FROM (WED)AUG 30 2006 17 9/ST. 17:33/No. 6843597301 P 6
<br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT
<br /> UNDERGROUND STORAGE TANK
<br /> MONITORING PLAN— PAGE 1
<br /> TYPEOP AMON ❑ 1.NEW PLAN ❑ 2.CI IANGE OF INFORMATION
<br /> PLAN TYPE JN MONITORING IS IDENTICAL FOR ALI,USTs AT THIS FACILITY. M
<br /> (Checkent.c Ian only) ❑ THIS PLAN COVERS ONLY'rHF FOLLOWING UST SYSTEM(;
<br /> FACILITY':INEORMATIONc'
<br /> r•ACIUT•Y 10 (Age U.5;11y)
<br /> I 14`i��l'1
<br /> FACILITY NAME R a p i d w a h C a r d l o c k Moa.
<br /> FACILITIJ SrE ADDRPSS 3550 S.Highway 99 MM. CITY Stockton M117•
<br /> ;., n, 1T: EQ UIPIVIEN 1G,� 1G AJ!T11)'RL'Sr E1J�?F; ' ' ,* ANGEi: . i. r y ^"
<br /> State lawaey..es Inut testing,preventive maintenance,and cWibndion of monitoring equipment(a.g.,aenso ,probes,line leak deleerora,ata)be performed in Mos.
<br /> aixmrdsnec' vlll the equipment mmut'aduren'instruulinns,m annually,whichever is more fmgmnl. Such work m#Ir
<br /> ae performed by qualified pcnonnal.
<br /> MON1TO;RING EQUIPMENT IS SERVICED it I,ANNUALLY 0'99.OTHER(Specify): e10i
<br /> i III MOl�tlz J
<br /> : QRI� i�D.CAat�O51S
<br /> This muni;torvg plan must include a Site Plan showing the general rank and piping layouts and rhe locations where monitoring is performed(i.e.,luNdion ofcach seavor,
<br /> line leak dtetedor,monitoring system control panel,cle.). If you alroady have a diagram(e.g.,current UST Mmituring Site Plat ftm a Monitoring Syotan Cenifcaunn
<br /> fort Hi.ui. s Materials Busineaa Plan m etc, which shows all required information include it with this plan.
<br /> ./,.y�' ': .ti'IC'v n`fi""a i"?,,Z;;,+ fi.(:� /:1l t v � ! rtl .4 da(•lYy.t i,1�f'r.Kv Y]a^v..5, .�S'W'.. 9,
<br /> vTN � ,A•]� 0 "O�'1r7:�?I.'' d�,!» v �x,e. k• `:uz��}^.'-1�
<br /> MONITOVJIG IS PIiRFORMEI)USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo.
<br /> 1.CO7147AlUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SFCONOARY CONTAINMENT VAUL'I'(S)
<br /> SECONDARY CONTAINMDT7r IS: 19 a DRY ❑ b.LIQUID FILLED ❑ e UNDER PRESSURE ❑ d.UNDER VACUUM MO'
<br /> PANEL MANUFACTURER: Imran M1S. MODKLN: 1600 MIs.
<br /> I.PAKSENSOR MANUFACTURER: Incon MM" MODEL M(3): ApLO 1•.. LS-7 MH.
<br /> ❑ 2.AU70KATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SMO EWA_t .T NK(S)
<br /> '-PANEL MANUFACTURER: Mle. MODEL N: Mn,
<br /> ._ IN•YANKPROHE MANUFACTIII(L•R: MIS.-.'MODEL N(S): Mro.
<br /> LFA K TESTFREQUENCY: 0 aCONI'INUOUS ❑ b.DAILY(NIOHTLY ❑ WF",F;KLY mm,
<br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 0,012 1•
<br /> Ll TESTS: A.0.1 g,p,h. [3 IS,02 g.p.h. ❑ cQ1'HEt?(S,paity); Mix, M23.
<br /> ❑ 3.INVENTORY RECONcruATiON ❑ &MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Ms+.
<br /> ❑ 4,WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645
<br /> TESTING PERIOD: ❑ A 36140URS ❑ b.60 HOURS MR5•
<br /> ❑ 5.lisn EGUTY TESTING PER 23 CCR 12643.1
<br /> TErf FREQUENCY: ❑ aANNUALLY ❑ b.,BIENNIALLY ❑ c.OTIE3R(Specify): M74 MD.
<br /> ❑ 6.VISLIAI,MONrrORING DONE: ❑ a.DAILY ❑ b,WEEKLY(Pey •aakvapp�)
<br /> ❑ 99,OTHPR(Speetfy)'
<br /> y'.' :y3 P�4• i•. <'yfM1YY yg+Xi"
<br /> MQl ��I„�
<br /> amw rN C ' :� v
<br /> MOMTORINO IS PERFORMED USING THE FOLLOWING MET14OD(S)(Check all.that apply) Mao.
<br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyrRENCH(ES)AND OTHER SECONDARY CONTAINMENT
<br /> SECONDARY CONTAINMENT IS: ff a DRY ❑ b,LIQUID FILLED ❑ C.UNDER PRESSURE ❑ d•UNDER VACUUM Msi.
<br /> PANEL MANUFACTURER: Incon MM. MODELS: 1000. M)e.
<br /> LEAK SENSOR MANUFACTURER; ''Triton Mse. MODEL 9(S): 83ae•t LS-7 Mn.
<br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i,e.,TUR0fNE)SHUTDOWN? Iff a.YES ❑ b.NO MTs.
<br /> WAL FAILURE7DISCONNECI•ION,OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 19 a.YES ❑ b.NO MJ7'
<br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g,p,h, LEAK TESTS AND RESTRICTS OR SHUTS Orr,
<br /> PRODUCT'FLOW WHEN A LEAK ISDE=- M
<br /> MILD MANUPACTURER(s): F'E.Petra , P--j 3ccLef Mrs' MODEL A(S); STP-MLD , py, Mv.
<br /> ❑ 3.F,LECIROMC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0x•P.h,LEAK TESTS
<br /> ELU)MANUFACI'URER; Mea' MODEL#: MeI.
<br /> PROGRAMMFD LINE INTEGRITY TESTS: ❑ L MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0,1 g,p,h. Mea
<br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN7 ❑ &YES ❑ b.NO M)
<br /> WILL ELLD FAILURE/OISCONNHCTION TRIGGER AUTOMATIC PUMP SHU TOOWN7 ❑ s.YFS [3 b.NO MM.
<br /> ❑ CINTEOPITYTNSTING
<br /> TEST FREQUENCY: ❑ a ANNUALLY Q Is.EVERY 3 YEARS ❑ c.OTHER(Specify) Mos. Mot.
<br /> ❑ 5.VISUALMONITORING DONE: ❑ a DAILY ❑ b.WEEKLY- .❑ u MTN.MONTIIbY&EACH TIMk SYSTEM OPERATED-- Ma.
<br /> •ae AM raLM)”RPOMlt ••Mowadrb n,aoiraingdndnirka�^•ra.^H arMreorad dpins only prtlSC t252al.sroKr)
<br /> ❑ 6.PIMNG IS SUCTION PIPING MEETING ALLREQUIREMENTS FOR EXFMPf10N'FROM MONITORING PER 23 CCR§2636(a)(3)
<br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING 19(.'ONNECI-Fl)T)THE UST(s)
<br /> ❑ 99.OTEER(Spcci y) M49.
<br /> SiCEHDd(01/(13).-114 07!23103
<br />
|