My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:16:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\1997 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. <br />3. <br />05-21-1997 12:57AM FROM TO 19166464679 P.02 <br />• <br />a. INew facility plan review fee of $624.00 (8 hour minimum per facility), $170.00 fee per. <br />tank, Plus,$56�00 state surcharge fee per tank is due at time of plan submittal. <br />b. I New installation of an additional tank at an existing facility is $624.00 plan review fee (8 <br />hour minimum per facility) plus $170.00 fee per new tank, and 566:00 per tank state <br />surcharge fee.r� <br />C. It should be noted that a $624.00 plan review check fee required for each submittal allows <br />for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br />plan review, meetings, inspections, phone or office consultations will be billed to the <br />applicant at a rate of $78.00 per hour. <br />d. The maximum review time for UST installation plans is 40 working days. A preliminary <br />review will be conducted by the PHS-EHD within 20 working days of submittal date to <br />identify any gross plan deficiencies. <br />e. If gross deficiencies are identified, the plans will be returned with a checklist identifying plan <br />deficiencies. <br />f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br />submitted to have review completed within 10 working days of submittal date if staff is <br />available to perform the review. <br />a. The enclosed plan review sheet is to be completed and submitted with the three sets of <br />drawings to PHS-EHD. <br />b. A copy of the California UST Regulations may be obtained from the California State Water <br />Resources Control Board at (916) 227-4303. <br />C. Permits and/or plan check approval may also be required by the San Joaquin Valley Unified <br />Air Pollution Control District, the County/City Building Department and the Fire District in <br />your respective area. <br />d. A minimum of 3 inspections will be conducted on the USsystem installation. A $78 per <br />T <br />hour inspection fee shall be charged for additional inspections or reinspection as required. <br />(See required inspections below) <br />e. ApplicanOJ ontractor to adhere to the approval plan and any change or deviation shall be <br />reported to and approved by PHS-EHD prior to installation. <br />f. I The application for installation of underground tanks is only valid for the calendar year in <br />which it has been issued. A permit may be extended into the next calendar year if a letter is <br />sent to PHS-EHD requesting this extension thirty days prior to the end of the calendar year. <br />tr <br />A one time, one year extension may be granted by PHS-EHD upon receipt of this Ietter, <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.