My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 1998-2003.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND RESPONSE,PLAN - SC <br /> ARCQ_PRODUCTS COMPANY FACILITY WITH <br /> DISPENSER SPILL CONTAINMENT DEVICES <br /> ARCO Facility: '63 5 Address: �fg5 5 <br /> Tu C)L CA . <br /> This is a monitoring and response plan of action for facilities with spill <br /> containment devices installed beneath the dispensers. <br /> 1 . CONTAINMENT EQUIPMENT <br /> Dispenser spill containment devices [box{esl] are located beneath <br /> each dispenser to contain any leaks from components and fittings <br /> inside the dispenser cabinet. A mechanical sensor is located in the <br /> box. When the sensor detects the presence of a liquid, it will activate <br /> the impact valve and shut the dispenser down. <br /> 2. MAINTENANCE SCHEDULE <br /> The containment devices will be inspected according to the <br /> manufacturer's instructions by an outside contractor once during each <br /> calendar year. <br /> 3. ROUTINE MONITORING PROCEDURE <br /> On a weekly basis the facility operator shall: <br /> A. Inspect each containment box for the presence of a liquid. <br /> S. Remove debris from the containment box. <br /> If any liquid is found, manually close the impact valve, place the <br /> dispenser "out of service", and call ARCO Maintenance immediately. <br /> 4. RESP N E PROCEDURE - CONTAINMENT BOXES r <br /> OPERATOR RESPONSIBILITIES <br /> In the event the impact valve is activated and shuts down a <br /> dispenser, station personnel immediately: <br /> i <br /> - I <br />
The URL can be used to link to this page
Your browser does not support the video tag.