1 2 3 4 5 6 7
<br />36" MULTIPORT MANHOLE WITH
<br />CONTAINMENT SUMP LIQUID TIGHT FILL BOX
<br />36" MULTIPORT SUMP SHIELD
<br />MANHOLE
<br />PA
<br />27 FUEL TANK COLOR CODED PRODUCT COLLAR
<br />MANWAY
<br />4" TOP SEAL ADAPTOR AND CAP
<br />7 FRP VENT LINE + 4" NIPPLE
<br />SUMP PENETRATION
<br />BOOT
<br />2" MIN.
<br />2" BELLxMALE FRP 4" MAX.
<br />THREADED ADAPTOR'
<br />2"X18" FLEX CONNECTOR r.
<br />MALE SWNEL/FEMALE
<br />L
<br />PEA GRAVEL
<br />COMPRESSIBLE STYROFOAM
<br />(IF LESS THAN 7 FROM SLAB)
<br />4"-300N COUPLING
<br />CONTAINMENT SUMP
<br />REDUCER
<br />CONTAINMENT SUMP
<br />TL 4" ALUMINUM FILL TUBE
<br />K —
<br />\ 4" SCH. 40 RISER
<br />PRIMED AND WRAPPED
<br />TANK FITTING
<br />V VA FIBERGLASS CONTAINMENT SUMP
<br />TO TANK COLLAR TO INSURE
<br />WATER TIGHTNESS
<br />SEAL AT PLATE CONNECTION
<br />,J 22" TANK MANWAY
<br />2' 90' S EEL
<br />ELBOW
<br />SEE NOTE BELOW
<br />7x18" FLEX CONNECTOR -
<br />MALE SWNEL/FEMALE -
<br />SEE NOTE BELOW
<br />7 BELLxMALE F.R.P.
<br />THREADED ADAPTOR ,
<br />SEE NOTE BELOWt
<br />7 5 FRP-0ELBOW
<br />SEE NOTE BELOW
<br />H SUMP PENETRATION '+ NOTES:
<br />BOOT
<br />7 FRP PHASE II 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT
<br />NOTE: VAPORSEE RE BELOW 145 SEO.C'NIG SUMPS PREFERRED. 29 MAXIMUM ALLOWABLE
<br />PENETRATION ANGLE,
<br />I. VAPOR RETURN LINE TO THE FALL-OUTTA.N I< 5NAU.yL° 2. USE SUMP PENETRATION BOOTS AT ALL
<br />3�FR.P. IN 4 SEC, CON'r,WITH A 3"x18" ' PENETRATIONS OF SUMP.
<br />MALE/FEMALE-SWIVEL FLEX CONNECTOR.
<br />REFER TO SHEET F -I AND THE PIPING 3. ALL JUNCTION BOXES
<br />OF OFARE
<br />SUMP.
<br />TO BE PLACED WITHIN
<br />PLAN SPECIFIC TO THE SITE. 1'-0" OF THE T
<br />L T7 Tui VENT ANS VAPOR PLAN 3A FII I nFTAIL
<br />Q SCALE: i'=1'-0" SCALE: 1"=1'-0"
<br />O
<br />r -
<br />F
<br />r
<br />w D
<br />N
<br />Eli
<br />+.L
<br />B
<br />SIDE VIEW ;T TANK BOTTOM
<br />INSTALLATION CABLE
<br />SENSOR
<br />D ANNULAR SPACE MONITOR DETAIL /
<br />SCALE: 1"=1'-0"
<br />10 , 11 ., 12 1 13 , 14 1 15 1 16 1 17
<br />36" MULTI PORT MANHOLE WITH 36" MANHOLE
<br />VAPOR RECOVERY ADAPTOR LIQUID TIGHT FILL BOX INSTALL OBSERVATION PORT
<br />AND CAP SUMP SHIELD OVER SUMP PROBE
<br />ALIGN OBSERVATION PORT IN
<br />4" NIPPLE — CEI TLM PROBE MOUNTING FITTING MANHOLE WITH THAT OF THE 3/4" EXPLOSION
<br />API COLORED REFLECTOR CONTAINMENT SUMP COVER.
