Laserfiche WebLink
UNDERGROUND STORAGE TANK yys. <br /> RESPONSE PLAN— PAGE _, <br /> (One form par facility) <br /> TYPE OF ACTION I.NEW PLAN d1 2.CHANGE OF INFORMATION 07,77 mu Rot. <br /> I. FACILITY INFORMATION <br /> FACT LITY IDs (AgenqU'ea 0,N '. <br /> BUSINESS NAME(Same as FACILITY NAME) �' <br /> � ° I;-t �.'�1�;T Rttt. <br /> BUSINESS SITE ADDRESS R°J CITY r� <br /> S J AN <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan Addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> Y If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut•otf,,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system, <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greeter than 30 calendar days,or sooner if required by the local enc <br /> for theft intended use,u" be rtlenA"Cd As haserdous waste. Agency. Recovered hazardous materials,unless still Suitable <br /> Y Absorbent material will be used to contain and clean up manageable Wits of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be Managed its In waste unless a wane determination in accordance with 22 CCR 466262.11 finds that <br /> it is ten-hazardous. Used absorbent material, reusable or waste, trill be stated in a properly labeled and HAkd co taiacr. Waste material shell be disposed <br /> appropriately, <br /> > Facility personnel will determine whether any water removed from secondary containment systems, or from cleanup activity, has been in contact with any <br /> hazardous material. If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i,c.,rainbow colors),it is contaminated. A thick Floating petroleum layer may nes necessarily display <br /> rainbow colors. Water(hazardous or none hazardous)from sumps,spill containers,etc.will not be disposed to norm water systems <br /> > Wa will review secondary containment systems for possible deterioration if my of the following conditions ocew: <br /> 1, Hazardous material in contact with secondary Containment is not ctmpanbte with the material used for seeomlary containment; <br /> 2. Secondary wntabtmem is Prone to damage from any equipment used to remove or clown w hazardous material collected in swvndmy eaotainmern; <br /> 3. Hazardous material, other than the PmducdWanc stared in the primary containment system, is placed inside secondary containment to heat or neubalin <br /> released Producltwaste,and the added material or resulting material from such a combination is not co ibte with second <br /> n'Pm wry confeinmem. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept pormanendy n I site is ILr Zi m the facility's Havudous Materials Business plan. This <br /> egoipmam Is Inspected at lean monthly,and after each use,supplies are raplenishad as needed, t)efecnve equipment is repaired a reps Maced es ala Busin <br /> E UIPMENT NUT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IFNEEDED: 1Com Tete onl ife livable <br /> E UEPMENT LOCATION AVI a livable <br /> n�,. T q <br /> Rio, BILITY <br /> Ck. _ /1 azp. n <br /> sd•P+l} /fJ3�� RII. ICO'O i.` 2—LA 1 s r aJe <br /> iTV Hal. S' est C� <br /> yRit. <br /> All An <br /> R2 <br /> Rai. <br /> A23. <br /> R)J. <br /> RII. R71. <br /> Rid. <br /> Rb. <br /> RJS. <br /> IV, RESPONSIBLE PERSONS <br /> THE FOL WING PERSON($) RESPONBtBLE FOR AUTHOR{ZINC ANX WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME <br /> �j RrO� 71TLE a. <br /> NAME <br /> Ral. TITLE <br /> NAME A <br /> Yo Ql/ t/` R.Z. TITLE <br /> NAME ✓ Lt <br /> Rd3, TITLE <br /> RpJ_ <br /> V- MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE <br /> ❑Additional system testing or dere collection <br /> Other: '�'[InsPection by qualined persons ❑Recalibration of MADE A$FOLLOWS: <br /> Arl^d d\VI CR equipment <br /> p <br /> Rea, <br /> UST Response Plan(3/2008)-113 <br />