Laserfiche WebLink
1 2 3 4 5 6 7 <br />36" MULTIPORT MANHOLE WITH <br />CONTAINMENT SUMP LIQUID TIGHT FILL BOX <br />36" MULTIPORT SUMP SHIELD <br />MANHOLE <br />PA <br />27 FUEL TANK COLOR CODED PRODUCT COLLAR <br />MANWAY <br />4" TOP SEAL ADAPTOR AND CAP <br />7 FRP VENT LINE + 4" NIPPLE <br />SUMP PENETRATION <br />BOOT <br />2" MIN. <br />2" BELLxMALE FRP 4" MAX. <br />THREADED ADAPTOR' <br />2"X18" FLEX CONNECTOR r. <br />MALE SWNEL/FEMALE <br />L <br />PEA GRAVEL <br />COMPRESSIBLE STYROFOAM <br />(IF LESS THAN 7 FROM SLAB) <br />4"-300N COUPLING <br />CONTAINMENT SUMP <br />REDUCER <br />CONTAINMENT SUMP <br />TL 4" ALUMINUM FILL TUBE <br />K — <br />\ 4" SCH. 40 RISER <br />PRIMED AND WRAPPED <br />TANK FITTING <br />V VA FIBERGLASS CONTAINMENT SUMP <br />TO TANK COLLAR TO INSURE <br />WATER TIGHTNESS <br />SEAL AT PLATE CONNECTION <br />,J 22" TANK MANWAY <br />2' 90' S EEL <br />ELBOW <br />SEE NOTE BELOW <br />7x18" FLEX CONNECTOR - <br />MALE SWNEL/FEMALE - <br />SEE NOTE BELOW <br />7 BELLxMALE F.R.P. <br />THREADED ADAPTOR , <br />SEE NOTE BELOWt <br />7 5 FRP-0ELBOW <br />SEE NOTE BELOW <br />H SUMP PENETRATION '+ NOTES: <br />BOOT <br />7 FRP PHASE II 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT <br />NOTE: VAPORSEE RE BELOW 145 SEO.C'NIG SUMPS PREFERRED. 29 MAXIMUM ALLOWABLE <br />PENETRATION ANGLE, <br />I. VAPOR RETURN LINE TO THE FALL-OUTTA.N I< 5NAU.yL° 2. USE SUMP PENETRATION BOOTS AT ALL <br />3�FR.P. IN 4 SEC, CON'r,WITH A 3"x18" ' PENETRATIONS OF SUMP. <br />MALE/FEMALE-SWIVEL FLEX CONNECTOR. <br />REFER TO SHEET F -I AND THE PIPING 3. ALL JUNCTION BOXES <br />OF OFARE <br />SUMP. <br />TO BE PLACED WITHIN <br />PLAN SPECIFIC TO THE SITE. 1'-0" OF THE T <br />L T7 Tui VENT ANS VAPOR PLAN 3A FII I nFTAIL <br />Q SCALE: i'=1'-0" SCALE: 1"=1'-0" <br />O <br />r - <br />F <br />r <br />w D <br />N <br />Eli <br />+.L <br />B <br />SIDE VIEW ;T TANK BOTTOM <br />INSTALLATION CABLE <br />SENSOR <br />D ANNULAR SPACE MONITOR DETAIL / <br />SCALE: 1"=1'-0" <br />10 , 11 ., 12 1 13 , 14 1 15 1 16 1 17 <br />36" MULTI PORT MANHOLE WITH 36" MANHOLE <br />VAPOR RECOVERY ADAPTOR LIQUID TIGHT FILL BOX INSTALL OBSERVATION PORT <br />AND CAP SUMP SHIELD OVER SUMP PROBE <br />ALIGN OBSERVATION PORT IN <br />4" NIPPLE — CEI TLM PROBE MOUNTING FITTING MANHOLE WITH THAT OF THE 3/4" EXPLOSION <br />API COLORED REFLECTOR CONTAINMENT SUMP COVER. <br />PROOF 45' ELBOW <br />4" CAP ON RISER COMPRESSIBLE STYROFOAM SEAL OFF <br />PEA GRAVEL JUNCTION BOX (IF LESS THAN 2" FROM <br />SLAB) <br />PIPE CAP WITH HOLE <br />PIPE CAP WITH HOLE FOR CONTAINMENT SUMP