--�� `TANK AND PIPING INSTALLILA`j ION NOTES
<br /> 1D INSTALL ONE 20'000 CALLON, ONE 12,000 GALLON AND ONE 10,000 GALLON DOUBLE 'HALL TANKS '41111
<br /> 'VEEDER ROOT' TLS-350 ALARM 5YSIEM. TANKS TO BE SET MIN, 48" BELOW FINISH GRADE, SEE OWGS.
<br /> TK2-IA, IK2-10 SO IK2-1C FOR AODITIONAI_ INFORMATION, SEE DETAIL X17 ON M. 1X3-5 FOR TANK
<br /> ,ANCHORING IF RECLINED, SEE DETAIL #10 ON DWG. 110-2 FOR IYPICAL PIPING ARRANGEMENT ;AT TANKS,
<br /> NOTE: A MANWAY AND DUAL FILLS ARE f0 BE INSTALLED ON P.HE 20,000 GALLON
<br /> 8) OCTANE TANK ONLY.
<br /> F
<br /> NOTE: FOR SIZES WITH MORE THAN 12 FUELING POSITIONS. A MANWAY WILL BE INSTALLED UN ITIE 1>1P
<br /> TURBINE SIDE SUMP LOCAIION OF THE 20,000 GALLON 87 OCTANE RANK ONLY, .
<br /> 4'� _..._..-_.._.,.-... _ .-•w-------•••--- C INSTALL A 6' REINFORCED CONCRETE SLAB OVER TANKS. SET MANHOLE COVERS
<br /> {1 __ ' __""_'"_" "'" __ _===_•_ -=`�-� 1-1/2" ABOVE SLAB. SEE DETAIL I)16 ON OPG. tX3-5. 27 MAX. SLOPE ACROSS TANK SLAB.
<br /> • i i •I�� 4) ((• � IL-L.1
<br /> � INSTALL FOUR (4) 4' DUAL POINT FILLS. SEE UWCS. 1M2- LA, 8(2..13 & I'R2--IC.
<br /> II I • .�• •�• 2
<br /> �,
<br /> NO IE: THE 20,000 GALLON 87 OCTANE TANK SHALL 14AVE DUAL FILL PORTS.
<br /> IIICJ INSTALL FOUR (4) 3' DUAL POINT STAGE I VAPOR RECOVERY FITTINGS. SEE D'W'G. M2'-IA, IX2-IB 0
<br /> -r NOTE: ITIE 20,000 GALLON 31 OCTANE TANK SHALL HAVE DUAL STAGE I FITTINGS INSTALLED. ��pam�+) "u
<br /> CTXI
<br /> TW
<br /> 3 14 (, INSTALL ONE UE 2 HP VARIABLE SPEED TURBINE IN THE 8/ OCTANE UNLM t),T,�NK FOR SITES WiRI3 -4 X- LVF 12 OR LESS F UNG POSITIONS. INSTA)L-TWO�(2) EVHP_,xMA ABLE 5PfETJ iTJ f71NE5'(MA8TFR/kAVEj;:)yxiINF +
<br /> —rll - f\\ � _A7>OFTANE-UNLEADEft:fANK F-OH.SITES",VVITHLMOR€_.TffiAN-f2-F"UEUN(k-N(Ig�71GV`i (MANWAY kEtdUINEO). hVSTAI_L
<br /> /rr'`2� i,l 0 `(7YP SINGLE HOSE PER ONE (1) 1 1/2 HP STANDARO TURBINE IN THE 3`3 CC LANE TANK AND OFT- (1) 1 i/2 HP STANDARD RJRBRIF +� �+
<br /> \. ( ' SIDE 3 PROOUCf MPD) IN THE 32 OCTANE TANK FOR ALL SITE CONFIGURATIONS. INSTALL 'VAPCRLE5S' MECHANICAL LEAK DETECTORS J +
<br /> ON ALL IURBINES.
<br /> INSTALL" SINGLE WALL STAGE 11 VAPOR RECOVERY LINE FOR "BALANCE' VAPOR RECOVERY SYSTEM.
<br /> SLOPE 1 H' PER FOOT MINIMUM TO TANKS. SEE DETAILS AND SECTIONS ON OWG. IK.5-3.
