My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:05:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 1997-2007.PDF
QuestysFileName
COMPLIANCE INFO 1997-2007
QuestysRecordDate
6/21/2017 4:01:59 PM
QuestysRecordID
3452124
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apr 15 04 08: 20a VaPacific Petroleum 2093 1619 p. 10 <br /> Message Page 3 of 4 <br /> I.The Tripped or Bottom 2. Leak Sensing Position 3. Non-Leak or Full Flow <br /> Position g Position <br /> 't <br /> When the system is less than In this position the system This position allows full flow. <br /> 1 psi, the piston and poppet pressure has increased to The poppet will remain in <br /> are in the"bottom"or"tripped" approximately 12 psi and all the approximately this position as <br /> position. In this position of the flow must travel around the long as the system pressure <br /> poppet, product flows through metering pin which limits it to remains at about the pumping <br /> the horizontal hole in the approximately a 3 GPH rate(at pressure. If the pressure in the <br /> poppet and around the 10psi). If there is a leak in the system drops when the pump <br /> metering pin at a rate of system which will allow leakage is turned off, either due to <br /> approximately 2 GPM flow into to exceed this amount, the line thermal contraction of the <br /> the delivery line when the pressure will not build beyond product or due to a leak,the <br /> submersible pump is running. this point and the valve will piston moves downward and <br /> In normal operations the piping remain in the leak sensing the poppet engages and seals <br /> remains full of fluid and when position with the main flow inside the cage at about 3 psi, <br /> the submersible pump is blocked. If there is an attempt or approximately 10 feet of <br /> turned on, with a flow rate of 2 to dispense while the valve is in head, in gasoline.Any time the <br /> GPM through the poppet, this position, the line pressure pump is turned on after the <br /> pressure builds rapidly and the will drop to less than 1 psi, the seal on the poppet is inside <br /> poppet moves to the leak piston will respond,and the the cage, a line test will be <br /> sensing position. poppet will return to Position 1 performed. <br /> where 2 GPM will flow to the <br /> dispensers. Leaks smaller than <br /> 3 GPH will be indicated by the <br /> STP-MLD taking longer than <br /> three seconds to open <br /> completely because some of <br /> the flow leaks out of the system <br /> and the rest builds pressure. If <br /> there is no leakage in the <br /> system,the small flow around <br /> the metering pin increases the <br /> line pressure and in <br /> approximately three seconds <br /> the piston will move the poppet <br /> to Position 3. <br /> MLDB001 <br /> Rev.07/99 <br /> "Left click"to VIEW pdf. _ To SAVE pdf"Right Click"&choose <br /> Corporate Submersible EMPD-Fractional HP Motors Fueling Systems international TOP <br /> 4/13/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.