Laserfiche WebLink
(OPENINGS IN SLAB TO HAVE L -1/2" CROWN) <br /> A ANNULAR SPACE MONITOR <br /> U" FILL & VAPOR <br /> TK3--5 'IYP. RECOVERY (PHASE 1) - INSPEp1tON WELL <br /> M ' M Q <br /> 4 ;4 <br /> I y <br /> d rt <br /> TOL BELOW OGRADE SHALLLE ACCESS BE <br /> w <br /> 'W LU)IJIU TIGHT AND LOCKABLE ✓� <br /> '.' .• � (IYP.) <br /> 4 <br /> A.C. PAVING <br /> 8" CONCRETE TANK SLAB <br /> �1YP. ALL) tYP�AIL __,18"-__ __ 1f�" W/ aXa/�fM1/4 WWM M/ <br /> DP 1 ) <br /> •yEN(/yAPUR RECOVERY W ��Ta�❑ A.C. PAVING <br /> (PHASE II) ._ - ._ -.>� �.r ;•;-; ._ _ lllllllll - - <br /> 03 <br /> ,I N ter- '� "° ;,u • • _ s — -" �t t - - p Vu <br /> r/ :'r s ♦ �• — - I ' - <br /> `+,. a ... ., �� - -' - •r• .�' ' "- - — ;� - 4D z I � '�'. iP lP:a �.- L i• - 'i ' s .__.,_. s :� - - <br /> r1 -_ !�j iiI111111ii(1fl�l(�f�lil ` ;, ' - -_ <br /> Y _ � .._. >. �3.' MIN. <br /> _ <br /> � !' ---TEMP. ALIGNMENT SPACER <br /> 3" MIN A1FACHFO A FIELD TO <br /> -••� ' MANHOLE SKIRT (IYP. Of 4) - 2OUN0 ALL PENETRATIONS TYP <br /> --- CONTROL. � � TO BE REMOVED AFTER TOP BOTTOM <br /> �- (TOP) <br /> 1' EXPANSION y - _. - INSTALLATION --____-Jl -^ • _ I_ <br /> JOINTS TO BE VVl - <br /> TUULE.D° •NIM �� a. <br /> 3/6" RADIUS <br /> O <br /> d NOTE: <br /> r ---8" x 6"-4/b WWM ALL MANHOLES ON THE TANK SLAB SHALL BE INSTALLED WITH A 1--1/2" CROWN OF CONCRETE WJ ,,,,,,yyy��� <br /> (OR #3 4 1B" AC) TO PREVENT WATER INTRUSION INTO ME MANHOLE. THE ARCO FIELD ENGINEER WILL BE REQUIRED "'�6. <br /> TO SIGN OFF ON THIS ITEM ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE JV'0 <br /> X. <br /> PAID. CONTRACTOR WILL BE REQUIRED TO REINSTALL ENTIRE DRIVE 51-AS AT OWN EXPENSE IF <br /> - THIS DESIGN REQUIREMENT i5 NOT MET. <br /> 14 .:� ' ::'� T L I ®r <br /> --- - V-0" CHAMFER <br /> qq <br /> BOTTOM 2" COVER IYP. <br /> AR CAGE TOP <br /> INSPECTION WELL A /�) Typical 'Slab" at Tanks <br /> ALL AROUND PENFTRAHONS \(\ <br /> NOTE: SEE TK1-t FOR SITE SPECIFIC TANK ARRANGEMENT .� <br /> Typical Tank Slab Reinforcing Nor TO SCALE. <br /> NOT TO SCALE: <br /> FILLER FABRIC ON BOTTOM <br /> FILTER N FABRIC REQUIRED DEADMAN DIMENSIONS <br /> �;F TANK HOLE SEE NOTE 110. 1 NOTE; <br /> IN UNSTABLE SOIL (AS TH DEFINED TANK DFADMAN OEADMAN DEINDMAN ARCO CONSTRUCTION WILL PANT COVER BLACK <br /> BY SOILS tFT,REPORT) THE DIMENSION ES <br /> Must BE M1 FT, FRG¢A' BOTH SIDES TANK SIZE LENGTH LENGTH pEPI'H WIU(H AND TAG EACH Flu RISER WITH THE <br /> PROPER PRODUCT I.D. TAG. DISTRIBUTION <br /> AND ENDS ('NITH FIBERGLASS TANKS)'- FA• ♦O1 !^r TDF IS RESPONSIBLE FOR PAINTING THE CORRECT <br /> A.P.I. COLORS. <br /> MIt C 4 0' DIA. W-9 1/$ 7'-9 1/4" 8" Ir <br /> 560 GAL <br /> t I / H) FT. DIA. <br /> t _J MIN 10,000 GAL 21'-5 I/4" 22'-5 1/4" 1'2" 18" - <br /> 12,06 C10 FT AL '2V-1/4 25'-I/M1" 12" 18" STANDARD DETAIL FOR S. 17' <br /> ^ OR 1M1" ACCESS COVERS MIT <br /> (\,•,J� OTHER MARKINGS ARE PERMITTED. <br /> TO F7. DIA. 29'-5 3/b" 30'-5 3/4" 12" 1B" <br /> 15,000 GAL <br /> LI0 FT. DIA. sr-B s/�' 3B'-a 3/b" 1z" 1B'T A�preal Anchoring for 0,ODG GAL <br /> M 10'-0» Diameter Tanks NOTES: <br /> B <br /> NOT TO SCALE: (d) FILTER FABRIC 4DUPONT fYPAR OR MIRAFI 500X) 15 REQUIRED. , <br /> FABRIC MUST EXTEND V ABOVE MAXIMUMM HIGH WATER TABLE AND <br /> MAY BE PINNED TO SIDE OF HOLE WITH IRE, ETC., SEAMS STAGE I VAPOR RECOVERY FILL PORT %= <br /> ---NEW FIBERGLASS TANK MUST BE LAPPED V MINIMUM. - <br /> (2) TANK MUST BE BALLASTED BY FILLING WITH WATER UNTIL BACKFILL Pt _` CK `Y <br /> -- —CONCR TE "DFADMAN'. WHEN MORE IS COMPLET€. At TI : 00 NOT FILL FIB RGLASS TANK WITH PRODUCT ���^\\� .