<br />PROOF 45' ELBOW
<br />4" CAP ON RISER COMPRESSIBLE STYROFOAM SEAL OFF
<br />PEA GRAVEL JUNCTION BOX (IF LESS THAN 2" FROM
<br />SLAB)
<br />PIPE CAP WITH HOLE
<br />PIPE CAP WITH HOLE FOR CONTAINMENT SUMP FOR CONTROL WIRES
<br />CONTROL WIRES
<br />2" MIN. REDUCER
<br />4" MAX. COMPRESSIBLE STYROFOAM (IF LESS -
<br />••. • .. THAN 2" FROM SLAB) • •" "•♦
<br />z
<br />o.
<br />CONTAINMENT SUMP --- - - JUNCTION BOX (EXPLOSION PROOF) PEA GRAVEL
<br />REDUCER
<br />-- 1 SEAL OFF
<br />4"-300# COUPLING 3/4" CONDUIT FOR ELECTRONIC TANK TURBINE PUMP JUNCTION BOX
<br />GAUGE WITH SEAL OFF - REFER TO
<br />4' SCH. 40 RISER ELECTRICAL SHEETS (EXPLOSION PROOF)
<br />PRIMED AND WRAPPED 2" NIPPLE SEAL OFF
<br />3/4" CONDUIT REMOTE PUMP J -BOX
<br />3/4" CONDUIT FROM I (F BALL VALVE SUMP PENETRATION
<br />ANNULAR SPACE MONITOR I SUMP PENETRATION BOOT (FULL PORT) � BOOT (FOR CONDUIT)
<br />JUNCTION BOX (FOR CONDUIT)
<br />2" CLOSE NIPPLE I i' CONDUIT TO
<br />I
<br />2' BELLxMALE F.R.P, I 4' SCH. 40 RISER,PRIMED &WRAPPED 7 TEE CEI CONTROL PANEL
<br />I
<br />THREADED ADAPTOR 3/4" CONDUIT FROM I ELEC. PANEL
<br />IT TO
<br />2'x1B" FLEX CONNECTOR SEE NOTE FILL SUMP J -BOX
<br />SUMP PENETRATION BOOT I MALE SWIVEL/FEMALE1 (PUMP POWER)
<br />3" 102REDUCER BOOT W/TEST 3 SUMP PENETRATION BOOT
<br />I F-2 (FOR CONDUIT) LINE PRESSURE
<br />2" F.R.P. VENT LINE PORT (4' TOS AT REG. TAW) I TRANSDUCER
<br />SLOPE 1/4" PER FT. I 2" FR.P. PHASE II VAPOR RETURN 2" CLOSE NIPPLE
<br />MINIMUM DOWN TO TANK
<br />IN 3 FHP SECONDARY CONT. (F BALL VALVE
<br />Imm PIPE l3 IN 4" AT EEO. TANK) e (FULL PORT)
<br />SEE NOTE F-2 2"zi8" MALE SWIVEL x
<br />2" X 18' FLEXIBLE SUMP PENETRATION BOOT FEMALE FLEXIBLE CONNECTOR I SUMP PENETRATION
<br />CONNECTOR F 1 3 NOTE: DO NOT EXCEED I BOOT (FOR PIPE)
<br />MALE SWNEL/FEMALE ca 7 45' F.R.P. SEE NOTE MANUFACTURERS SPECIFIED T FRP PRObUCT
<br />z F-2 BEND RADIUS, 1 PIPE IN 3" FRP
<br />EXTRACTOR FITTING 'a 2" BELLxMALE F.R.P. SECONDARY CONT.
<br />i - w THREADED ADAPTOR aPIPE
<br />27 TANK. MANWAY SEE NOTE
<br />4" RISER PIPE
<br />4" SCH. 40 NIPPLE AND 4' COUPLING 1" PVC PIPE OPEN AT F-2 PRIMED AND WRAPPED
<br />TO ADJUST FLOAT EXTENSION TO
<br />REQUIRED LENGTH BOTTOM. ATTACH TO SUMP
<br />AS NEEDED FOR SUPPORT. 4" N.P.T. 1" PVC PIPE OPEN AT
<br />3" 95% FLOAT VENT/VAPOR- BOTTOM, ATTACH TO SUMP
<br />VALVE API/RONAN LS -3 PROBE 4„ N•P.T• AS NEEDED FOR SUPPORT.
