My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2011 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
BILLING_2011 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:43 PM
Creation date
11/5/2018 7:56:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2011 - 2015
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\24323\PR0231947\BILLING 2011 - 2015.PDF
QuestysFileName
BILLING 2011 - 2015
QuestysRecordDate
2/13/2017 7:50:00 PM
QuestysRecordID
3337052
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iJNIFIED PROGRAM CONSOLIDATED FOR <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ff2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) e.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) Al ��� 3. <br /> BUSINESS SITE ADDRESS 101- CITY 104. <br /> II:EQUIPMENT TESTING R 44EVENTIVE MAINTENANCE <br /> Testing, preventive maintenance,and calibration of monitoring equipment(e.g.,sensors, probes, line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR L2632. <br /> MONITORING EQUIPMENT IS SERVICED 2-T ANNUALLY ❑ 99.OTHER(Specify): ago-eb <br /> III.MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. .SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULTS)WITH AUDIBLE AND VISUAL A ARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT,IS: a.DRY ❑nb.'"LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> -_---__---PANEL MANUFACTURER: Y _ J 490-� MO_DEL -_ <br /> LEAK SENSOR MANUFACTURER: da t °90-9. MODEL#(S): 0�= O - -lo <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR 940%J) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> _ IN_-TANK PROBE MANUFACTURER: 49x14. MODEL#(S): <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> --------------------------____--___------------- - __ -_______.-. _. _ __ <br /> __ _________ <br /> PROGRAMMED TESTS: ❑ a.0.1 gF.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 4490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 490-22 <br /> ❑ 5.TANK INTEGRITY TE5.TING(23 CCR§2643.1): 490 23 <br /> TEST FREQUENCY: V a.ANNUALLY El b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> El99.OTHER (Specify). 490-26 <br /> 490-21 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that appl <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: [ffa.DRY ❑b.LIQUID FILLED c.PRESSURIZED ❑d.UNDER VACUUM 090-29 <br /> PANEL MANUFACTURER:___ _ _ 490'30 MODEL! Lr 0 - <br /> _ r" <br /> LEAK SENSOR MANUFACTURER: / /�U 490-32 MODEL#(S). y 490J3 <br /> PIPING LEAK ALARM TRIGGERS A TOM TIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑b.NO 490x4 <br /> AI LU RE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED_23 CCR X�2/636) - 490-36 <br /> MLLD MANUFACTURER(S). I/ 490-37 MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR LLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURERS) -_-_ 490-40.1 MODEL#(S)_ _ _ 49CWt <br /> _--_ --- -- -----------_--_-_-_-_---_._.-__ ____._.___ ______________________________ _ <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 <br /> g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> UL LLLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. Ela.YES ❑b.NO 490-44 <br /> 4.PIPE INTEGRITY TEST G 490-45 <br /> TEST FREQUENCY <br /> a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49046490.4] <br /> ❑ 5.VISUAL PIPE MOlyt'I'ORING. 490411 <br /> FREQUENCY [Va.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> •Allowed fmmonimrin ofunbuded eme a ermorfuel pipinmonlrHSC§252815(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA(23 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.71S CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.