My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 1998-2003.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1• <br /> WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.Ile permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITY NAME DATE 'l / 1 t rz- <br /> FACILITY ADDRESS t SrS1" �a 9 29 i9 t' l m�v a S c roct�r� �1 <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> p012 LS nS T-64- -�VND , ev"-r v-�(a eytL rPr-2.�M,rK.S r•�o-+`� -r-'�6 <br /> Pr C nt kSS tn�J rQnrr�-O�-- CRovTtroer rye C'rbL�ey .•....�_r ArT�-n•t p-+.r-r�6- llr Sf R"r�-t"�'> <br /> 2.Descn'be the frequency of performing the monitoring for: <br /> TANKS Io t.0 T I N v e-- S PIPING In NTt rj S <br /> 3.De5cribe the location(s)of where the monitoring will be performed ie: location of sensors <br /> CuN jtIYL-S 1N hYJNN IFS!- SPT-�y �J Wl.f 11 l(U C. YM�1(J'L IN hht.rC.. RWYN <br /> 4.Deseribe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel Vt 'R-0-oT <br /> Name and Model of Line Leak Detectors R-EIm J&w e r C.P T <br /> Name and Model of Annular Sensors I t s 3'1 a —L4 o "t <br /> Name and Model of Piping Sensorsy�E�Q c 2 ¢®aT Z 9 t 3�t o -2-o Sl <br /> Name and Model of Dispenser Sensorsy 2-u ° c 'h "u`4 350 - 2 o Sf <br /> Type of overfill prevention <br /> 5-Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes❑ No❑ <br /> Does the turbine shut down if a sensor is disconnected? Yes❑ No❑ <br /> Does the turbine shut down is the monitoring panel loses power? Yes 0 No❑ <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> qt,w+-*n wt13E "b4,Cy oN USC i4-r,w-¢n./ Lel,' A.�o [LE.q.,t+e.t=o rv�atN rc-+�•+e•E <br /> tier wati CV6WCLADS . i - aE 1LMe 2 qw 4e rev.�v� ra..c4 fi vner� - <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? • - i N I C-t`PM J C6' f"AL5+ 4-S W T Ft ItnoN ITS <br /> y+FN— 66 tAAA ,6-1-k INID l tStu'DN ro IW-OL - tI.WNFfD✓L 15 CfYLft Ft Er] t.tV <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping, and the monitoring <br /> equipment. T2ANL.L <br /> iL w� Qe P"-F oc-u PON t+,e.E n-No R�{f tLES Ft�(♦_. _ cf�.A-t N.NV <br /> P LOv I DEb A T I..EH S T hN NV rit.t,.,.{ ��E-ya.{-Tt�tG. <br /> 1,.4rstcmi 4c\usT4imnitoringplan.doc <br /> 1242002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.