Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 (One farm per facility) <br /> • TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FAC[LIIY lll r: (dgenc3,Use Onf}) <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> Valley Pacific Petroleum-Haw 99 Cardlock Roe. <br /> BUSINESS SITE ADDRESS R03. CITY <br /> 3550 S Highway 99 1104. <br /> Stockton <br /> 1I. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases fronm UST systems and supplements the emergency response plans and procedures in the facility's hazardous Materials <br /> Business Plan. <br /> > If safe to do so,facility personnel will take inuucdiate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR 366262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> Facility personnel will determine whether any water removed train secondary eontainment systems, or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-Imazardoas. If the water has a petroleum sheen(isc.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,em.will not be disposed to storm water systenms. <br /> 7 We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment: <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> n. Hazardous material•other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutmlize <br /> released product/wage,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND;CLEAN-UP EQUIPMENT <br /> • PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in rine facility's Hazm�dous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERNIANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: (C'am tete only if a licable) <br /> EQUIPNIENT LOCATION AVAILABILITY <br /> Absorbent RIO. R20. . <br /> 166 Frank West Circle,Stockton 24/7 Rto <br /> Brooms,Shovels,Cohered Drums R" 166 Frank West Circle,Stockton tut 24/7 R31. <br /> RI^. R 2. <br /> R13. U3. R33. <br /> R14. R <br /> A3a. <br /> R15. Rbs. <br /> R35, <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOR'ING PERSON(S)IS/ARE RESPONSIBLE FOR AU'T'HORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NANIE Rao. TITLE Mo. <br /> Mike Eliason Cardlock Manager <br /> NAME R41. TITLE R31 <br /> Rim Vance . OpErations Manager <br /> NAME Nathan Crum R42. TITLE Risk Manager R12 <br /> NAME R43. TITLE R53 <br /> Dan Elmer President Commercial Operations <br /> ra V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> N Additional system testing or data collection LXInspection by qualified persons XRecalibration of equipment <br /> Other: <br /> • A60. <br /> UST Response Plan(3/2008)-1/3 <br />