<br /> ' I t
<br /> INSTALL THREE 2' DOUBLE 'NAL PRODUCT IN N ( B IPP F
<br /> E L OU ES. UES 0 E tOl Ep E WI EDF SENSOR »
<br /> r � _ _®_ ( 1N 1URBINF. SIDE PIPING SUMP ATTACHED TO TOP DE TANK. SENSOR TO BE WIRED Fc,Y2 TURBAN SHUT GOWN.
<br /> cl� VENT dt STAGE IF — — — — •= •' ,.....+ • �•Y'( SEE DWG. TK4-1 FOA? WIRING UbACRAM. SLOPE 1/8" PER FOOT MINIMUM TO TANKS. SEE DE1 AIO ON -
<br /> S) IAPOR RECOV (�TYPT l+ _ i I UNG. IK.5-2 FOR i'fVICAI. PIPING ARRANGEMENT AT TANK. PIPING SHALT. BE INSTALLED PER MANUFACIUREIR'S
<br /> RECOMMENDATION.
<br /> �j �> TURBINE (TYP)----- • 3 INSTALL 'VEEOER ROOT" TANK AND LINE ALARM PONIROL PANEL MODEL ILS -350 ON TELEPHON "
<br /> , ] BACKBOARD IN BUILDING. SEE DRAWING PK4-1 FOR LEAK DEIECHON AN DISPENSER 'WIRING DIAGRAM. [ ]
<br /> SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION, iJ
<br /> IiEI f
<br /> (
<br /> INSTALL THREE (3) 2" FIBERGLASS VENT LINES. SLOPE 1/8' PER FOOT MINIMUM TO LINKS.
<br /> YP) C1� (ER!dINA RICIN POINT OF TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT w
<br /> AISIIN S' FROM ANY BUILDING OPENING OR PROPERTY UNE INA( CAN OF BUILT UPON.
<br /> VENT RISERS SHALL 13E INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS.
<br /> INSTALL. G4RFE (3) 3/4" 40 CONDUITS FOR SUBMERSIBLE PUMP PO'AER. �+
<br /> NTATHREE (3) ANNULAR SPACE MQNiT©R PROBES i7 EE DNf fR'l-IA, M'L-13 & fK2-IG.
<br /> ANNULAR SPACE (TYP)-C� `� 4 ) yv INSTALL BALL FLOAT VALVA/EXTRACTOR ASSEMBLY FOR `/ENT 4 SPACE R VAPOR RECOVERY.
<br /> CI;, __-/ SEE UPC, IK2-1, TK2-19 11<2 -IC. SEE DETAIL J5 ON OWL. tK.3--t. a.
<br /> OC, / ,/ Q� SEE DRAWING iK4-'2 FOR MONITORING CONDUIT UF_(AIL S.
<br /> i s` ' = --'- -'- • ..�. �.• �g TANK LEVEL GAIJCE RISER LOCATION (IF INSTALLED).
<br /> .. �. _
<br /> E
<br /> ;./� '� /�'�� � . ' o • Xj• •�� QD INSTALS TVEG'(2}JNSPEOTI.T�NfMr)NFtORINO_'N`tlLS ASSITYWN. . SEF pWGS. iK2 '1A, IX2-1U & TK'L-1G.
<br /> 1Z) FOR FILA. IDENTIFICATION MARKINGS AT TANK MANHOLES, SEE DETAIL 418 ON O'WG TK.3-5,
<br /> Cl-�) INSTALL 2" CIA, INACTIVE SIPHON LINES AS SIIO'AN ON DETAILS ;j6,
<br /> #7 AND 48 ON DWG. TK3-2.
<br /> \ /1P// INSTALL (9) NINE GILBA12C0 'ADVANTAGE" 8-83 :ANGLE HOSE PER 510E !TILL TI--P1200UGi DISPENSERS A5 SHOWN.
