Laserfiche WebLink
2"0 D.W. PRODUCT LINES (TIP.) ��„ ' RAISE MANHOLE - - <br /> �Q COVERS I " - TYP INSTALL PRESSURE/VACUUM O <br /> 10� ,. '^ RELIEF VALVE-CARO APPROVED <br /> 18 0 MANHOLE FOR 0 <br /> ANNULUS MONITOR EflES54HE, 3.0' WATER COLUMN LIAR, U <br /> VACUUM: e.0' WATER COLUMN-NAR. ::5 , <br /> 1 SLOPE 6" THK REINF. <br /> Q TYPICAL FREE-SIAHDINC � o <br /> FIBERGLASS DOUBLE WALL w CONC. SLAB PIPE SUPPORT 02 a <br /> 3" TEE l " CROWN TYP. 7 v 1 �. ABOVE FINISH GRADE Q <br /> . R _� 4 BUCK IRON RISERS 12'-0' i l• \ < n <br /> 2' SINGLE WALL <br /> .�,[�`' � I VENT <br /> FROMGLASS DIE EL TANK.LINE <br /> SQ 1" FIBERGLASS <br /> 1 Q­ <br /> VAPOR MANIFOLD LINE TAT, I 3' SINGLE WALL <br /> �kS I 6 MIL POLYETHYLENE FIBERGLASS VENT LINE <br /> I BARRIER FROM GASOLINE TANKS <br /> SLOPE VENT UP 1/4' PER FT, i <br /> 3/4 ' CONDUIT & SEAL-OFF I <br /> INTRINSICALLY SAFE WIRING I [�M TANK i0 VENT ASCR------------- <br /> INTRINSICALLY <br /> - --" -_� <br /> TYP/CAL CROSS 01/" P/P/NG AT TANK 4"0 STEEL RISER FOR <br /> FOR ANNULUS MONITOR I ANNULUS PROBE SLOPE VAPOR 2/VENT NW ER UP 1%4• TER FT - <br /> I FROM TAANSIION AT LOW GRAN WSOUNE <br /> CAP FOR ANNULUS PROBE <br /> 4", VAPOR RISER, ADAPTER, <br /> CONDUIT TO NEXT AND CAP <br /> PROBE OF SAME TANK <br /> CONDUIT TO <br /> ADJACENT TANK IF JOBSITE AIR PRESSURE TEST REQUIRED, THE PRIMARY <br /> (INNER)TANK MAY BE PRESSURISED UP TO S.P,P.I. <br /> THE (OUTER)TANK MAY BE TESTED BY VACCUUM ONLY. <br /> THE OUTER TANK RECEIVES A 35,000 VOLTS HOLLIDAY <br /> TEST AT THE FACTORY. <br /> 18"0 MANHOLE FOR 4"0 STEEL RISER <br /> ANNULUS MONITOR— U <br /> HOME RUN CONDUIT UNDERGROUND PIPING AND PLUMBING GENERAL NOTES <br /> OR FROM ADJACENT ELEC. J-BOX FOR INTRINSIC 18"0 SPILL CONTAINMENT <br /> TANK WIRING AND PROBE CORD MANHOLE FOR TRUCK VAPOR 1. ALL WORK,INCLUDING PLUMBING AND ELECTRICAL, SHALL BE PERFORMED IN O <br /> ACCORDANCE WITH LOCAL ADOPTED BUILDING CODES AND SUPPLEMENTRY <br /> ORDINANCES, <br /> 2. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE. <br /> TRUCK VAPOR I PLAN NOTIFY OWNER R TO DISCREPANCIESENCING BETWEEN SITE CONDITIONS AND < 6 <br /> TANK ANNULUS PLAN 3. ALL BACKFILL OF UTILITY TRENCHES TO BE CLEAN WASHED PEA GRAVEL, <br /> OR SAND. <br /> 4. TANK&PRIMARY PIPING SHALL BE HYDROSTATICALLY OR PNEUMATICALLY <br /> TESTED , <br /> OBSERVATION MANHOLE 2"X24" FLEX CONNECTOR 36" DIA, WEATHER-TIGHT 5. INSPECTION OF ALL SECONDARY CONFAINMENTK,INCLUDING TESTING, WILL <br /> MANHOLE COVER WITH HE IN ACCORDANCE WITH MANUFACTURE'S GUIDELINES. <br /> LOCATE OVER VESSEL MONITOR SCREWS AND GASKETS 6. - FINAL INSPECTION, INCLUDING ALL PORTIONS OF THE LEAK DETECTION <br /> 1 /4" S.S. TUBING—DRAIN �� � � SYSTEM SHALL BE IN ACCORDANCE WEEN MANUFACTURER'S GUIDELINES, <br /> 4"X2"X4" TEE W/REDUCERS NIPPLES AND CELBOWS E <br /> 7. TANK SYSTEM INTEGRITY TESTS WILL DE FORWARDED AND APPROVED BY <br /> SEE ALTERNATE CONNECTION <br /> ENVIRONMENTAL HEALTH PRIOR TO TANK SYSTEM BEING PLACED IN <br /> / <br /> / <br /> 2"o CHECK VALVE, OPERATION. <br /> ELECTRONIC TANK LEVEL PROBE UNION AND NIPPLES <br /> , 8. ELECTRONIC LEAK DETECTION SYSTEM SHALL BE EQUIPPED WITH AUDIBLE <br /> AND VISUAL ALARM, WIRED TO PROVIDE POSITIVE TURBINE SHUT DOWN OF <br /> LIQUID DETECTOR-VESSEL MONITOR TURBINE PUMP <br /> I CONDUIT ENTRANCE SEAL PRODUCT WHEN THE SYSTEM IS ACTIVATED. <br /> 1 PLUG SPARE BUNG THRU VESSEL (ALL COND.) 9. CONTRACTOR SHALL PROVIDE TO CIFIRE DEPT.OFFICAL AN ACCEPTABLE <br /> 1 /2" BALL VAl4E & 1 /2" TEE I ® 0 0 <br /> INTRINSIC CONDUIT PLAN TO INERT TANKS DURING CONSTRUCTION. <br /> PIPING SEAL •THRU -- -� .1 O INTRINSIC CONDUIT 10, PRIOR TO SYSTEM START-UP,A TANK AND PIPE INTEGRITY TEST MUST BE SCN-f <br /> CONTAINMENT VESSEL COMPLETED AND WITNESSEDTO THE APPROVAL OF CITY FIRE DEPT.OFFICAL <br /> 2" DOUBLE WALL-- "FACET INTERNATIONAL" II. ALL AQMD TESTS REQUIRED MUST BE SUCCESSFULLY COMPLETED AND SUB- <br /> PRODUCT CINE o FILTER SEPARATOR MITTED TO AQMD. <br /> SECONDARY `TEST FITTING 1/2"X1/4" RED. STREET ELL <br /> REMOVE AFTER TEST AND _���/// N� 1/2" BALL VALVE & B.I. NIPPLE EEr <br /> LEAVE SECONDARY PIPE OPEN ��. <br /> 48' 0 F.G. CONTAINMENT VESSEL - - - BA ELL, NIPPLES, SHUT-OFF <br /> BALL VALVE, TEE & FLEX CONN. <br /> 1 /4" S.S. TUBING-VENT ALL SUB-CONTRACTORS ARE REQUIREDTO SUBMIT WORKERS'COMPENSATION <br /> CERTIFICTS PRIOR TO START OF WORK <br /> or, 5 Yt9T5 <br />