Laserfiche WebLink
1 2 3 4 1 5 6 7 6 9 10 11 12 43 14 15 16 17 18 <br /> PULL CABLES (AS SHOWN) TO <br /> FRP DOUBLEWALL--- FRP DOUBLEWALL---� _ f-TIGHTEN & HOLD W/ 3 CABLE CLAMPS, M <br /> M COMPOSITE TANK UNDERGROUND TANK UNDERGROUND TANK <br /> DESIGN CRITERIA <br /> ULLSAFETY FACTORS - 1.25 DURING EXCAVATION, 1.50 AFTER COMPLETION 5 CLIPS- TIGHT NABLES& HOLDSW/AS O3WCABLE CLAMPS. <br /> CONCRETE STRENGTH - Vc - 2.0 kSI REQUIRED <br /> REINFORCING STEEL - GRADE 40TIGHTEN <br /> TIGHTEN / TIGHTEN TIGHTEN <br /> WT. OF PEA GRAVEL BACKFILL : DRY - , 100 PCF / r <br /> SUBMERGED - 63 PCF TIGHTEN 3 CABLE CLAMPS <br /> TURNBUCKLE (TYP.) <br /> L WT. OF CONCRETE DRY = 150 PCF ' <br /> SUBMERGED 87.6 PCF PROVIDED <br /> GOWN STRAP -HOLD-DOWN STRAP L <br /> ^3 CABLE CLAMPS PROVIDED BY FRP TANK PROVIDED 8Y FRP TANK <br /> BUOYANCY = DISPLACEMENT X 62.4 P.C.F. 3 CABLE CLAMPS HOLO-DOWN STRAP (TYP') MANUFACTURER (TYP.) MANUFACTURER. <br /> (TYP') PROVIDED BY TANK <br /> BURIAL : 4'-0" MANUFACTURER. (TYP.) <br /> WATERTABLES : © 3'-0" BELOW TOP OF TANK SLAB `4''II <br /> © -AT BOTTOM OF TANK SLAB METAL CABLE V <br /> EYELET. <br /> O S'-0" t DIAMETER DOUBLEWALLED F.R.P. TANK �JJ 1/2" WIRE ROPE <br /> SINGLE OR MULTIPLE INSTALLATION, 10'-D^ L HOLD-DOWN LOG (TYPICAL) HOLD-DOWN HOLD-DOWN <br /> 6" 3 CLIPS REQUIRED LOG LOG <br /> K Oa WATERTABLE 0 3'-6" _ _ ® 3" O.C. (TYP.) K <br /> o <br /> NCHOR LOOP, <br /> PER LINEAL FOOT OF TANK " in ANCHOR LOOP SEE A % <br /> SEE DETAIL THIS <br /> BUOYANCY 50.26 X 62.4 = 3137 # <br /> DETAIL THIS SHEET. SHEET. <br /> WT, OF CONCRETE 10 X 75 = 750# <br /> I <br /> NIT. of TANK = 200 a <br /> VOLUME OF DRY BACKFILL STORAGE TANK HOLD-DOWN ASSEMBLY CABLE CLAMP DETAIL STORAGE TANK HOLD-DOWN ASSEMBLY ALTERNATE STORAGE TANK HOLD-DOWN ASSEMBLY <br /> -- - <br /> 10+9.06 X 3.0 = 28.60 CLEFT. - (FOR COMPOSITE TANKS ONLY) (FOR FRP TANKS ONLY) (USING PRECAST CONCRETE FOUNDATION PILES) <br /> 2 <br /> WT, OF DRY FILL 100 X 28.60 = 2860# 8'-0"0 <br /> J <br /> J <br /> VOLUME OF SUBMERGED BACKFILL - <br /> 9.07+8 50.26 <br /> 2 X 4.5 - 2 = 13:28 CU.FT. -- - <br /> WT. OF SUBMERGED BACKFILL 1 HOLD-DOWN ASSEMBLIES <br /> NO SCALE <br /> 63 X 13.28 = 830 <br /> EW = 4646# = 1.48 X BUOYANCY x 1.50 .', O.K. <br /> NO HOLD DOWNS REQ'0. 20'-5" OVERALL LENGTH SECONDARY TANK (10,000 GALLON) 31'-11 1/4" OVERALL LENGTH SECONDARY TANK (10,000 GALLON) 30'-9" OVERALL LENGTH SECONDARY TANK (10,000 GALLON) <br /> O WATERTABLE ® 5" - ml2nl2, <br /> (24'-5") (37'-5 1/4") <br /> TANK AND LOG (36 3") TANK AND LOG <br /> TANK AND LOG <br /> USE 12" X 12" R/C LOG <br /> H BETWEEN TANKS AND <br /> AT SIDES. H <br /> VOLUME OF BACKFILL <br /> 2 X 6.75 + 24.16 + 18.2 = 55.86 CU.FT,/FT, I -HOLD DOWN <br /> EW = 750 + 200 + 55.86 X 63 + (2 X 87.6) = 4645# STRAPS.