My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:05:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 1997-2007.PDF
QuestysFileName
COMPLIANCE INFO 1997-2007
QuestysRecordDate
6/21/2017 4:01:59 PM
QuestysRecordID
3452124
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTIDEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Q. Donna IC Heran,RE.H.S. <br /> Director <br /> V. 304 East Weber Avenue, Third FloorCarl Bergman,R.E.H.S. <br /> �. ,�; � <br /> Al Olsen,R.E.H.S. Huggins,R.E.H.S.,R.D.I. <br /> E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • Cq.. ,NSP • Program Manager Telephone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> F o a Laurie A.Cotulla,RE.H.S. <br /> Program Manager Fax: (209)464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> May 29,2003 <br /> Johnson Petroleum Construction <br /> PO Box 7169 <br /> Auburn CA 95604 <br /> Re: Valley Pacific Petroleum 3550 S HWY 99 Stockton CA 95206 <br /> The permit application to repair leaks in the secondary piping for the above referenced <br /> facility has been approved with the following conditions: <br /> 1. Per the current scope of work new parts will not be installed. If additional repairs <br /> are needed an updated scope of work must be submitted to the Environmental <br /> Health Department(EHD) for review and approval prior to commencing work. <br /> 2. All metal exposed to backfill must have corrosion protection. <br /> 3. Soil sampling may be necessary per Environmental Health assessment. <br /> 4. A certified technician must perform a line integrity test on the primary piping of <br /> all exposed lines. This office must receive results within 7 days of project <br /> completion. <br /> 5. If concrete is broken near the underground storage tank a tank integrity test must <br /> be performed by a certified tank tester within 7 days of project completion. <br /> 6. A health and safety plan must be at the work site. <br /> 7. Contact EHD for the following inspections: <br /> a. Initial piping exposure <br /> b. 30-minute pressure test on all repaired/replaced piping prior to backfill. <br /> 8. Give 48-hour notice for all inspection appointments. <br /> 9. Note: This permit expires July 30,2003. <br /> If you have any questions,please call Dina Abate, at (209) 468-3468. <br /> Thank you, <br /> Dina Abate, EHS <br /> Environmental Health Specialist <br /> Cc: Mike Eliason <br />
The URL can be used to link to this page
Your browser does not support the video tag.