Laserfiche WebLink
0 <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />Complete the following checklist: <br />E <br />RECEIVED <br />MAY 18 2015 <br />ENVIRONMENTAL <br />X Yes <br />1 ❑ No' <br />I Is the audible <br />alarm operational? HFAIT14hroAcRAckir <br />X Yes <br />❑ No• <br />Is the visual alarm operational? <br />X Yes <br />❑ No` <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />X Yes <br />❑ No` <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />proper operation? <br />❑ Yes <br />❑ No` <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />X WA <br />X Yes <br />❑ No` <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />❑ WA <br />detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) <br />X Sumprrrench Sensors; Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks and sensor <br />failure/disconnection? X Yes; ❑ No. <br />❑ Yes <br />❑ No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />X WA <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />of tank capacity does the alarm trigger? % <br />X Yes• <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E, below. <br />_ Yes' <br />X No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ Product; ❑ Water. If <br />es, describe causes in Section E, below. <br />X Yes <br />❑ Ne <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />X Yes <br />❑ No' <br />Is all monitoring equipment operational per manufacturer's specifications? <br />' In 5ection E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />_PREMIUM STP #2 SENSOR WAS REPLACED, RETESTED AND PASSED <br />Monitoring System Certification Page 2 of 4 12107 <br />2/21/07 <br />