(TYP,) <br /> SAFETY FACTOR 1.48 OK. - <br /> BALLASTING DURING EXCAVATED CONDITION TYP) <br /> PERMITTING FITTERS TO WORK SAFELY ON 70P OF , <br /> TANK: I <br /> (FOR SINGLE OR MULTIPLE TANKS.) <br /> Q WATERTABLE 2' MAX. IN EXCAVATION '5,879 5-5 1/8" 5'-5 1/8" 4'-10" <br /> 4'-10" _ <br /> VOLUME OF BACKFILL ABOVE T : .I _ (6'-9 7/8 ) I I I (C-9 7/8-) <br /> 50 26 - IF�B"_ �8"�f <br /> 4 X 8 - 2 - 6.87 CU.FT. <br /> WT. OF BACKFILL 6.87 X 95 = 653# 5'-11 1/8" W-4 1/2" 2'-:2" 2'-2" 8'-4 1/2 5'-n 1/8" 5' 4" 8' 3' 2'-31/2'2'-31/2" 8,-3" 5' 4" <br /> WATERTABLE 2'-2 i . 6' 4" I3'-2 1 " }'-21 "I 6'-4" I2'-21 2" (6'-9 7/e") (6'-tt 3/4") (4'-it")(4'-11") (6'-11 3/4") (6'-g') <br /> WT. OF TANK .200 - ANCHOR LOOP (TYP.) (5'-6 1/2') S'-6 1/2') HOLD DOWN LOG <br /> EW=853# ANCHOR LOOP (5'-2 1/2" 5'-2 1/2') HOLD DOWN LOG ANCHOR LOOP (TYP.) HOLD DOWN LOG <br /> 2'-0" (TYP.) <br /> WITH 2'-0" WATER IN EXCAVATION <br /> BUOYANCY 9.82 X 62,4 = 513# y 12" 2" <br /> A=X1LOG <br /> SAFETY FACTOR 1.39 OK. - WHERE REVD. 10'-8 1/2" "SHORT LOG" 10'-81/2" "SHORT LOG" 16'-5 5/8" (SHORT LOG 16'-5 5/8" (SHORT LOG) 15-10 1 2' SHORT LOG 15'-10 1 2" SHORT LOG <br /> 18-7 1. 2 ) 16-7 1 2 F <br /> F DESIGN OF BALLAST "LOGS" (12" X 12")' (11'-2 1/2") (IV-2 1/2") (19'-2 5/8") (19'-2 5/B") TOTAL LENGTH OF ONE "LONG LOG" 31'-9" OR COMB. OF TWO "SHORT LOGS" <br /> MAX. I = 32'-6" TOTAL LENGTH OF ONE "LONG LOG" 21'-5" OR COMB. OF TWO "SHORT LOGS" (TOTAL LENGTH OF ONE "LONG LOC' 32"-it 1/4" OR COMB- OF TWO "SHORT LOGS') (37'-3") <br /> W/ PICK UP ® END POINTSSI ' <br /> Mah i/2 X .15 X (5.75) 2.46 1'-6" MIN.1K ,� �. 21' MAX 5'-9* MAX. <br /> o,. ( ,X (25'-5") (38"-5 1/4") <br /> OWENS CORNING TANK <br /> As =• 2.48 = .15 2- #5 (TOP) - PLASTEELCOMPOSRE TANK XERXES TANK <br /> 1.76X9.5 <br /> Mmox = 5.61K As 6'6 =.39 2- #5 (BTM.) <br /> t.76X9.s NOTE- <br /> USE <br /> W PAFOITFIESES ARE FOR MOOD#2 TIES 16" O.C., #4 "LOOPS" ® PICK-UPS. - 1. PICK-UP POINTS FOR LOGS SHALL BE THE OUTER LOOPS. GALLON TANKS. <br /> JI 9'-5" DIAMETER PLASTEEL COMPOSITE TANK, VERFYLOCATMOFTANKHOLDDOWNS APS <br /> t'-s" 2. REFER TO SHEET F-7 FOR TANK HOLD-DOWN WITH MANWACTUFAM BEFORE FAMCATIOIN <br /> E SINGLE OR MULTIPLE INSTALLATION. 