FOR CONTROL WIRES <br />CONTROL WIRES <br />2" MIN. REDUCER <br />4" MAX. COMPRESSIBLE STYROFOAM (IF LESS - <br />••. • .. THAN 2" FROM SLAB) • •" "•♦ <br />z <br />o. <br />CONTAINMENT SUMP --- - - JUNCTION BOX (EXPLOSION PROOF) PEA GRAVEL <br />REDUCER <br />-- 1 SEAL OFF <br />4"-300# COUPLING 3/4" CONDUIT FOR ELECTRONIC TANK TURBINE PUMP JUNCTION BOX <br />GAUGE WITH SEAL OFF - REFER TO <br />4' SCH. 40 RISER ELECTRICAL SHEETS (EXPLOSION PROOF) <br />PRIMED AND WRAPPED 2" NIPPLE SEAL OFF <br />3/4" CONDUIT REMOTE PUMP J -BOX <br />3/4" CONDUIT FROM I (F BALL VALVE SUMP PENETRATION <br />ANNULAR SPACE MONITOR I SUMP PENETRATION BOOT (FULL PORT) � BOOT (FOR CONDUIT) <br />JUNCTION BOX (FOR CONDUIT) <br />2" CLOSE NIPPLE I i' CONDUIT TO <br />I <br />2' BELLxMALE F.R.P, I 4' SCH. 40 RISER,PRIMED &WRAPPED 7 TEE CEI CONTROL PANEL <br />I <br />THREADED ADAPTOR 3/4" CONDUIT FROM I ELEC. PANEL <br />IT TO <br />2'x1B" FLEX CONNECTOR SEE NOTE FILL SUMP J -BOX <br />SUMP PENETRATION BOOT I MALE SWIVEL/FEMALE1 (PUMP POWER) <br />3" 102REDUCER BOOT W/TEST 3 SUMP PENETRATION BOOT <br />I F-2 (FOR CONDUIT) LINE PRESSURE <br />2" F.R.P. VENT LINE PORT (4' TOS AT REG. TAW) I TRANSDUCER <br />SLOPE 1/4" PER FT. I 2" FR.P. PHASE II VAPOR RETURN 2" CLOSE NIPPLE <br />MINIMUM DOWN TO TANK <br />IN 3 FHP SECONDARY CONT. (F BALL VALVE <br />Imm PIPE l3 IN 4" AT EEO. TANK) e (FULL PORT) <br />SEE NOTE F-2 2"zi8" MALE SWIVEL x <br />2" X 18' FLEXIBLE SUMP PENETRATION BOOT FEMALE FLEXIBLE CONNECTOR I SUMP PENETRATION <br />CONNECTOR F 1 3 NOTE: DO NOT EXCEED I BOOT (FOR PIPE) <br />MALE SWNEL/FEMALE ca 7 45' F.R.P. SEE NOTE MANUFACTURERS SPECIFIED T FRP PRObUCT <br />z F-2 BEND RADIUS, 1 PIPE IN 3" FRP <br />EXTRACTOR FITTING 'a 2" BELLxMALE F.R.P. SECONDARY CONT. <br />i - w THREADED ADAPTOR aPIPE <br />27 TANK. MANWAY SEE NOTE <br />4" RISER PIPE <br />4" SCH. 40 NIPPLE AND 4' COUPLING 1" PVC PIPE OPEN AT F-2 PRIMED AND WRAPPED <br />TO ADJUST FLOAT EXTENSION TO <br />REQUIRED LENGTH BOTTOM. ATTACH TO SUMP <br />AS NEEDED FOR SUPPORT. 4" N.P.T. 1" PVC PIPE OPEN AT <br />3" 95% FLOAT VENT/VAPOR- BOTTOM, ATTACH TO SUMP <br />VALVE API/RONAN LS -3 PROBE 4„ N•P.T• AS NEEDED FOR SUPPORT. <br />- PLUGGED API/RONAN <br />NOTES: PRODUCT <br />T FLOAT NOTES: LS -3 PROBE <br />WATER 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT _ - 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT 3"x2^ REDUCER WITH <br />SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE - SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE - OPEN NPT PORT FOR <br />PENETRATION ANGLE. BOTTOM LOCKING