Laserfiche WebLink
SWRCB,January 2002 Page 8 of 8 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes U <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested U <br /> Test Method Developed By: U Spill Bucket Manufacturer M Industry Standard U Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: U Pressure U Vacuum LXHydrostatic <br /> U Other(Spec) <br /> Test Equipment Used: Visual EquipmenlResolution: <br /> ecr Spill Box# 1 ill Box# 2 Spill Box# Spill Box# <br /> Bucket Diameter: 1211 1211 <br /> Bucket Depth: 1211 n <br /> Wait time between applying <br /> pressure/vacuum/waterand N/A N/A <br /> starting test: <br /> Test Start Time: <br /> 9-10 <br /> Initial Reading(R,): 0• 0 <br /> Test End Time: 9.01 9 :11 <br /> Final Reading(Rr): _•" —211 <br /> Test Duration: <br /> Change in Reading(R, R,): 2" 2" <br /> Pass/Fail Threshold or <br /> Criteria: 2"-1 minute 2"-1 minute <br /> Test Result: U Pass p(Fail U Pass tXFoil U Pass U Fail U Pass U Fall <br /> Comments— (include information on repairs made phor to testing, and recommended follow-up forfailed tests) <br /> Both mill tnhg ara hrokan <br /> EMCO Wheaton Plastic Tubs <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Atm:Scott Bacon <br /> 1001 "1"Street,Box 944212 <br /> Sacramento,CA 95814 <br /> Phone:(916)341-5873,Fax:(916)341-5808 <br /> e-mail:bacons@,cwp.swreb.ca.gov <br />