Laserfiche WebLink
05-21-1997 01:01RM FROM TO 19166464679 P.08 <br />19. P"ping (cross-sectional diagram, including connections to tank and dispensers). <br />I t and tank riser primary containment system Wpped with overfill prevention system that: <br />Restricts delivery of flow to tank CSCCticm 2635 (b) (2) (B) or (C)3, or <br />Provide positive Out off of ttow to the tank at m more then 95 % (Section 2635 (b)(27(C)3, or <br />Vapor recovery piping designed so it cannot contain liquid phase product, or <br />Suction piping (bet" grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)I <br />Sloped so contents of the pipe will drain back into the srore9e tank if the suction is <br />released. <br />_. No valves or pumps installed below grade. <br />— lnspectiw method prwided to demonstrate CcWtianoe with Section 2636 (a) (3). <br />Corrodible underground piping pratected against corrosion (Section 2636 (b)). <br />underground primary piping will meet all of the following requirements <br />Primary piping in contact with hazardous substance under normalration oditions shall be: <br />instal led. inside a secondary containment system in the form of: �wlseco Bary pipe Vault or <br />_lined trench to be sloped to a collection Sump at the low point of the piping_ <br />XPrimary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary croserdus standards.. <br />Lined vend used as secondary containment <br />Material coamarible with the substance stored. <br />Covered and Capable of supporting any expected vehicular traffic. <br />pnping with secondary containment will be equipped and monitored as follows: <br />Secondary comainmenr will be equipped with a continuous monitoring system COrV*Cted t0 an audible <br />and visual etarm system. <br />Autcaratic li teak detectors will be installed W ressurized piping <br />Manufacturer u" R-- <br />Model: -(CJ�,-3470 <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is discwnecred. <br />20. State Watar Resources Control Board -Facility (AP and "Tank Permit (B)m application forms submitted. <br />21. tan review and operating permit fees paid. 611- 11 <br />22.. Wat is the approximate depth to grovel water: U0 0211 <br />(include source of information - borehole logs, monitoring wall data, water <br />tudi H, etc.) <br />K23. 1 otat fUber of canny m site after installation: <br />24. rylCity Fire District and Building Department notified_ - <br />25./ I the event contamination is observed, confirmed or suspected as a result of aleaking UST system it is your <br />porsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />m <br />irtnts3 as an owner or operator to submit a workplan to PHS-EHO Site Mitigation Unit prior to initiating any <br />assailant Or Imedl4UM attivitie5. For further a33istance Contact the Site Mitigation Unit at (209) 469-3450. <br />a owner or operaror a r�acknowtedge this resporuibiliry for workplan submittal by signature and date below. <br />�.c'.t Title Date :�' <br />CONDITION OFAPP OVAL: <br />0 <br />