Laserfiche WebLink
FROM (WED)AUG 30 2006 17 9/ST. 17:33/No. 6843597301 P 6 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— PAGE 1 <br /> TYPEOP AMON ❑ 1.NEW PLAN ❑ 2.CI IANGE OF INFORMATION <br /> PLAN TYPE JN MONITORING IS IDENTICAL FOR ALI,USTs AT THIS FACILITY. M <br /> (Checkent.c Ian only) ❑ THIS PLAN COVERS ONLY'rHF FOLLOWING UST SYSTEM(; <br /> FACILITY':INEORMATIONc' <br /> r•ACIUT•Y 10 (Age U.5;11y) <br /> I 14`i��l'1 <br /> FACILITY NAME R a p i d w a h C a r d l o c k Moa. <br /> FACILITIJ SrE ADDRPSS 3550 S.Highway 99 MM. CITY Stockton M117• <br /> ;., n, 1T: EQ UIPIVIEN 1G,� 1G AJ!T11)'RL'Sr E1J�?F; ' ' ,* ANGEi: . i. r y ^" <br /> State lawaey..es Inut testing,preventive maintenance,and cWibndion of monitoring equipment(a.g.,aenso ,probes,line leak deleerora,ata)be performed in Mos. <br /> aixmrdsnec' vlll the equipment mmut'aduren'instruulinns,m annually,whichever is more fmgmnl. Such work m#Ir <br /> ae performed by qualified pcnonnal. <br /> MON1TO;RING EQUIPMENT IS SERVICED it I,ANNUALLY 0'99.OTHER(Specify): e10i <br /> i III MOl�tlz J <br /> : QRI� i�D.CAat�O51S <br /> This muni;torvg plan must include a Site Plan showing the general rank and piping layouts and rhe locations where monitoring is performed(i.e.,luNdion ofcach seavor, <br /> line leak dtetedor,monitoring system control panel,cle.). If you alroady have a diagram(e.g.,current UST Mmituring Site Plat ftm a Monitoring Syotan Cenifcaunn <br /> fort Hi.ui. s Materials Busineaa Plan m etc, which shows all required information include it with this plan. <br /> ./,.y�' ': .ti'IC'v n`fi""a i"?,,Z;;,+ fi.(:� /:1l t v � ! rtl .4 da(•lYy.t i,1�f'r.Kv Y]a^v..5, .�S'W'.. 9, <br /> vTN � ,A•]� 0 "O�'1r7:�?I.'' d�,!» v �x,e. k• `:uz��}^.'-1� <br /> MONITOVJIG IS PIiRFORMEI)USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> 1.CO7147AlUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SFCONOARY CONTAINMENT VAUL'I'(S) <br /> SECONDARY CONTAINMDT7r IS: 19 a DRY ❑ b.LIQUID FILLED ❑ e UNDER PRESSURE ❑ d.UNDER VACUUM MO' <br /> PANEL MANUFACTURER: Imran M1S. MODKLN: 1600 MIs. <br /> I.PAKSENSOR MANUFACTURER: Incon MM" MODEL M(3): ApLO 1•.. LS-7 MH. <br /> ❑ 2.AU70KATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SMO EWA_t .T NK(S) <br /> '-PANEL MANUFACTURER: Mle. MODEL N: Mn, <br /> ._ IN•YANKPROHE MANUFACTIII(L•R: MIS.-.'MODEL N(S): Mro. <br /> LFA K TESTFREQUENCY: 0 aCONI'INUOUS ❑ b.DAILY(NIOHTLY ❑ WF",F;KLY mm, <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 0,012 1• <br /> Ll TESTS: A.0.1 g,p,h. [3 IS,02 g.p.h. ❑ cQ1'HEt?(S,paity); Mix, M23. <br /> ❑ 3.INVENTORY RECONcruATiON ❑ &MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Ms+. <br /> ❑ 4,WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ A 36140URS ❑ b.60 HOURS MR5• <br /> ❑ 5.lisn EGUTY TESTING PER 23 CCR 12643.1 <br /> TErf FREQUENCY: ❑ aANNUALLY ❑ b.,BIENNIALLY ❑ c.OTIE3R(Specify): M74 MD. <br /> ❑ 6.VISLIAI,MONrrORING DONE: ❑ a.DAILY ❑ b,WEEKLY(Pey •aakvapp�) <br /> ❑ 99,OTHPR(Speetfy)' <br /> y'.' :y3 P�4• i•. <'yfM1YY yg+Xi" <br /> MQl ��I„� <br /> amw rN C ' :� v <br /> MOMTORINO IS PERFORMED USING THE FOLLOWING MET14OD(S)(Check all.that apply) Mao. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyrRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ff a DRY ❑ b,LIQUID FILLED ❑ C.UNDER PRESSURE ❑ d•UNDER VACUUM Msi. <br /> PANEL MANUFACTURER: Incon MM. MODELS: 1000. M)e. <br /> LEAK SENSOR MANUFACTURER; ''Triton Mse. MODEL 9(S): 83ae•t LS-7 Mn. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i,e.,TUR0fNE)SHUTDOWN? Iff a.YES ❑ b.NO MTs. <br /> WAL FAILURE7DISCONNECI•ION,OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 19 a.YES ❑ b.NO MJ7' <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g,p,h, LEAK TESTS AND RESTRICTS OR SHUTS Orr, <br /> PRODUCT'FLOW WHEN A LEAK ISDE=- M <br /> MILD MANUPACTURER(s): F'E.Petra , P--j 3ccLef Mrs' MODEL A(S); STP-MLD , py, Mv. <br /> ❑ 3.F,LECIROMC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0x•P.h,LEAK TESTS <br /> ELU)MANUFACI'URER; Mea' MODEL#: MeI. <br /> PROGRAMMFD LINE INTEGRITY TESTS: ❑ L MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0,1 g,p,h. Mea <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN7 ❑ &YES ❑ b.NO M) <br /> WILL ELLD FAILURE/OISCONNHCTION TRIGGER AUTOMATIC PUMP SHU TOOWN7 ❑ s.YFS [3 b.NO MM. <br /> ❑ CINTEOPITYTNSTING <br /> TEST FREQUENCY: ❑ a ANNUALLY Q Is.EVERY 3 YEARS ❑ c.OTHER(Specify) Mos. Mot. <br /> ❑ 5.VISUALMONITORING DONE: ❑ a DAILY ❑ b.WEEKLY- .❑ u MTN.MONTIIbY&EACH TIMk SYSTEM OPERATED-- Ma. <br /> •ae AM raLM)”RPOMlt ••Mowadrb n,aoiraingdndnirka�^•ra.^H arMreorad dpins only prtlSC t252al.sroKr) <br /> ❑ 6.PIMNG IS SUCTION PIPING MEETING ALLREQUIREMENTS FOR EXFMPf10N'FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING 19(.'ONNECI-Fl)T)THE UST(s) <br /> ❑ 99.OTEER(Spcci y) M49. <br /> SiCEHDd(01/(13).-114 07!23103 <br />