<br /> \\\\.`\ �cr i L _ - -- -. - --==r- - -- - - -- - - -� U1 PENSERS TO BE FITIED Yd IH Q_ALANCE STAGE 11 HOSES AND NOZZLES, BREAKAWAY VAI-VES AND UNDER
<br /> _ Q! PENSER CONTAINMENT INCLUUINNC PRODUCT AND VAPOR SNF-AR VALVES AND SM INTERCOM SFE OWr>S
<br /> AND 110-4 FOR IYTlCAL INSTALLATION DETAILS. SEE D'W G. I'KII1 FCR DISPUNSER 161RING DIA( RAM_
<br /> SLAHT UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR t0 PURGE ONES WITH 200 GALLEONS PFR Hr.)SE
<br /> \\\ / CAUL* (FUTURE 1W} "1 Pj MINIMUM; ANY AIR POCKETS OR START UP moftEMS DU£ TO IMPROPER INSTALLATION OR INCORRECT
<br /> WRING THAT DESTROYS ELECTRONICS MILL BE BILLED BACK TO CONTRACTOR.
<br /> \\ NOTE THAT PIPING TO HIE DISPENSERS MUST ALWAYS BE INSTALLED TO INE 'B" SIDE OF THE DISPENSER
<br /> \\`i\
<br /> FILL (7YP)- TO ENSURE PROPER MOUNTING TO 1}FE UNDER DISPENSER CONTAINMENT SUMP j✓d
<br /> \ \\
<br /> \ \\
<br /> STAGE I VAPOR RECOVERY
<br /> INSTALL STATIC GROUNDING SYSTEM PER DETAIL #4 ON DWG, (K4-2.
<br /> --------5PAIRE SIPHON i'fP -C > - " C2� ALL NEW PIPING AND TANKS TO Bg INSTALLED PER MANUFACIURERS RECOMMENDATIONS AND
<br /> / ( ) 1 INSTALLATION INSYRUCTIONS. CUNTf1ACTOR SHALL USE FLEXIBLE CONNECTORS FROM THE TANK SUMP
<br /> TO T}iE VAPOR RECOVERY MANIFOLD, MAIN PRODUCT LINES AND SIPHON PIPING OR SHALL PROVIDE
<br /> vvvv S _
<br /> (3) 2" DIA >AI_V AT LEAST 4 FEET OF SIRAIGHT FRP PIPE RUN BEFORE A CHANGE OF DIRECTION OF MORE '
<br /> IRAN 30 DECREES.
<br /> VENT RISERS
<br /> ---- - COMPLiANCE NOTES
<br /> _. -' --- •- -.-. __- T""'---- ARCHIIEOIURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL
<br /> DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT LOCATIONS
<br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN IPE 5
<br /> FIELD BEFORE STARTING ANY ''NGRK. ANY DISCREPANCY SHALL BE CALLED TO
<br /> IIIE ATIENTION OF IRE OWNERS ENGINEER FOR HIS DECISION BEFORE
<br /> -- -----._-_ '- PROCEEDING.VAT14 THE WORK. a
<br /> -' - - '-- - ---..-_-_ . _ GENERAL CONTRACTOR SNAI_F. OBTAIN NECESSARY PERMIT FROM T1iE OtVi51GN $
<br /> ""`-`•^----- - _____ - "`-- '-- -=_---=_....___-- _ OF INDUSTRIAL SAFETY (STATE OF _ ) FOR EXCAVATIONS OF IIRENCHES iz
<br /> -0" OR MGRE IN DEPTH INTO '4HICH A PERSi)N IS REQUIRED TO DESCEND. S
<br /> GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING AGENCY
<br /> GENERAL NOTES PRIOR 10 TANK INSTALLATION. 31
<br /> TANK SYSTEM TO HE INSPECIED BY ARCO FIELD ENGINEER .& GOVERNING AGENCY AT FOUR (i) , IL +('�
<br /> CALL I-NO WORKING DAYS PIPING LEGEND - SEPARATE CONSTRUCTION PHASES AS REQUIRED:
<br /> BEFORE YOU DIE -•---------•— � - 2" F.G. DOUBLE WALL PRODUCE PIPING
<br /> 263-1100
<br /> � - -- 2" OR 3" F.G. SINGLE WALL VAPOR RECOVERY PIPING 1. TANK AIR ZEST BEFORE SETTING IN HOLE AND SOAP TEST.
<br /> ! 2" F.G. SING
<br /> WALL VENT PIPING 2. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY IESfED FOH 30 MINUTES.
