Laserfiche WebLink
6. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ®Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑ Pressure ❑vacuum ® Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution:0.0001 <br /> UDC#17/18 UDC# UDC# UDC# <br /> UDC Manufacturer: UNK <br /> UDC Material: FG <br /> UDC Depth: 34" <br /> Height from UDC Bottom to Top 10" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 91, <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to FAIR <br /> testing: <br /> Portion of UDC Tested 15" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ®Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> product and water)?' <br /> Turbine shutdown response time 10 SEC <br /> Is system programmed for fail- <br /> safe shutdown? ®Yes❑No❑NA ElYes[:1No❑NA ElYes ElNo ElNA ElYes ElNo[-INA <br /> Was fail-safe verified to be ®Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN <br /> starting test <br /> Test Start Time: 1:48 <br /> Initial Reading(R,): 3.7592 <br /> Test End Time: 2:03 <br /> Final Reading(Rr): 3.7592 <br /> Test Duration: 15 MIN <br /> Chane in Reading(Rr-R,): 0.0000 <br /> Pass/Fail Threshold or Criteria: 0.002 <br /> Test Result: 0 Pass El Fail Lj Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testine? ® Yes❑NoEl NA YesEl No NA ❑Yes❑No❑NA ❑ Yes❑No❑NA <br /> Was sensor properly replaced and ® Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior io testing and recommended follow-ap forfailed tests) _ __ _ <br /> RECEIVEL.' <br /> JAN 3 0 2015 <br /> ENCV^IRONMENTAI <br /> H EAt T,J�T:0.47-ftr% T <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to vany of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See S WRCB LG-160) <br /> Secondary Containment Test Results 4 of 4 <br />