<br />- PLUGGED API/RONAN
<br />NOTES: PRODUCT
<br />T FLOAT NOTES: LS -3 PROBE
<br />WATER 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT _ - 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT 3"x2^ REDUCER WITH
<br />SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE - SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE - OPEN NPT PORT FOR
<br />PENETRATION ANGLE. BOTTOM LOCKING NUT PENETRATION ANGLE. - SECONDARY CONT,
<br />DRAINAGE
<br />2. USE SUMP PENETRATION BOOTS AT ALL STEEL PLATE AT TANK BOTTOM 2. USE SUMP PENETRATION BOOTS AT ALL
<br />PENETRATIONS OF SUMP. PENETRATIONS OF SUMP. 7 SCH. 40 FRP BELL
<br />3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN x MALE THREADED
<br />V-0" OF THE TOP OF SUMP, I'-0" OF THE TOP OF SUMP, ADAPTOR
<br />3B TLM PROBE, VENT AND VAPOR DETAIL 2 REMOTE PUMP DETAIL
<br />SCALE: 1"=1'-O"
<br />SCALE: 1"-1'-0"
<br />PEA GRAWEL
<br />xa a
<br />9 �r I
<br />/ 4" ALUMINUM FILL TUBE L.
<br />/
<br />MONITOR PROBE TO LOW I I
<br />END OF TANK.
<br />SLOPE TANK i" IN 10'
<br />DOWN TOWARDS FILL END I I
<br />�Li
<br />• STEEL PLATES UNDER EACH OPENING
<br />BY TANK MANUFACTURER
<br />2'-0 37'-0 1 2"
<br />MIN. VERIFY W/ TANK MFG.
<br />l 1) FIBERGLASS TANK AND EXCAVATION SECTION
<br />INSTALLATION INSTRUCTIONS:
<br />`r-
<br />CONDUIT -J
<br />1 2
<br />3
<br />4
<br />1.
<br />INSERT FISH TAPE THROUGH ANNULAR SPACE,
<br />7 8
<br />WALL
<br />1. USING COMPRESSION RING AS A GUIDE,
<br />DRILL PIPE/CONDUIT HOLE
<br />AND BOLT
<br />2.
<br />ATTACH PULL -STRING TO SENSOR.
<br />BELOW.
<br />2. ASSEMBLE PARTS
<br />3.
<br />TAG SIGNAL CABLE AND PULL -STRING EACH
<br />&
<br />"-
<br />CLAMP TO 60-IN.LBS.
<br />TORQUE,
<br />FLEXIBLE
<br />PIPE/CONDUIT
<br />HOLE SAW
<br />18 FEET FROM SENSOR. (TYPICAL FOR
<br />ENTRY BOOT
<br />NORMAL SIZE
<br />SIZE
<br />SIZE
<br />FE83075
<br />3/4"0 CONDUIT
<br />3"
<br />5/16"0
<br />B FOOT DIAMETER TANK.)
<br />1"0 CONDUIT
<br />3'
<br />5/16"0
<br />FEB5200
<br />270 FRP PIPE
<br />4 1/2"
<br />5/16"0
<br />4,
<br />ATTACH FISH TAPE TO PULL -STRING.
<br />4 1/2"
<br />5/16"0
<br />- NOTE-
<br />SIIMP AND PFNFTRATIDNS
<br />OF SIIMP SHAII RF WATER TIGHT.
<br />5.
<br />PULL SENSOR THROUGH ANNULUS.
<br />JUNCTION BOX
<br />6,
<br />MATCH TAG MARK ON SIGNAL CABLE
<br />SET TANK
<br />DEPTH
<br />TO ALLOW
<br />E
<br /><
<br />-
<br />AND PULL -STRING.
<br />PRODUCT,
<br />VAPOR
<br />AND VENT
<br />r
<br />7.
<br />SENSOR IS NOW POSITIONED AT
<br />16" MANHOLE W/
<br />LINES TO
<br />SLOPE
<br />1/4" PER
<br />o
<br />I
<br />BOTTOM CENTERLINE OF TANK.
<br />SECURED LID
<br />FOOT MIN,
<br />DOWN
<br />TO TANK.
<br />1n
<br />n
<br />8.
<br />PULL -STRING IS TO REMAIN
<br />"
<br />IN PLACE AND FUTURE.
<br />WATER TIGHT SEAL
<br />ACCESSIBLE.
<br />ANNULAR SPACE
<br />RISER CAP
<br />4
<br />MONITOR TAG &
<br />HOLDER
<br />c;p
<br />Y
<br />F
<br />o
<br />�
<br />I* MAXIMUM
<br />3
<br />4" SCH. 40 NIPPLE
<br />`4"-300k
<br />COUPLING
<br />l
<br />3/4" 0 CONDUIT
<br />TO FILL SUMP J -BOX
<br />"
<br />4" SCH. 4D PIPE RISER
<br />PRIMED & WRAPPED
<br />FILL TUBE
<br />4" SCH, 40 PIPE RISER
<br />6^
<br />PRIMED & WRAPPED
<br />45'
<br />MAX.