<br /> --- .---- —G ----• ---- EXISTING UNDERGROUND UTILITIES 3. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING IESIING, IN ACCCROANCE `MIH MANUFACIURER'S GUIDELINES.
<br /> I•S,TAa f+ ('NATER, GAS, TELEPHONE , SEATER) 4. FINAL. INSPE1,11011 INCLUDING ALL PORIIONS OF THE LEAK DETECTION SYSTEM.
<br /> (CUTSICE MARICOWA COUNTY) • VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDR05TAfICALLY TESTED 'Mill
<br /> i/8' PER FOOT MINIMUM. SIPHON PIPING TO SLOPE 1/4-INCH PER FOOT. STANDING WAIER FOR A PERIOD OF 24 HOURS TO INSURE T14AF THE SUMPS ARE WAIERHCHF. AHE ARCO FIELD
<br /> ENGINEER MUST SIGN OFF ON THIS IESTING ON THE TANK INSTALLATION CHECKLIST BEFORE CONIRACTCR WILL BE PALO.
<br /> • SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY,
<br /> NOT GRAPHICALLY. ALL PRODUCT PIPING TO BE DOUBLE CONTAINMENT TANK S`OSIEM INIEGRNY TESTS FORWARDED AND APPROVED BY GOVERNING ACENCY PRIOR TO TANK SYSTEM
<br /> PIPE. VAPOR RECOVERY AND VENT PIPING TO BE SINGLE WALL PIPE. BEING PLACED IN OPERATION.
<br /> TANK ELEVA110QN TO CALCULATE TOP OF TANK ELEVATION. START 'MPH 18" MINIMUM DEPTH OF VAPOR AN UNAUIHORTZED RELEASE RESPONSE PLAN MUST BE SUBMITTED :AND APPROVED 13Y COVEIINING AGENCY
<br /> RECOVERY UNE AT INE FARTHEST DISPENSER AND SLOPE 1/4" PER FOOT MAXIMUM TO PRIOR TO TANK OPERATIONS.
<br /> 1f16' PER FOOT MINIMUM. ADD 12' AT THE TANK. ADO 13" (FOR .3" PIPE) OR 8" (FOR 2")FOR A CHANGE IN PIPING DIRECTION OTHER THAN 90 OR 45 . SET I-ANKS 6' DEEPER THAN EVIDENCE 'F FINANCIAL- RESPONSWILIfY SHALL BE SUBMITTED TO GOV'EI2NIVG ACENCY.
<br /> CALCULATED AS PRECAUTION. IN NO EVENT SHALL THE TANK BE BURIED LESS THAN 4'-0"
<br /> BELOW FINISHED GRADE OR DEEPER THAN 1'-0" BELOW FINISHED GRADE. SEE MANUFACTURERS ALL MATERIALS SHALL BE COMPATIBLE MITT USE FOR PIE INTENDED PURPOSE AS
<br /> INSTALLATION RECOMMENDATIONS. ANY VARIATIONS IN SLOPE FROM 1/4" PER FOOT SHALL PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORITIES.
<br /> BE REPORTED TO THE FIELD ENGINEER, nru�ter r 3Yoy>e uJS a
<br /> N0. OAfE REVISIONS- -- PROJECT RELEASE proj. exe. drovn by
<br /> kNE
<br /> PARTIAL UNC�ERGROUNC7 GASCJL.INE TANK ANCA PIPING SCfE PLAN
<br /> m » IL PERMIT
<br /> Pry•>,,:� "ilil
<br /> t3CAlb Y • p'-7 s ( IN' Y10 I NORTH
<br /> >- 1 inoh ->10 L -` ---
<br /> ---- - -- — — — cnusr, eat I file-
<br /> - — - —--• ---- --
<br /> i_Y"f ARCHIIECTURE • ENGINEERING i ENVIRONMENTAL SERVICES ___-.___ TKI
<br /> . iL 650 HCWE ASE. STE. %4 SACRAMENTO, CA OH25 (915) 646 .4005
<br /> * r}tOKIq1► TJCifN N dCHN5cn4, ARC1+nECf JAMES N. RAY,RAY, f,1`nL EN�'INEER
<br /> -,K-4_ AS -BlJlli �I
<br /> fila: 2012f K 12
<br />
|