Laserfiche WebLink
Site Address: 4855StHwy99 <br /> • Date offing Servicing: 2/13/03 <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> . . . . . . . . . . . . . . . ... _. .. . . . : : : : : : : : : : . . . . . . . . . . . . . . <br /> �� . . . . . . . <br /> : : : : <br /> . . . . . . . . . . . . . . . . . . . . >5 <br /> t' <br /> t <br /> Date reap was drawn:_�_�_• <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> 05/00 <br /> Page —of <br />