My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:16:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\1997 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1P <br />OPERATING POSITIONS <br />POSITION 1: - Position 1 is the <br />"tripped" or "reset" position. The <br />'96 LD -2000 goes into this posi- <br />tion when the pressure in the <br />delivery system falls to 4 psi or <br />less at the leak detector. <br />In the reset position, the '96 LD - <br />2000 is ready to look for a leak <br />in the delivery system the next <br />time the submersible pump is <br />turned on. With the pump <br />turned on, the'96 LD -2000 will <br />allow approximately 1.5 gallons <br />of product per minute to enter <br />the delivery system through a <br />cross hole in the poppet. <br />In Position 1,, a portion of the <br />cross hole is positioned around <br />the narrow part of the metering <br />pin. Pressure will build very <br />quickly to 12-15 psi. As the <br />pressure builds in the delivery <br />system, it also increases under <br />the piston in the top of the '96 <br />LD -2000. This pressure causes <br />the piston and poppet to move <br />upward. <br />POSITION Z - When pressure <br />in the delivery system has <br />reached 12-15 psi, the piston <br />and poppet assembly moves to <br />Position 2 - the "leak sensing" <br />position. <br />As the poppet moves to this <br />Position, the cross hole in the <br />poppet centers around the head <br />in the metering pin. Since the <br />head of the pin is considerably <br />larger than the shaft, flow is <br />restricted from 1.5 GPM to 3 <br />GPH or less. <br />If there is a leak in the delivery <br />system of 3 GPH or more, the <br />pressure in the delivery system <br />will not rise, and the '96 ID- <br />2000,will stay in this position. If <br />there is no leak in the delivery <br />System, the pressure will con- <br />tinue to rise. <br />POSITION 3 - If the <br />pressure continues <br />to rise, the "96 LD - <br />2000 will move to . <br />Position 3 - the "full <br />flow' position. In <br />position 3, the '96 <br />LD -2000 will allow <br />full flow of product <br />from the sub- <br />mersible pump to <br />enter the delivery <br />system. <br />For further information about the '96 LD -2000 or other leak detection equipment, <br />contact your local distributor or call. <br />VAPORLESS MANUFACTURING, INC. <br />9234-C East Valley Road - Prescott Valley, AZ 86314 <br />1-800-367-0185 - (520) 775-5191 - FAX (520) 775-5309 <br />Printed on Recycled Paper Made in the United States of America <br />
The URL can be used to link to this page
Your browser does not support the video tag.