My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:16:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\1997 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />0 <br />VEEDER ROOT <br />collected and combined with information from other <br />- idle periods to form a highly accurate leak detection <br />database. Sophisticated statistical analysis tech- <br />niques in CSLD constantly evaluate all new and all <br />< existing information in the database to discard <br />invalid data and perform leak tests based on only <br />high-quality information in the current database. In <br />fact, a new leak test is performed every time new <br />data from an idle period is added. <br />► Uninterrupted business for 24-hour stations <br />or aro r.md-the-clock fueling operations. <br />► Automs-lic. continuous operation — no need <br />to SChiiiule test times. <br />► Third-;;;;rty tested — performs better than <br />U.S. F_.1*7.A. standards! <br />► Meets Foderal. state and local compliance <br />requirentc-nts for monthly monitoring. <br />► Up -to- ":e -minute leak test results available <br />24 hours a da} <br />► Autom;nt!c !oak test report every 24 hours. <br />► QualiCsd fcr!enks up to 30,OOOgallons. <br />► More ,%curse !est results... fewer false <br />alarm .. <br />► An inta,r 4,,E i i of the TLS -350 — the world's <br />leading :e: !:: ;cniforing system. <br />► Simple :ogrades available for TLS -350 <br />systenm, =heady in the field. <br />Automat!C. cnt:nuous leak detection <br />CSLD is a new, advanced tank testing technology <br />that makes full use of the TLS -350's in -tank moni- <br />toring capabilities. <br />The TLS -350 with CSLD continuously monitors fuel <br />height and temperature information to detect idle <br />times in the tank. During each idle time, data is <br />Since the database is constantly being updated, <br />leak test results are always current— not results <br />from a static leak test that may be days or even <br />weeks old. <br />Leak tests are performed using the best data from <br />up to the previous 28 days, and test results are <br />continuously updated as new data is gathered. Test <br />results are provided automatically every 24 hours. <br />In addition, up-to-the-minute leak test results are <br />available at any time with the press of a button. <br />Greater accuracy, quicker response times <br />CSLD's algorithm sorts through all available infor- <br />mation and uses only the highest quality data to <br />perform its leak tests. Since invalid data is thrown <br />out and only the best data is used, leak test results <br />are more accurate and the chance of false alarms is <br />greatly reduced. <br />And, because leak test data is collected continu- <br />ously and updated frequently, the response time to <br />detect leaks is shorter than that of scheduled static <br />leak tests. <br />Third -Party Certified <br />Third -party testing confirmed that CSLD meets <br />Federal, state and local compliance requirements <br />for monthly monitoring. Test results showed a 99% <br />probability of detection and less than a 0.1% <br />chance of false alarm! That far exceeds the U.S. <br />E.P.A. performance standards of 95% probability of <br />detection and 5% probability of false alarm. <br />Call us for a copy of the test results. r=,,,„,, dr <br />
The URL can be used to link to this page
Your browser does not support the video tag.