� x4" FJIGHWAY F � YOR R tRy FOR u <br /> THAN ONE TANK L-$ INSTALLED THE UNTIL BACKFILL ' WITH TOP. SEE PECIFICATIUNS. \ --FILL PORT - PRODUCT ID€NTIF A 4f C. EU D <br /> - DDEIA�OMAN BETWEE TANKS SHALL BE WHEN INSTALLATION IS COMPLETE, WATER 15 TO BE COMPLETELY PUMPED \ PER API STANDARDS. EPDXY MOUNTED <br /> BOTH TANKS. IDTH TO ASCO ?UT <br /> -C�UY AND MOPPED DRY 50 THAT NO PROBLEMS OCCUR WITH PHASE \� \ INSTALL€D D'( ARCO UISTRIBIJTION U <br /> SEPARATION DURING 'WINTER OXYGENATED FUEL SEASON. -� ri' ACCESS PORT - ` • '�..J%' * ►•"" �v� <br /> J'-0" APART SEE CHANT) / -- �� <br /> (3) OR WH N TO UI INSTALLED INA EWETNG HOLE <br /> OR WHEN REQUIRED 0'f OWNERS ENGINEER STAGE I VAPOR RECOVERY— 4 • a ` -- -,.� <br /> OR AUTHORITY HAVING JURISDICTION. <br /> T10N <br /> . C - ------ - FIBERGLASS HOLD.-DOWN STRAPS WHEN REQUIRED, THE ANCHORING SYSTEM <br /> FURNISHED BY TANK MFR. SHALL BE IN COMPLIANCE WITH AUTHORITY <br /> & PLACED AT DESIGNATED PLANING JURISDICTION. 1 <br /> LOCATIONS. NUMBER AS REQUIRED r - 4"x4" HIGHWAY R FLttON, ,M ALR E FOR <br /> ( ) (4) WHEN GROUNDWATER LEVEL IS ANTICIPATED TO BE FR000CT IOENIIFIATIUN. COl9�E <br /> WITHIN 5 FEET OF GRADE CONTRACTOR SHALL NOTIFY PER AAPPI STANDARRS. EPDXY MOUNTED \ <br /> BALLAST TANK ARCO FIELD ENGINEER FOR DIRECTION ON ANCHORING 8" ACCESS VORT- � WSTALLED BY A,4,0 OISiRIBIJTION$ <br /> A W11H WATER ONLY METHOD TO BE USED. (OEADMAN OR ANCHORING SLAB) (U qE ORIENYATEO ` THIS PJ2FA TO THIS AREA TO <br /> 'B• (IF REQUIRED) (5) WHEN ENGINEERED SHORING IS REQUIRED DUE TO SITE To ME SAME SIDE REMAIN BLACK REMAIN BLACK <br /> CONDITIONS AND ENGINEERED SHORING PLAN UTILIZING AS TANK LEVEL CAU GE <br /> INTERLOCKING STEEL SHEET PILING SHALL BE PROVIDED AND <br /> SHALL INCLUDE SUPPORTING ENGINEERING CALCULATIONS BY <br /> f -- - - .J A STATE CERTIFIED ENGINEER. <br /> .5�4" WIRE ROPE W/-- API STANDARD COLORS <br /> f IPL E V CLAMP --•---- <br /> COVER ENTIRELY 'W/ \ ((EC)) UNLEADED PREMIUM 92 OCTANE -- RED <br /> LIBERAL COAT OF (EC3 UNLEADED 87 OCTANE - WHITE <br /> ASPHALT CEMENT IEC UNLEADED PLUS 89 OCTANE - UI.Uf- <br /> - A$ ROD "HAIRPIW--_ mr» 8r ra e15_5 <br /> ONE FOR EA. STRAP WHEN OEAUMAN <br /> Ig PRECAST OUT ' /� �C,)� <br /> OF ME NOE ADD Access Cover Identification _ _ <br /> 2 3 t2E13AR---- 4 --'c OFA H'COVER�(4)N Standard Two Point Fill <br /> NO. DATE REVISIONS PROJECT RELEASE Prof, eXu. drum) by <br /> FU I. LENGTH T, ._. — -- ----- <br /> �, 'W y Y' COVER { SHK <br /> TYPICAL FOR 10' DIAMETER TANKS 1C i8 ------- -- --- - ----- - --- - PERMIT Typical e� {,� � fp SCALE:- �Pro)�Irt 7 facility — <br /> ( ypical Tank Anchoring - SEE CHART FOR DEADMAN <br /> , • DIMENSIONS <br /> BID <br /> and Connections �` o- <br /> - CONST. oneni ji+ta'-- - <br /> 1� — ---- - - --- -- - — � ARCRITEMRE • ENGINEERING • ENYIRUNMENTAL SERVICES <br /> NOT TO SCALE: 550 HONE AM SIE. 504 SALRANENTO, CA 95825 (916) 846-4005 A5'BIJILf - { � <br /> 08W► Mc JLNiN W. JOHtiso,4, ARuOIECT JAMES H. NAY, CIVIL ENGIN(ER nl <br /> Fife: 201'1-38A �. <br />