My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:16:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\1997 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC ITEALTH SERVES <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DIVISION <br />Ernest M. Fujimoto, M. D., M.P.H., Acting Health Officer <br />304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br />209/468-3420 <br />JUNE 4, 1997 <br />BRIAN PIPES <br />RHL DESIGN GROUP <br />650 HOWE AVE. #504 <br />SACRAMENTO CA 95825 <br />ENVIRONMENTAL HEALTH DIVISION <br />304 E. Weber Ave. Third Floor <br />P. O. Box 388, Stockton CA 95201-0388 <br />Approved JR <br />Denied ❑ <br />Conditions <br />3j�Lo <br />Date (x, 44q by <br />RE: APPLICATION FOR UNDERGROUND STORAGE INSTALLATION PERMIT FOR <br />ARCO FACILITY #6335, 4855 S. HWY 99 EAST. <br />The above referenced application has been APPROVED WITH <br />CONDITIONS. The following are the conditions of approval for <br />this permit: <br />1. The contractor shall be properly registered with Public <br />Health Services -Environmental Health Division (PHS-EHD). The <br />proposed contractors have been reported as: Paradiso, Fillner, or <br />Gettler-Ryan. <br />2. The continuous monitoring system shall: <br />a. be connected to an audible and visual alarm system and <br />the pumping system. <br />b. shut down the pump and activates the alarm system when a <br />released is detected. <br />C. shut down the pumping system automatically if the <br />continuous monitoring system fails or disconnected. <br />OR <br />An annual line test shall be conducted on all underground <br />pressurized piping with secondary containment. <br />3. Installation of a Veeder-Root 8473 Magnetostrictive Probe as <br />indicated in the submitted application. <br />4. Evidence of financial responsibility must be on file with <br />PHS-EHD in order for the underground storage tank systems located <br />at this site to be in compliance. <br />5. As built plans shall be submitted within 30 days of <br />completion of the installation. <br />A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.