steel e oink must be reamed and have clean cut, <br /> threads and be made up with non-hardening jjoinl compound insoluble in petroleum products STOCKTON, CA. <br /> a Disposal of Used Underground Storage Tanks - December 1987 and March 1989 supplement. REMOTE TURBINE: Contractor to verify turbine head will be 4-6" above funk bottom. Do not approved by Company Representutive. <br /> i� Contractor shall also comply with current NFPA and local regulations. install turbine if turbine shaft length exceeds lank diameter plus bur,oi depth! Typical joint compound: <br /> o <br /> M <br /> an Company Representative is responsible for removal of all reusable product from the tanks. Notify Company Representative, who will determine lne course of action, if shaft exceeds tank Rectorseal Chevron <br /> Product will be returned to terminal or other company facility. diameter plus burial depth. Gilberto Pipe Joint Compound <br /> Excavate to the to of each tank. Care must be token to prevent breokln an in and or appromotexved <br /> 57 <br /> P P tr Y piping or approved equal <br /> releasing product in lila environment. Prior to starting excavation, lila contractor shall ensure <br /> 6 power is shut off to any circuit, whose conduit may cross the excavation. - FIBERGLASS TO STEEL PIPE OR FLEXIBLE CONNECTC)RS: Tweed fiberglass threaded-end Northwest Region <br /> adopters into the steel pipe or fitting before bonding onto the fiberglass pipe. Use male end B <br /> fiberglass fitting when connecting to flexible connectors. All flexible connectors ore male-swivel by <br /> female. The female end connects to the fiberglass piping. ROBERT H. LEE & ASSOCIATES, INC. <br /> ARCHRECTURE ENQINEERIN A ENVIRCNk E,nrAL 8EAYICEB <br /> 1137 NORTH MCDO',VELL BOULEVARD PETALUMA CA. 94954 (707) 765-1660 <br /> JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIVIL ENGINEER <br /> N <br /> RHL REVIEW INfT1AL DATE DATE: <br /> PRELIMINARY <br /> i� PLANNING DR. BY: --- <br /> F <br /> f.-a STEEL BID <br /> NOTE: T TING SINGLE WA BLDG PERMIT . , ,. APPR.: 1°� ! <br /> O GENERAL BIO „ ir, A <br /> A <br /> Z VERIFY ALL RISER LOCATIONS IN FIELD. PHIL # 8348.10 <br /> PERMIT REVS —'- <br /> I <br /> CONSTRUCTION SH LI <br /> Q Do not use drawing <br /> for construction <br /> K It unless in Hialed <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ' <br />