My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 1998-2003.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) followoperating procedures specified by ARC,* <br /> (f) immediately report to ARCO all suspected or confirmed releases from the tanks and <br /> connected piping system, unusual operating conditions, release detection signals and <br /> environmental conditions suggesting a release may have occurred, and any spills and <br /> overfills that are not contained and cleaned up, <br /> (g) properly close the underground tanks as required by law; and, <br /> (h) comply with all federal, state, and local legal requirements relevant to the operations of <br /> the underground tanks and all amendments to any permit to operate. <br /> 4. With respect to the operation of the underground storage tank system and monitoring equipment. <br /> Franchisee hereby acknowledges and agrees: <br /> that ARCO has provided Franchisee with training on each of the items described in the attached <br /> Monitoring and Response Plan, <br /> that Franchisee understood the content of the training, and asked any questions necessary to <br /> facilitate his understanding, <br /> that Franchisee indicated to ARCO at the time of training any subjects addressed by the training <br /> which Franchisee did not fully understand, and <br /> that Franchisee received complete training and information necessary for Franchisee to fully <br /> understand the subject of operating underground storage tanks. <br /> 5. ARCO has provided Franchisee a copy of and Franchisee agrees to maintain on the Premises <br /> the Certificate of Financial Responsibility (as required by the United States Environmental <br /> Protection Agency in Subpart H, 40 CFR, Part 280 and California Health and Safety Code, <br /> Chapter 6.7, Section 25292.2). <br /> 6. Except to the extent that conflict with, or are less rigorous than the terms of this Amendment, all <br /> of the terms and conditions of the PMPA Agreement, as previously or hereafter amended or <br /> supplemented, remain in full force. <br /> IN WITNESS WHEREOF, ARCO and Franchisee have executed this Amendment. <br /> ARCO Products Company <br /> a division of Atlantic Richfield Company <br /> ARCO <br /> WITNESS: <br /> /v <br /> �( 1i (ui rYu By: <br /> Manager - <br /> WITNESS: S L G3 S <br /> Franchisee's Name <br /> By: <br /> DATE: 5//3 Y <br /> CA(1/92) 2 of 2 <br /> PARSBW <br />
The URL can be used to link to this page
Your browser does not support the video tag.