NUT PENETRATION ANGLE. - SECONDARY CONT, <br />DRAINAGE <br />2. USE SUMP PENETRATION BOOTS AT ALL STEEL PLATE AT TANK BOTTOM 2. USE SUMP PENETRATION BOOTS AT ALL <br />PENETRATIONS OF SUMP. PENETRATIONS OF SUMP. 7 SCH. 40 FRP BELL <br />3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN x MALE THREADED <br />V-0" OF THE TOP OF SUMP, I'-0" OF THE TOP OF SUMP, ADAPTOR <br />3B TLM PROBE, VENT AND VAPOR DETAIL 2 REMOTE PUMP DETAIL <br />SCALE: 1"=1'-O" <br />SCALE: 1"-1'-0" <br />PEA GRAWEL <br />xa a <br />9 �r I <br />/ 4" ALUMINUM FILL TUBE L. <br />/ <br />MONITOR PROBE TO LOW I I <br />END OF TANK. <br />SLOPE TANK i" IN 10' <br />DOWN TOWARDS FILL END I I <br />�Li <br />• STEEL PLATES UNDER EACH OPENING <br />BY TANK MANUFACTURER <br />2'-0 37'-0 1 2" <br />MIN. VERIFY W/ TANK MFG. <br />l 1) FIBERGLASS TANK AND EXCAVATION SECTION <br />INSTALLATION INSTRUCTIONS: <br />`r- <br />CONDUIT -J <br />1 2 <br />3 <br />4 <br />1. <br />INSERT FISH TAPE THROUGH ANNULAR SPACE, <br />7 8 <br />WALL <br />1. USING COMPRESSION RING AS A GUIDE, <br />DRILL PIPE/CONDUIT HOLE <br />AND BOLT <br />2. <br />ATTACH PULL -STRING TO SENSOR. <br />BELOW. <br />2. ASSEMBLE PARTS <br />3. <br />TAG SIGNAL CABLE AND PULL -STRING EACH <br />& <br />"- <br />CLAMP TO 60-IN.LBS. <br />TORQUE, <br />FLEXIBLE <br />PIPE/CONDUIT <br />HOLE SAW <br />18 FEET FROM SENSOR. (TYPICAL FOR <br />ENTRY BOOT <br />NORMAL SIZE <br />SIZE <br />SIZE <br />FE83075 <br />3/4"0 CONDUIT <br />3" <br />5/16"0 <br />B FOOT DIAMETER TANK.) <br />1"0 CONDUIT <br />3' <br />5/16"0 <br />FEB5200 <br />270 FRP PIPE <br />4 1/2" <br />5/16"0 <br />4, <br />ATTACH FISH TAPE TO PULL -STRING. <br />4 1/2" <br />5/16"0 <br />- NOTE- <br />SIIMP AND PFNFTRATIDNS <br />OF SIIMP SHAII RF WATER TIGHT. <br />5. <br />PULL SENSOR THROUGH ANNULUS. <br />JUNCTION BOX <br />6, <br />MATCH TAG MARK ON SIGNAL CABLE <br />SET TANK <br />DEPTH <br />TO ALLOW <br />E <br />< <br />- <br />AND PULL -STRING. <br />PRODUCT, <br />VAPOR <br />AND VENT <br />r <br />7. <br />SENSOR IS NOW POSITIONED AT <br />16" MANHOLE W/ <br />LINES TO <br />SLOPE <br />1/4" PER <br />o <br />I <br />BOTTOM CENTERLINE OF TANK. <br />SECURED LID <br />FOOT MIN, <br />DOWN <br />TO TANK. <br />1n <br />n <br />8. <br />PULL -STRING IS TO REMAIN <br />" <br />IN PLACE AND FUTURE. <br />WATER TIGHT SEAL <br />ACCESSIBLE. <br />ANNULAR SPACE <br />RISER CAP <br />4 <br />MONITOR TAG & <br />HOLDER <br />c;p <br />Y <br />F <br />o <br />� <br />I* MAXIMUM <br />3 <br />4" SCH. 40 NIPPLE <br />`4"-300k <br />COUPLING <br />l <br />3/4" 0 CONDUIT <br />TO FILL SUMP J -BOX <br />" <br />4" SCH. 4D PIPE RISER <br />PRIMED & WRAPPED <br />FILL TUBE <br />4" SCH, 40 PIPE RISER <br />6^ <br />PRIMED & WRAPPED <br />45' <br />MAX. <br />I <br />G <br />TANK <br />FITTING <br />STEEL <br />PLATE <br />SIDE VIEW ;T TANK BOTTOM <br />INSTALLATION CABLE <br />SENSOR <br />D ANNULAR SPACE MONITOR DETAIL / <br />SCALE: 1"=1'-0" <br />10 , 11 ., 12 1 13 , 14 1 15 1 16 1 17 <br />36" MULTI PORT MANHOLE WITH 36" MANHOLE <br />VAPOR RECOVERY ADAPTOR LIQUID TIGHT FILL BOX INSTALL OBSERVATION PORT <br />AND CAP SUMP SHIELD OVER SUMP PROBE <br />ALIGN OBSERVATION PORT IN <br />4" NIPPLE — CEI TLM PROBE MOUNTING FITTING MANHOLE WITH THAT OF THE 3/4" EXPLOSION <br />API COLORED REFLECTOR CONTAINMENT SUMP COVER. <br />PROOF 45' ELBOW <br />4" CAP ON RISER COMPRESSIBLE STYROFOAM SEAL OFF <br />PEA GRAVEL JUNCTION BOX (IF LESS THAN 2" FROM <br />SLAB) <br />PIPE CAP WITH HOLE <br />PIPE CAP WITH HOLE FOR CONTAINMENT SUMP FOR CONTROL WIRES <br />CONTROL WIRES <br />2" MIN. REDUCER <br />4" MAX. COMPRESSIBLE STYROFOAM (IF LESS - <br />••. • .. THAN 2" FROM SLAB) • •" "•♦ <br />z <br />o. <br />CONTAINMENT SUMP --- - - JUNCTION BOX (EXPLOSION PROOF) PEA GRAVEL <br />REDUCER <br />-- 1 SEAL OFF <br />4"-300# COUPLING 3/4" CONDUIT FOR ELECTRONIC TANK TURBINE PUMP JUNCTION BOX <br />GAUGE WITH SEAL OFF - REFER TO <br />4' SCH. 40 RISER ELECTRICAL SHEETS (EXPLOSION PROOF) <br />PRIMED AND WRAPPED 2" NIPPLE SEAL OFF <br />3/4" CONDUIT REMOTE PUMP J -BOX <br />3/4" CONDUIT FROM I (F BALL VALVE SUMP PENETRATION <br />ANNULAR SPACE MONITOR I SUMP PENETRATION BOOT (FULL PORT) � BOOT (FOR CONDUIT) <br />JUNCTION BOX (FOR CONDUIT) <br />2" CLOSE NIPPLE I i' CONDUIT TO <br />I <br />2' BELLxMALE F.R.P, I 4' SCH. 40 RISER,PRIMED &WRAPPED 7 TEE CEI CONTROL PANEL <br />I <br />THREADED ADAPTOR 3/4" CONDUIT FROM I ELEC. PANEL <br />IT TO <br />2'x1B" FLEX CONNECTOR SEE NOTE FILL SUMP J -BOX <br />SUMP PENETRATION BOOT I MALE SWIVEL/FEMALE1 (PUMP POWER) <br />3" 102REDUCER BOOT W/TEST 3 SUMP PENETRATION BOOT <br />I F-2 (FOR CONDUIT) LINE PRESSURE <br />2" F.R.P. VENT LINE PORT (4' TOS AT REG. TAW) I TRANSDUCER <br />SLOPE 1/4" PER FT. I 2" FR.P. PHASE II VAPOR RETURN 2" CLOSE NIPPLE <br />MINIMUM DOWN TO TANK <br />IN 3 FHP SECONDARY CONT. (F BALL VALVE <br />Imm PIPE l3 IN 4" AT EEO. TANK) e (FULL PORT) <br />SEE NOTE F-2 2"zi8" MALE SWIVEL x <br />2" X 18' FLEXIBLE SUMP PENETRATION BOOT FEMALE FLEXIBLE CONNECTOR I SUMP PENETRATION <br />CONNECTOR F 1 3 NOTE: DO NOT EXCEED I BOOT (FOR PIPE) <br />MALE SWNEL/FEMALE ca 7 45' F.R.P. SEE NOTE MANUFACTURERS