<br />I
<br />G
<br />TANK
<br />FITTING
<br />STEEL
<br />PLATE
<br />SIDE VIEW ;T TANK BOTTOM
<br />INSTALLATION CABLE
<br />SENSOR
<br />D ANNULAR SPACE MONITOR DETAIL /
<br />SCALE: 1"=1'-0"
<br />10 , 11 ., 12 1 13 , 14 1 15 1 16 1 17
<br />36" MULTI PORT MANHOLE WITH 36" MANHOLE
<br />VAPOR RECOVERY ADAPTOR LIQUID TIGHT FILL BOX INSTALL OBSERVATION PORT
<br />AND CAP SUMP SHIELD OVER SUMP PROBE
<br />ALIGN OBSERVATION PORT IN
<br />4" NIPPLE — CEI TLM PROBE MOUNTING FITTING MANHOLE WITH THAT OF THE 3/4" EXPLOSION
<br />API COLORED REFLECTOR CONTAINMENT SUMP COVER.
<br />PROOF 45' ELBOW
<br />4" CAP ON RISER COMPRESSIBLE STYROFOAM SEAL OFF
<br />PEA GRAVEL JUNCTION BOX (IF LESS THAN 2" FROM
<br />SLAB)
<br />PIPE CAP WITH HOLE
<br />PIPE CAP WITH HOLE FOR CONTAINMENT SUMP FOR CONTROL WIRES
<br />CONTROL WIRES
<br />2" MIN. REDUCER
<br />4" MAX. COMPRESSIBLE STYROFOAM (IF LESS -
<br />••. • .. THAN 2" FROM SLAB) • •" "•♦
<br />z
<br />o.
<br />CONTAINMENT SUMP --- - - JUNCTION BOX (EXPLOSION PROOF) PEA GRAVEL
<br />REDUCER
<br />-- 1 SEAL OFF
<br />4"-300# COUPLING 3/4" CONDUIT FOR ELECTRONIC TANK TURBINE PUMP JUNCTION BOX
<br />GAUGE WITH SEAL OFF - REFER TO
<br />4' SCH. 40 RISER ELECTRICAL SHEETS (EXPLOSION PROOF)
<br />PRIMED AND WRAPPED 2" NIPPLE SEAL OFF
<br />3/4" CONDUIT REMOTE PUMP J -BOX
<br />3/4" CONDUIT FROM I (F BALL VALVE SUMP PENETRATION
<br />ANNULAR SPACE MONITOR I SUMP PENETRATION BOOT (FULL PORT) � BOOT (FOR CONDUIT)
<br />JUNCTION BOX (FOR CONDUIT)
<br />2" CLOSE NIPPLE I i' CONDUIT TO
<br />I
<br />2' BELLxMALE F.R.P, I 4' SCH. 40 RISER,PRIMED &WRAPPED 7 TEE CEI CONTROL PANEL
<br />I
<br />THREADED ADAPTOR 3/4" CONDUIT FROM I ELEC. PANEL
<br />IT TO
<br />2'x1B" FLEX CONNECTOR SEE NOTE FILL SUMP J -BOX
<br />SUMP PENETRATION BOOT I MALE SWIVEL/FEMALE1 (PUMP POWER)
<br />3" 102REDUCER BOOT W/TEST 3 SUMP PENETRATION BOOT
<br />I F-2 (FOR CONDUIT) LINE PRESSURE
<br />2" F.R.P. VENT LINE PORT (4' TOS AT REG. TAW) I TRANSDUCER
<br />SLOPE 1/4" PER FT. I 2" FR.P. PHASE II VAPOR RETURN 2" CLOSE NIPPLE
<br />MINIMUM DOWN TO TANK
<br />IN 3 FHP SECONDARY CONT. (F BALL VALVE
<br />Imm PIPE l3 IN 4" AT EEO. TANK) e (FULL PORT)
<br />SEE NOTE F-2 2"zi8" MALE SWIVEL x
<br />2" X 18' FLEXIBLE SUMP PENETRATION BOOT FEMALE FLEXIBLE CONNECTOR I SUMP PENETRATION
<br />CONNECTOR F 1 3 NOTE: DO NOT EXCEED I BOOT (FOR PIPE)
<br />MALE SWNEL/FEMALE ca 7 45' F.R.P. SEE NOTE MANUFACTURERS SPECIFIED T FRP PRObUCT
<br />z F-2 BEND RADIUS, 1 PIPE IN 3" FRP
<br />EXTRACTOR FITTING 'a 2" BELLxMALE F.R.P. SECONDARY CONT.
