My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:05:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 1997-2007.PDF
QuestysFileName
COMPLIANCE INFO 1997-2007
QuestysRecordDate
6/21/2017 4:01:59 PM
QuestysRecordID
3452124
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z3�pN p�rRo <br /> o ��y <br /> `^1 7 <br /> V 2� <br /> Contractors License 0692238 Post Office Box 7169 <br /> (530)878.6834 • Pax(530)878.6438 KUCTIO� Auburn,California 95604 <br /> May 15, 2003 <br /> To: Mike Eliason <br /> Valley Pacific Petroleum Services <br /> 166 Prank West Circle <br /> Stockton, CA. <br /> From: Scott Johnson. <br /> Re: Scope of work for repairs to containment piping at Rapid Wash CFN ('ardlock <br /> in Stockton, CA. <br /> 1. Sawcut and remove concrete along gasoline island, 3' wide x 15' Ions, adjacent to <br /> dispenser island and over top of buried piping.. <br /> 2. Excavate to expose product piping at connection to bottom of Bravo Bot <br /> dispenser containment sump. <br /> 3. Remove and replace or repair leaking connection as required to pass pre;:ure tost� <br /> 4. Coordinate inspections with San Joaquin County Environmental Health. <br /> S. Backfill using excavated pea gravel. Place and finish concrete to match e\istint <br /> elevation and thickness. <br /> Estimated time of 3 to 5 days to complete project depending on required leslint and <br /> inspections. <br /> Estimated cost to complete project. S 6,500.00 <br /> JPC will bill on a time and material basis for above scope of work. <br /> Please call me if you have any questions. <br /> T tyou. <br /> r_ wi+ate <br /> Scott Johnson. <br />
The URL can be used to link to this page
Your browser does not support the video tag.