1 <br /> INSTALLATION SPECIFICATIONS, OF HOLD DOWN LOGS. E <br /> 10.32' g" - - <br /> Oo WATERTABLE ® 5'-0" <br /> % 11 <br /> PER LINEAL FOOT OF TANK 4 STORAGE TANK HOLD DOWN LOGS <br /> BUOYANCY (69.64-3.97) X 62.4 4098# a - SCALE: 1/4"=1'-0" <br /> rT <br /> WT. -0F CONCRETE 11.4 X 75 = 855 WT, OF TANK 670 #VOLUME OF DRY BACKFILL <br /> 11.42 + 10.32 X (4.5-3.97) = 44.95 CU.FT, - WT. = 44.95 X 100 = 4495# --CABLE CLAMPS 0 GUIDE <br /> 2 SEE DETAILS DW D VOLUME OF SUBMERGED BACKFILL - <br /> N �- _ HOLD DOWN I- <br /> 10.32 + 9.42 69.64+3.97 = 5.67 CU.FT. -- WT. = 5.67 X 63 = 357# / STRAP <br /> 2 X3.7 2 SVA <br /> EW = 6377# = 1.55 X BUOYANCY --- NO HOLD DOWNS. \ \\ MIN. STORAGE MIN <br /> 0 WATERTABLE 0 6" \ TANK I I MARK DATE REVI810N8 INBIiAL <br /> USE 12 X 12 R%C LOG BETWEEN \\ , 12" <br /> TANKS AND AT SIDES 7 625 A ' <br /> VOLUME OF BACKFILL `\ TANK HOLD- DOWN <br /> a 2 X 7.625 + 27.79 + 22.84 = 55.88 CU FT. # \ 12" I 12" <br /> EW = 855 + 670 + 65.88 X 53 + 87,6 = 5763 I I- LOG INSTL AND CAL.CS <br /> SAFETY FACTOR 1.33 OK. 1 I #4 ANCHOR & PICK-UP - 2" RAO. <br /> C BALLASTING DURING EXCAVATED CONDITION �_ r }�/RI G T -SEE(TYPICAL) <br /> DETAIL AT <br /> {- - T RIGHT (TYPICAL) 8" 9-2396 C <br /> #4 25650 HWY 99 NO., <br /> 0 BACKFILL ON TOP OF TANK 9.55 SQ.FT.--907 # <br /> - <br /> WT. OF TANK 670 # f W = 1567# pz TIES ®/ <br /> I a ACAMPO, CA <br /> WITH 3 -0" OF WATER IN EXCAVATION 12' <br /> -PICK-UP <br /> p NiiLP / I' 1 78" O.C. - I" RAD. <br /> BUOYANCY 19.1 X 62.4 1192# / / I� /- <br /> °' SAFETY FACTOR" 1.31 OK. /-2' RAD. I' 5-#5 (TYP,) Chevron <br /> 1"JCR. TYP. L4�a IRAD, 21' MAX.. 1'-9" MAX �� Northwest Region3-q5 - t'--6" VIN <br /> B z- s F � LOG SECTKNJ ANCHOR LOOP DETAIL i2 TIES (TYP) 6 <br /> - - <br /> - QQ �4T <br /> la - - ANCHOR LOOP I O t2" BED IVa III ® ROBERT H. LEE & ASSOCIATES, INC. <br /> (12-SQ. X 32'-6") (fir" U ARCHffECTURE ENQMIEERYJCA ENVIROMA�NTAL BEAVICEB <br /> TIE DOWN STRAP ANCHORAGE AND PICK-UP POINTS NQTE: - _ _ - - -� 1137 NORTH McDOWEUL BOULEVARD PETALUMA CA, 94954 (707) 765-1660 <br /> .PICK-UP POINTS SHALL BE AT THE OUTER _ <br /> _ _ JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CML ENGNEER <br /> ANCHOR LOOIPS. <br /> USE HOOKED #4 BARS .REFER TO TAINK DWG'S FOR LOCATION OF ANCHOR I I - I I-I I -III=III- PJ-4- REVIEW INRiAL DATE DATE: <br /> c� 32.5N STRAP FASTENING HOOKS. WHICH SHALL BE HOT- -I I 1=1 _I 12" X 12" HOLO DOWN LOG FOR USE 0 SINGLE PRELIMINARY <br /> a MAX. LOAD -X 150 = 2438# <br /> DIP GALVAN127ED. AND MULTIPLE TANK INSTALLATIONS OR AS INDICATED. DR. BY: <br /> 2438 t •TOTAL BALLAST LOG LENGTH SHALL EQUAL PLANNING <br /> UJ Fs = 4D = 6095 PSI TANK LENGTH. (USE SECTIONS AS REQ'D.) STEEL BID <br /> Z _ BLDG PERMIT 31 APPR.: SG <br /> A <br /> A GENERAL BID RHL Y 8344.10 <br /> O <br /> '. PERMIT REVS <br /> Z SHE <br /> 3 2 HOLD-DOWN LOG LOCATIONS 3 HOLD-DOWN LOG REINFORCEMENT DETAILS CONSTRUCTION ° �9 F-9 <br /> SCALE: 1/2"=1'-0" SCALE 1"=1'-0' for ss ,to lL°n <br /> Q <br /> ynlefa Inip°letl <br /> 0: <br /> D <br /> . 1 2 3 4 5 6 7 10 11 12 13 14 15 <br />