<br />i - w THREADED ADAPTOR aPIPE
<br />27 TANK. MANWAY SEE NOTE
<br />4" RISER PIPE
<br />4" SCH. 40 NIPPLE AND 4' COUPLING 1" PVC PIPE OPEN AT F-2 PRIMED AND WRAPPED
<br />TO ADJUST FLOAT EXTENSION TO
<br />REQUIRED LENGTH BOTTOM. ATTACH TO SUMP
<br />AS NEEDED FOR SUPPORT. 4" N.P.T. 1" PVC PIPE OPEN AT
<br />3" 95% FLOAT VENT/VAPOR- BOTTOM, ATTACH TO SUMP
<br />VALVE API/RONAN LS -3 PROBE 4„ N•P.T• AS NEEDED FOR SUPPORT.
<br />- PLUGGED API/RONAN
<br />NOTES: PRODUCT
<br />T FLOAT NOTES: LS -3 PROBE
<br />WATER 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT _ - 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT 3"x2^ REDUCER WITH
<br />SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE - SUMPS PREFERRED. 20' MAXIMUM ALLOWABLE - OPEN NPT PORT FOR
<br />PENETRATION ANGLE. BOTTOM LOCKING NUT PENETRATION ANGLE. - SECONDARY CONT,
<br />DRAINAGE
<br />2. USE SUMP PENETRATION BOOTS AT ALL STEEL PLATE AT TANK BOTTOM 2. USE SUMP PENETRATION BOOTS AT ALL
<br />PENETRATIONS OF SUMP. PENETRATIONS OF SUMP. 7 SCH. 40 FRP BELL
<br />3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN x MALE THREADED
<br />V-0" OF THE TOP OF SUMP, I'-0" OF THE TOP OF SUMP, ADAPTOR
<br />3B TLM PROBE, VENT AND VAPOR DETAIL 2 REMOTE PUMP DETAIL
<br />SCALE: 1"=1'-O"
<br />SCALE: 1"-1'-0"
<br />PEA GRAWEL
<br />xa a
<br />9 �r I
<br />/ 4" ALUMINUM FILL TUBE L.
<br />/
<br />MONITOR PROBE TO LOW I I
<br />END OF TANK.
<br />SLOPE TANK i" IN 10'
<br />DOWN TOWARDS FILL END I I
<br />�Li
<br />• STEEL PLATES UNDER EACH OPENING
<br />BY TANK MANUFACTURER
<br />2'-0 37'-0 1 2"
<br />MIN. VERIFY W/ TANK MFG.
<br />l 1) FIBERGLASS TANK AND EXCAVATION SECTION
<br />9
<br />SCALE: 1/4'=V-0"
<br />10
<br />BACKFILL FOR DETAIL OF TANK SLAB
<br />SHEET F-3
<br />T T j PUMP
<br />TUBE
<br />STEEL PLATE
<br />4"
<br />,1
<br />CONTRf1CTOR SHALL VERIFY THAT THE
<br />TURBINE HEAD WILL BE BETWEEN 4' TO 6'
<br />ABOVE THE TANK BOTTOM. DO NOT
<br />INSTALL TURBINE PUMP ASSEMBLY IF
<br />rr IS LE;S8 THAN 4' FROM BOTTOM
<br />OF TANK.
<br />REMOVE SHIPPING PADS FROM
<br />TANK PRIOR TO INSTALLATION
<br />SEAL ENTRY BOOT CONNECTION
<br />TO CONTAINMENT SUMP
<br />FLEXIBI
<br />STAINU
<br />CLAMP
<br />SERRATED
<br />FLANGED NUT
<br />GENERAL NOTES
<br />PIPE OR /
<br />�L"
<br />`r-
<br />CONDUIT -J
<br />1 2
<br />3
<br />4
<br />5
<br />6
<br />7 8
<br />9
<br />SCALE: 1/4'=V-0"
<br />10
<br />BACKFILL FOR DETAIL OF TANK SLAB
<br />SHEET F-3
<br />T T j PUMP
<br />TUBE
<br />STEEL PLATE
<br />4"
<br />,1
<br />CONTRf1CTOR SHALL VERIFY THAT THE
<br />TURBINE HEAD WILL BE BETWEEN 4' TO 6'
<br />ABOVE THE TANK BOTTOM. DO NOT
<br />INSTALL TURBINE PUMP ASSEMBLY IF
<br />rr IS LE;S8 THAN 4' FROM BOTTOM
<br />OF TANK.
