My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:16:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\1997 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW U ' STALLATION INSPECTION REf" RD <br />FACILITY NAME: ADDRESS: <br />SWEEPS* TANK* CU� Lo r"...i TANK EML/MTERIAL: x <br />ncRX€,S <br />CAPACITY: �0 ccJ PRODUCT: R.E.H.S: <br />INITIAL INSPECTIONS <br />Q 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: ' O NRS IN:o \cBRINE(LIOUID ANNULAR): OTHER- <br />q"W 71 <br />4. PRIMARY TANK TEST: PSI: vv��HRS <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />A <br />I <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/3O MIN) (CCR 2635 (8) (4)) <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />R <br />T <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />0 <br />1 <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />V <br />A <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (8)) <br />E <br />L <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br />D <br />S <br />19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />21. 'C' FORA COMPLETED AND SUBMITTED (CCR 2635 (E)) <br />1. DST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />(p .c� q <br />✓ <br />y <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />Q 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: ' O NRS IN:o \cBRINE(LIOUID ANNULAR): OTHER- <br />q"W 71 <br />4. PRIMARY TANK TEST: PSI: vv��HRS <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/3O MIN) (CCR 2635 (8) (4)) <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: MRS/MIN: OTHER: (CCR 2635 (A) (4)) <br />8. LAKE TEST ON ALL SIPS (24 HR. MINIMUM) HRS: (COR 2635 (A)) <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (8)) <br />FINAL INSPECTION <br />'-006 3/92 <br />12_ PERFORMANCE TEST FOR 'ALL' MONITORING PROBES (CCR 2632 (C) (2)) <br />13_ PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br />14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br />15. PERFORMANCE TEST OF AUTOMATIC PUP SYSTEM SHUT-OFF (CCR 2635 (8) (5)) <br />16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br />17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br />19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br />20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br />21. 'C' FORA COMPLETED AND SUBMITTED (CCR 2635 (E)) <br />22_ MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CIU! 2641-2644) <br />23. ALL CONDITIONS PET; FACILITY PERMIT ISSUED (H -S CONE 25284 (E) (F)) <br />'-006 3/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.