My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:14:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2012-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 16 13 03:07p Reliable PetroleumA 209-845-8953 p.5 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (St Dmit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclose YES[] NO,[t' <br /> 2. Submit copies of CC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing r testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available n the jobsite as required by Title 8. <br /> 3. Detailed descripti in of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing cation of repairs andlor replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, U 's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as neci ssary for a timely plan review): <br /> C' cs a t [5 i3 <br /> t� <br /> VN <br /> SS(A r <br /> 4. List of equipment tc be used (Attach manuiacturer's specification sheets showing third-party approval) <br /> rryKJV�C( i <br /> I <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.