Laserfiche WebLink
Z3�pN p�rRo <br /> o ��y <br /> `^1 7 <br /> V 2� <br /> Contractors License 0692238 Post Office Box 7169 <br /> (530)878.6834 • Pax(530)878.6438 KUCTIO� Auburn,California 95604 <br /> May 15, 2003 <br /> To: Mike Eliason <br /> Valley Pacific Petroleum Services <br /> 166 Prank West Circle <br /> Stockton, CA. <br /> From: Scott Johnson. <br /> Re: Scope of work for repairs to containment piping at Rapid Wash CFN ('ardlock <br /> in Stockton, CA. <br /> 1. Sawcut and remove concrete along gasoline island, 3' wide x 15' Ions, adjacent to <br /> dispenser island and over top of buried piping.. <br /> 2. Excavate to expose product piping at connection to bottom of Bravo Bot <br /> dispenser containment sump. <br /> 3. Remove and replace or repair leaking connection as required to pass pre;:ure tost� <br /> 4. Coordinate inspections with San Joaquin County Environmental Health. <br /> S. Backfill using excavated pea gravel. Place and finish concrete to match e\istint <br /> elevation and thickness. <br /> Estimated time of 3 to 5 days to complete project depending on required leslint and <br /> inspections. <br /> Estimated cost to complete project. S 6,500.00 <br /> JPC will bill on a time and material basis for above scope of work. <br /> Please call me if you have any questions. <br /> T tyou. <br /> r_ wi+ate <br /> Scott Johnson. <br />