My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
BILLING_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:43 PM
Creation date
11/5/2018 8:07:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2008-2015
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3550\PR0505827\BILLING 2008-2015.PDF
QuestysFileName
BILLING 2008-2015
QuestysRecordDate
6/21/2017 5:25:18 PM
QuestysRecordID
3453164
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pap 1 aft) <br /> TYPE OF ACTION ❑1.NEW PLAN ® 2.CHANGE OF INFORMATION 190-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> ILTFY INFORMATION _ <br /> CILITY ID N(Agency Use Only) JGW <br /> I I <br /> _. _ L-L= <br /> BUS SS NAME(Same as FACILITY NAME)Valley PaeHSc Petroleum Cafdlock <br /> BUSINES'919ITE ADDRESS 3550 S. Hwy 99 10' CITY Stockton X94 <br /> ff.EQUIMENTTESTING,AND PREVENTPVE ENANCE <br /> Tes[ing,preventive 'ntenance,and celibmtion of monitoring equipment(e.g.,sensors,probes,line 1 detectors,etc.)must be performed at the frequency <br /> specified by Ole equip [manufacturers'instructions,or annually,whichever is more frequent,and dud such work most be performed by qualified personnel <br /> C( 26 23 C22634,263 ,2641) <br /> MONITORING EQUIPMF.IVT'IS SERVICED 1.ANNUALLY C199.0'1TIEA(Specify). 9n3a <br /> 49o3b <br /> 11I.'MONITORING LOC ONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49n-5 <br /> IV.TANK NWffORING IS PERFORMED U G THE FOLLOWING METHOD(S): <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT r10-5 <br /> VAULT(S)WITH AUDIBLE AND VI AL ALARMS. (23 CCR§2632,2 4) <br /> .. SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FI ED IS--:PRESSURIZED [jd.UNDER VACUUM 4909 <br /> PANEL MANUFACTURER: 4saz MODEL ___. . _- 1906 <br /> ----- LEAK SENSOR MANUFACTURER: Vee rRSwt 490.9' MODEL N(S):420 -4 10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTE SED TO MOIIUTOR SINGLE WALL TNK(5).(23 CCR 42643) 4 11 <br /> PANEL MANUFACTURER: 49x12. MODEL M: 490'13 <br /> IN-TANK PROBE MANUFACTURER: 490M114' MODEL N(S): 19x19 <br /> LEAK TEST FREQUENCY: ❑ &CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490'16 <br /> ❑ d MONTHLY ❑ e.OTHERS 3 eso-u <br /> PROGRAMMED TESTS: ❑ a 0.l h. ❑ b. c.OTHERS 490.16 <br /> g.p.h. g.p.h. ❑ (Specify): 49x19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECON IATION( CR 426461): 490.30 <br /> E] 4.WEEKLY MANUAL TANK GAUGING(MTG)( CCR 42643). TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS 490x1 <br /> Lj 490.22 <br /> 5.TANK IN77SGR11'Y TESTING(23 CCR§2643.1 4s2_3 <br /> TEST FREQUENCY: ❑ &ANNUALLY ❑ b BIENNIALLY ❑ c.O R(Specify): 490.24 <br /> 490.25 <br /> El 99,OTHER (Specify): ^90-2 <br /> 49 2 6 <br /> V.PIPE MONITORING IS POFORMED`USING THE FO OWING METHOD(S)(Check all.that apply) <br /> L CONTINUOUS MONITORING OF PIP' PIPING SUMP(S)AND OTHER SECON Y CONrA1NMENT WITH AUDIBLE AND 49o-26 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: DRY ❑b.LIQUID FILLED ❑c.PRESSURIZ ❑d.UNDER VACUUM a9W9 <br /> PANEL MANUFACTURER V e Root30 MODEL B: <br /> LEAK SENSOR MANUFACTURER Veeder Root 4 2 MODEL#(s): 208 4 33 <br /> PIPING LEAK ALARM TRIGGE AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. M a.YES ❑b.NO 490,44 <br /> FAILUREMISCONNECTION O THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMPS WN. ®a.YES ❑b.NO 490x5 <br /> 2.MECHANICAL LINE LE DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.L TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN LEAK IS DETECT ED 123-CCR02636� 49o.M <br /> MLLD MANUFAC ER(s): FE PetrolRed Jacket 490." MOD N(S): STP-MLDIFX4V 490.39 <br /> ❑ 3.ELECTRONIC LIVE IAAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TVIS (23 CCR§2636) 49x-39 <br /> ELLD MANUFA R(S) _ 490-10' MODELA 4 11 <br /> PROGRAMMED IN INE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM A UAL 0.1 g.p.h. °90'42 <br /> ELLD DETE'TIO OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ YES ❑b.NO 390-11 <br /> ELLD FARU ISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a. S ❑b.NO 690'10 <br /> 4.PEPE INTEG TESTING 19w5 <br /> TEST FREQ CY C3 &ANNUALLY b.EVERY YEARS c.OTHER(Specify) 490 4e 49oa� <br /> S.VISUALP MONITORING. 49x46 <br /> FREQUEN Y ❑ a.DAILY [Ib.WEEKLY C]C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49 9 <br /> •Alloxad kr m' of wbwiede 4nfid HSC 25261.5 I <br /> ❑ 6.SUCTI PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(x)(3)). 490-50 <br /> Lj 7.NO ULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE T K SYSTEM <br /> 190.51 <br /> . ( 490-52 <br /> [:] 99OTHERS 12a2h') 490.53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.