SPECIFIED T FRP PRObUCT <br />z F-2 BEND RADIUS, 1 PIPE IN 3" FRP <br />EXTRACTOR FITTING 'a 2" BELLxMALE F.R.P. SECONDARY CONT. <br />i - w THREADED ADAPTOR aPIPE <br />27 TANK. MANWAY SEE NOTE <br />4" RISER PIPE <br />4" SCH. 40 NIPPLE AND 4' COUPLING 1" PVC PIPE OPEN AT F-2 PRIMED AND WRAPPED <br />TO ADJUST FLOAT EXTENSION TO <br />REQUIRED LENGTH BOTTOM. ATTACH TO SUMP <br />AS NEEDED FOR SUPPORT. 4" N.P.T. 1" PVC PIPE OPEN AT <br />3" 95% FLOAT VENT/VAPOR- BOTTOM, ATTACH TO SUMP <br />VALVE API/RONAN LS -3 PROBE 4„ N•P.T• AS NEEDED FOR SUPPORT. <br />- PLUGGED API/RONAN <br />NOTES: PRODUCT <br />T FLOAT NOTES: LS -3 PROBE <br />WATER 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT _ - 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT 3"x2^ REDUCER WITH <br />SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE - SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE - OPEN NPT PORT FOR <br />PENETRATION ANGLE. BOTTOM LOCKING NUT PENETRATION ANGLE. - SECONDARY CONT, <br />DRAINAGE <br />2. USE SUMP PENETRATION BOOTS AT ALL STEEL PLATE AT TANK BOTTOM 2. USE SUMP PENETRATION BOOTS AT ALL <br />PENETRATIONS OF SUMP. PENETRATIONS OF SUMP. 7 SCH. 40 FRP BELL <br />3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN x MALE THREADED <br />V-0" OF THE TOP OF SUMP, I'-0" OF THE TOP OF SUMP, ADAPTOR <br />3B TLM PROBE, VENT AND VAPOR DETAIL 2 REMOTE PUMP DETAIL <br />SCALE: 1"=1'-O" <br />SCALE: 1"-1'-0" <br />PEA GRAWEL <br />xa a <br />9 �r I <br />/ 4" ALUMINUM FILL TUBE L. <br />/ <br />MONITOR PROBE TO LOW I I <br />END OF TANK. <br />SLOPE TANK i" IN 10' <br />DOWN TOWARDS FILL END I I <br />�Li <br />• STEEL PLATES UNDER EACH OPENING <br />BY TANK MANUFACTURER <br />2'-0 37'-0 1 2" <br />MIN. VERIFY W/ TANK MFG. <br />l 1) FIBERGLASS TANK AND EXCAVATION SECTION <br />9 <br />SCALE: 1/4'=V-0" <br />10 <br />BACKFILL FOR DETAIL OF TANK SLAB <br />SHEET F-3 <br />T T j PUMP <br />TUBE <br />STEEL PLATE <br />4" <br />,1 <br />CONTRf1CTOR SHALL VERIFY THAT THE <br />TURBINE HEAD WILL BE BETWEEN 4' TO 6' <br />ABOVE THE TANK BOTTOM. DO NOT <br />INSTALL TURBINE PUMP ASSEMBLY IF <br />rr IS LE;S8 THAN 4' FROM BOTTOM <br />OF TANK. <br />REMOVE SHIPPING PADS FROM <br />TANK PRIOR TO INSTALLATION <br />SEAL ENTRY BOOT CONNECTION <br />TO CONTAINMENT SUMP <br />FLEXIBI <br />STAINU <br />CLAMP <br />SERRATED <br />FLANGED NUT <br />GENERAL NOTES <br />PIPE OR / <br />�L" <br />`r- <br />CONDUIT -J <br />1 2 <br />3 <br />4 <br />5 <br />6 <br />7 8 <br />9 <br />SCALE: 1/4'=V-0" <br />10 <br />BACKFILL FOR DETAIL OF TANK SLAB <br />SHEET F-3 <br />T T j PUMP <br />TUBE <br />STEEL PLATE <br />4" <br />,1 <br />CONTRf1CTOR SHALL VERIFY THAT THE <br />TURBINE HEAD WILL BE BETWEEN 4' TO 6' <br />ABOVE THE TANK BOTTOM. DO NOT <br />INSTALL TURBINE PUMP ASSEMBLY IF <br />rr IS LE;S8 THAN 4' FROM BOTTOM <br />OF TANK. <br />REMOVE SHIPPING PADS FROM <br />TANK PRIOR TO INSTALLATION <br />SEAL ENTRY BOOT CONNECTION <br />TO CONTAINMENT SUMP <br />FLEXIBI <br />STAINU <br />CLAMP <br />SERRATED <br />FLANGED NUT <br />GENERAL NOTES <br />PIPE OR / <br />�L" <br />`r- <br />CONDUIT -J <br />COMPRESSION RING <br />-INTERIOR <br />OF SUMP <br />WALL <br />1. USING COMPRESSION RING AS A GUIDE, <br />DRILL PIPE/CONDUIT HOLE <br />AND BOLT <br />HOLES THROUGH <br />SUMP WALL PER TABLE <br />BELOW. <br />2. ASSEMBLE PARTS <br />AS SHOWN ABOVE, UNIFORMLY <br />TIGHTEN ALL BOLTS <br />& <br />STAINLESS STEEL <br />CLAMP TO 60-IN.LBS. <br />TORQUE, <br />FLEXIBLE <br />PIPE/CONDUIT <br />HOLE SAW <br />BOLT HOLE <br />ENTRY BOOT <br />NORMAL SIZE <br />SIZE <br />SIZE <br />FE83075 <br />3/4"0 CONDUIT <br />3" <br />5/16"0 <br />FE83100 <br />1"0 CONDUIT <br />3' <br />5/16"0 <br />FEB5200 <br />270 FRP PIPE <br />4 1/2" <br />5/16"0 <br />FEB6300 <br />3"0 FRP PIPE <br />4 1/2" <br />5/16"0 <br />- NOTE- <br />SIIMP AND PFNFTRATIDNS <br />OF SIIMP SHAII RF WATER TIGHT. <br />1. ALL GASOLINE TANK RISERS AND FITTINGS TO BE SCHEDULE 40 BLACK IRON PIPING. <br />2. PRODUCT, VENT AND VAPOR LINE SIZE TO BE AS NOTED ON SHEET F -i ,AND PIPING PLAN. <br />3, ALL STEEL PIPE TO BE PRIMED AND WRAPPED. <br />4. SEE SITE PLAN FOR EXACT LOCATION OF PRODUCT TANKS, <br />5. SEE SITE PLAN FOR VENT RISER LOCATION. <br />6. J -BOX SHALL HAVE 2' MINIMUM CLEARANCE FROM SUMP WALL. <br />7. CONTACT CHEVRON ENGINEER REGARDING 15 GALLON SPILL BUCKET REQUIREMENTS. <br />=1L <br />IL <br />m1 <br />IJ <br />IH <br />Ww <br />F <br />E <br />D <br />TANK, SECTION AND DETAILS <br />12K GAL 8'+ "XERXES" DBL WALL <br />9-2396 c <br />25650 HWY 99 NO., <br />ACAMPO, CA. <br />wo Chevron <br />Northwest Region B <br />®ROBERT H. LEE & ASSOCIATES, INC. <br />ARCHRECTURE ENOINEERWO ENVIRONAAENfAL SERVICES <br />1137 NORTH McDOWELL BDULEVARD PETALUMA CA. 94954 (707) 765-1650 <br />JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIVIL ENGINEER <br />li REVIEW INIAL DATE DATE: 8/j8/-,3 <br />PRELIMINARY <br />PLANNING DR. BY: <br />STEEL BID <br />BLDG PERMIT I APPR" vG <br />q <br />GENERAL BID RHL H 8344.10 <br />PERMIT REVS <br />CONSTRUCTION SHEET <br />Do not use drawing F-2 <br />for construction r <br />unless initialed <br />12 13 14 15 16 17 18 <br />