My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_1985-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
2300 - Underground Storage Tank Program
>
PR0231627
>
BILLING_1985-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:42 PM
Creation date
11/5/2018 7:20:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1985-2002
RECORD_ID
PR0231627
PE
2381
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 E FRONTAGE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\11396\PR0231627\BILLING 1985-2002.PDF
QuestysFileName
BILLING 1985-2002
QuestysRecordDate
8/30/2017 4:23:51 PM
QuestysRecordID
3613151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 �°'�..,..9 c <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD i M1 <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �� <a <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: I I L3 ?1a AA 9 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# .0-- / B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) 40VC D. TANK CAPACITY IN GALLONS: /v ODV <br /> IL TANK CONTENTS <br /> CONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A. N/1 1 MOTOR VEHICLE FUEL ❑ 4 OIL B.��yyy C. ❑ is REGULAR UNLEADED DIESEL ❑ 6 AVIATION GAS <br /> `yO�' 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ ib PREMIUM UNLEADED ED <br /> 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 10 MIDGRADE UNLEADED ❑ 5 JET FUEL8 M85 <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED El 99 OTHEfl(D RISE IN ITEM D.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,8,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLIE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLAD SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE ALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK 1 BARE STEE ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL 0 W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100 ETHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN 99 HER <br /> C.INTERIOR ❑ 1 RUBBER UNED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING El/PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIB \WITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> E.SPILL AND OVERFILL,61C. DROP TUBE YES_ NO STRIKER PLATE YES NO_ DISPENSER CONTAINMENT YES_ NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROU OR U IF UNDERGROU .BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRE URE A 3 GRAVITY A U 4 FLEXIBLEPIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2DOUBL ALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS L A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODI PRO CTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION4 WMCNIC UNE 1 MECNAM, lF.AI( IGHTNESS 3 C <br /> i OWINU IMERSMAL UTOWnC PUNP ❑ <br /> ❑ DETECTORA UNE ❑2 LINE TTESTING MQNTC61N ❑ [FAN DETECTOR ❑5 ASHUTDOWN 99 MERV.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 MANUAL INVENTORY <br /> ❑ 3 VADOZEMONITORING <br /> ❑ 4 GAUGINAUTOMATG MONITORING <br /> TANK ❑ 5 GROUND MONTORINGTER ❑ 6 TESTING <br /> ❑ 7 <br /> MONITORING INTERSTITIAL ❑ 8 SIR ❑ 9 TANK GA MANGA 10 M.TINGY TANK ❑ 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST UBED( R) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUEAND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED 8 SIGNATURE? <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW 2 3 & <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# Al 71 <br /> PERMIT NUMBER ERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PULE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE LoGROUND STORAGE TANK REGULATIONS <br /> FORMS (6-95) _7 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.