Laserfiche WebLink
/RCB,January 2002 • Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer gIndustry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum �Aydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: r Equipment Resolution: , v� " <br /> sump# 2 /J Sump# J , Sy Sump# Sump# <br /> Sump Diameter: qZ t Z o <br /> Sump Depth: t i <br /> Sump Material: — 1 <br /> Height from Tank Top to Top of N Z u 11 <br /> Highest Piping Penetration: / <br /> Height from Tank Top to Lowest y U t/ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: v <br /> Portion of Sump Tested' Mm 3fJ bo 0 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes 0 No DNA P'es 0 No DNA 0 Yes ONO DNA 0 Yes 0 No 0 NA <br /> product and water)?* <br /> Turbine shutdown response time S C l <br /> Is system programmed for fail-safe <br /> shutdown? W'Yes 0 No 0 NA Xes 0 No DNA 0 Yes 0 No DNA 0 Yes 0 No DNA <br /> Was fail-safe verified to be yes 0 No 0 NA es 0 No DNA 0 Yes 0 No DNA 0 Yes 0 No 0 NA <br /> operational?* <br /> �` <br /> Wait time between applying <br /> pressure/vacuum/water and starting )�ih �SGtiI i) <br /> test: <br /> Test Start Time: 2'x 2.4q T. e`l <br /> Initial Reading(Rj): lo.6jf Li,6 // 6 L D.656 <br /> Test End Time: 2 f 2:f j:0"( <br /> Final Reading(RF): qq q.6 uY 656, 64-�L <br /> Test Duration: <br /> Change in Reading(RF-Ri): $ Q 8— <br /> Pass/Fail Threshold or Criteria: a v L ^. oo 2- <br /> Test <br /> Test Result: ass ❑Fail fiCPass 0 Fail 0 Pass 0 Fail ❑ Pass 0 Fail <br /> Was sensor removed for testing? Yes 0 No 0 NA Yes 0 No ❑NA 0 Yes 0 No C NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and E]yes 0 No DNA Yes 0 No 0 NA 1OYes 0 No DNA 0 Yes 0 No 0 NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-u or failed tests) <br /> ton 1p ja i t t tyt 1 <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />