My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
BILLING_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:43 PM
Creation date
11/5/2018 8:07:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2008-2015
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3550\PR0505827\BILLING 2008-2015.PDF
QuestysFileName
BILLING 2008-2015
QuestysRecordDate
6/21/2017 5:25:18 PM
QuestysRecordID
3453164
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Rae I of 2) <br /> 49 1 <br /> TYPE OF ACTION ❑L NEW PLAN ® 2.CHANGE OF INFORMATION <br /> PLAN'TYPE ® I.MONITORING iS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check msz item unly) ❑ 2.PHIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(RI <br /> I; FACILITY INFORMATION _ <br /> FACILITY ID#(xgeney Use Onlvl - - I <br /> BUSINESS NAME(Same m FACILITY NA ME) Valley Pacific Petroleum Cardlock _ <br /> BUSINESS SITE ADDRESS CITY ,u4 <br /> , 3550 S.Hwy 99 1n, � Stockton <br /> - IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE f <br /> Testing,preventive maintenance.and calibration of momtonng zquipmznt leg,sensors,probes,line leak detectors,etc)must be performed at the frequency <br /> specified by the equipment manufacturers' instnmtiuns.or annually,whichever is more frequent,and that such work must be performed by qualified personnel <br /> 23 CCR§2632.2634,2638638_2641L__.... <br /> -__�__.____-_____. <br /> MONITORING EQUIPMENT IS SERVICED ® I ANNUALLY ❑ 99 OTHER(Spzcity). a9o_3bJ <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBVIITTED WITH THIS PLAN. DO 2.SITE PLOT PLAN/MAP PREVIOUSLYSURMITTED. (23 CCR§2632,-1 <br /> 2634)aw-4 ----� <br /> IV.TANK MONITORING IS PERFOILMED USING THE FOLLOWING METHOD(S):_ _ <br /> L CONTINUOUS ELECTRONIC TANK MONITORING OF'ANNE'LAR(INT ERSIII'IAI,)SP 10E(S)OR bECONDAHY CON"1'AINAIEN <br /> VAULT(S)WITH.AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ®I a.DRY [Ib_LIQUID FILLED ❑ c.PRESSURIZED E)d.UNDER VACUUM <br /> PANEL MANUFACTURER�CeedeLRO.QL __--.__-- 4w-t I MOD_E_LM _TLS,,35O_-- a9o-s <br /> LEAK SENSOR MANUFACTURER'. Veeder Root 490.9. i MODGL#(S): 20 4vo-I9 <br /> +.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE;WALE TANK(S).(23 CCR§2643) 490.11 <br /> PANEL M_A_NUFACTURER: . _ a tx' MODEL#: _ 4s 13 <br /> IN-TANK PROBE MANUFACTURER: _ _a90-ta MODEL#(S): 4so.ts <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS --_0 b.DAILY/NIGHTLY ❑ c.WEEKLY +9o-le <br /> 49047 <br /> _______ ❑ d.MONTHLY OTHER(Spee_fY�______.-_ <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ Is,0.2 g.p h. ❑ c OTHER(Specify), 49o-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490sn <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTMGPERIOD' ❑ a.36 HOURS ❑ b:60 HOURS 4°041 <br /> vbx <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643x): <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490.25 <br /> 0.W-26 <br /> ❑99.OTH ER lSpecifyY. __ __ __ a90.n <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> -ICONTINUOUS MONITORING OF PIPET PIPING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND J°0'es <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:- .DRY ❑h.LIQUID FILLED ❑c.PRESSURIZED- ❑d.UNDER VACUUM <br /> 0.v°-xv <br /> 490.11 <br /> MODEL#: T C-350 _ <br /> PANEL MANUFACTURER: V er I _ s9a2c - .s- --. <br /> a9o-n MODEL#S): 208 4mas <br /> ___LEAK SENSOR MANUFACTURER. Veeder Root _ S -- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. Na.YES ❑b.NO 490'4 <br /> FAILl1RE/DISCONNECTION.OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 01 a.YES ❑b.NO 190.35 <br /> 2..MECHANICAL LINE LEAK DETECTOR(MLL J)THAT ROUTINELY PERFORMS 3.0 g.p:K LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> _ PRODUCT FLOW WHEN.A LEAK IS DETECTED(23 CCR,§26362____,______-_____.___.._._.-__ - 'vn.3o <br /> { MLLD MANUFACTURER(S): FE Petrol 1=ft1W - ° 59 MODEL H(St TP-MLO <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 gp.6.LEAK TESTS(23CCR§2636) 49659 <br /> ---- __I 49ws <br /> i __ ELLD MNU <br /> APACTURER(S) 3MODEL___- <br /> PROGRAMMED IN LINE LEAK TEST'. ❑ I.MINIMUM MONTHLY 0.2 g.p K. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49WI <br /> GELD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PIJMP SHUTDOWN. ❑a YES [I b.NO 4%43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN- ❑a.YES ❑b.NO °90.41 <br /> 4.PIPE INTEGRITY-1-WING ae<s <br /> TEST FRC UENCY ❑ aANNUALLY ❑ b.EVERY3 YEARS ❑ c.OTHERS i "969e 19"-r� <br /> S.VISMAVE MONITORING. <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' i90A' <br /> 'AIbxN tarmoni�ou of wbwied enae me uNor luel 'i 9n1 rHSC 5291.56 ) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(aN3)I, 49x59 <br /> 7.N0 REGULATED PIPING PER f1EALTH ANU SAFETY CODE,DIVISION20,CHAPTER 6.715 CONNECTED TO THE TANK SXSTEM <br /> 491451 490.12 <br /> 99.OTHER(Specify) 490.53 <br /> UPCF US'r-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.