<br />REMOVE SHIPPING PADS FROM
<br />TANK PRIOR TO INSTALLATION
<br />SEAL ENTRY BOOT CONNECTION
<br />TO CONTAINMENT SUMP
<br />FLEXIBI
<br />STAINU
<br />CLAMP
<br />SERRATED
<br />FLANGED NUT
<br />GENERAL NOTES
<br />PIPE OR /
<br />�L"
<br />`r-
<br />CONDUIT -J
<br />COMPRESSION RING
<br />-INTERIOR
<br />OF SUMP
<br />WALL
<br />1. USING COMPRESSION RING AS A GUIDE,
<br />DRILL PIPE/CONDUIT HOLE
<br />AND BOLT
<br />HOLES THROUGH
<br />SUMP WALL PER TABLE
<br />BELOW.
<br />2. ASSEMBLE PARTS
<br />AS SHOWN ABOVE, UNIFORMLY
<br />TIGHTEN ALL BOLTS
<br />&
<br />STAINLESS STEEL
<br />CLAMP TO 60-IN.LBS.
<br />TORQUE,
<br />FLEXIBLE
<br />PIPE/CONDUIT
<br />HOLE SAW
<br />BOLT HOLE
<br />ENTRY BOOT
<br />NORMAL SIZE
<br />SIZE
<br />SIZE
<br />FE83075
<br />3/4"0 CONDUIT
<br />3"
<br />5/16"0
<br />FE83100
<br />1"0 CONDUIT
<br />3'
<br />5/16"0
<br />FEB5200
<br />270 FRP PIPE
<br />4 1/2"
<br />5/16"0
<br />FEB6300
<br />3"0 FRP PIPE
<br />4 1/2"
<br />5/16"0
<br />- NOTE-
<br />SIIMP AND PFNFTRATIDNS
<br />OF SIIMP SHAII RF WATER TIGHT.
<br />1. ALL GASOLINE TANK RISERS AND FITTINGS TO BE SCHEDULE 40 BLACK IRON PIPING.
<br />2. PRODUCT, VENT AND VAPOR LINE SIZE TO BE AS NOTED ON SHEET F -i ,AND PIPING PLAN.
<br />3, ALL STEEL PIPE TO BE PRIMED AND WRAPPED.
<br />4. SEE SITE PLAN FOR EXACT LOCATION OF PRODUCT TANKS,
<br />5. SEE SITE PLAN FOR VENT RISER LOCATION.
<br />6. J -BOX SHALL HAVE 2' MINIMUM CLEARANCE FROM SUMP WALL.
<br />7. CONTACT CHEVRON ENGINEER REGARDING 15 GALLON SPILL BUCKET REQUIREMENTS.
<br />=1L
<br />IL
<br />m1
<br />IJ
<br />IH
<br />Ww
<br />F
<br />E
<br />D
<br />TANK, SECTION AND DETAILS
<br />12K GAL 8'+ "XERXES" DBL WALL
<br />9-2396 c
<br />25650 HWY 99 NO.,
<br />ACAMPO, CA.
<br />wo Chevron
<br />Northwest Region B
<br />®ROBERT H. LEE & ASSOCIATES, INC.
<br />ARCHRECTURE ENOINEERWO ENVIRONAAENfAL SERVICES
<br />1137 NORTH McDOWELL BDULEVARD PETALUMA CA. 94954 (707) 765-1650
<br />JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIVIL ENGINEER
<br />li REVIEW INIAL DATE DATE: 8/j8/-,3
<br />PRELIMINARY
<br />PLANNING DR. BY:
<br />STEEL BID
<br />BLDG PERMIT I APPR" vG
<br />q
<br />GENERAL BID RHL H 8344.10
<br />PERMIT REVS
<br />CONSTRUCTION SHEET
<br />Do not use drawing F-2
<br />for construction r
<br />unless initialed
<br />12 13 14 15 16 17 18
<br />
|