My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_PLAN 1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
INSTALL_PLAN 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:16:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
PLAN 1997
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\INSTALL PLAN 1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> q <br /> PE_ RFORNi /INCE � F� E_ CIIF lC ;1I I0N -- C0N _i� IN1 .� __ I� <br /> � I <br /> uj <br /> FC; BION IX CANOPIES - CONnNUED <br /> Z <br /> PART 3 — EXE:CIJ TION -- CONTINUE-D 0 LaJ : N <br /> 3. 1 . 17 FABRICATION DRA'NINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE � <br /> A MINIMUM OF e} WEEKS PRIOR TO COMMENCEMENT OF CONSTRUCTION, NO WORK uj <br /> uj 0 <br /> SHALL COMMENCE PRIOR TO APPROVAL OF DRAWINGS BY SOUTHLANDS".33 CONSTRUCTION " <br /> a <br /> RF_"PRESEN FATIVE:. j w 3 <br /> 3 4 <br /> .3.2 EXECUTION: _j w <br /> 3.2. 1 COORDINATE DELIVERY AND INSTALLATION WITH GERNERAL GASOLINE. INSTALLER � <br /> THROUGH LOCAL CONSTRUCTION OFFICE. MATERIALS SHAD_ BE STORED AT POSITION AS �^'" <br /> INDICATED BY GENERAL. GASOLINE INSTALLER. w <br /> � wxN r <br /> :5.2.2 CANOPY CONTRACTOR SHALL BE: RESPONSIBLE FOR PROVIDING FOOTING ANCHOR Ix vi <br /> BOLTS AND TEMPl1TE FOR DEI_IVER'Y TO GENERAL_ GASOLINE INSTALLATION CONTRACTOR z <br /> 2 'NEEKS PRIOR f0 INSTALLATION, SIZE IN ACCORDANCE. WITH SHOP DRAWINGS AND IN U � �z�` <br /> ACCORDANCE WITH GASOLINE INSTALLING CONTRACfOR'S SCHEDULE OF' CONSI'RCLJfION. <br /> :3.2. 5 FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY <br /> (,;E:NE RAI_ CASOLINE INSTALLER AS PER APPROVE..0 SHOP DRAWINGS. -, '(PE OF CONCRETE <br /> SHALL. BE AS PER SHOP DRAWINGS. TYPE, SIZE, AND PLACEMENT' OF ALL. REINFORCED <br /> `STEEL SHALL 13E AS PER SHOP DRAWINGS. 20 � <br /> N ;_r- � AND <br /> - '� �, � 'EMENT OF CANOPY <br /> ,5.2.4 TTiE CONTRACTOR SHALL. VERIFY ALL DIIvICfISION-7 BEFORE STARTING WORK A <br /> FNOTIFY OUND. SO'lHI ND'STo aCONSITE TRUCTIO SIZE, IMMEDIATELY O to r )I:: CREPANCIE'J ' CL <br /> FOUND. <br /> 3.2.5 CANOPY CONfRAC,TOR SHALL BE RESPONSI131.,E FOR BEING PROPERLY LICENSED IN <br /> LOCAL INSTALLATION AS WELL AS PROVIDING OWN PERMIFS AS MAY BE REQUIRED. A <br /> COPY 0 : 'THE PERMIT MUSK BE ON FILE IN fHE LOCAL ICON IRUCHON OFFICE PRIOR <br /> TO COMMENCING WORK. <br /> :5.2.6 CANOPY CONTRACTOR SHALL. BE RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE � <br /> o <br /> WITH ACCEPTABLE INSURANCE AS REQUIRED PER SOU"fHLAND CORPORATION INSURANCE � r <br /> SPECIFICATIONS AND STANDARD CONTRACT FOR CONSTRUCFION. INSURANCE SHALL BE <br /> IN EFFECT F'OR DURATION OF' WORK. <br /> 3.2.7 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL WORK OF <br /> OTHER CONTRACTORS ALREADY IN PLACE, AS MAY BE REQUIRED. � <br /> 3.2.£3 CANOPY CONTRACTOR SHALL_ BE RESPONSIBLE FOR CONTACTING AND OBTAINING a <br /> APPROVAL OF GENERAL GASOLINE CONTRACTOR PRIOR TO !'UACING OF ANY HEAVY � <br /> EQUIPMENT ON "TOP OF CONCRETE WORK AuZFADY IN PLACE. <br /> 3.2.9ALL FOOTINGS SHALT_ BE ON FIRM UNDISTURBED SOILS OR FILL COMPACTED <br /> To 957S MAXIMUM DENSITY BASED ON A.S. f.M. D 1557- ,70. IF ANY POUR SOIL <br /> CONDITION IS DISCOVERED DURING EXCAVATION, THE DESIGN ENGINEER SHALL HE <br /> NOTIFIED IMMEDIATELY FOR SOIL BEARING VERIFICATION, <br /> 5.2, 10SUPPORTiNG COLUMNS SHALL BE: PLACED AS PER SOUR-11-AND GASOLINE PLANS AND <br /> AS PER APPLICABLE SITE_ PLAN. <br /> 3.2. 1 1 CANOPY SUPPORT COLUMNS 5HAi_l. BE CAPPED AT I-OP. <br /> 3.2.. 12ALL MATERIALS SHALL BE ALIGNED TRUE AND FIAT AND ALL PLANES `;HALL BEFLAT, TRUE TO ESTABUSHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL <br /> WAIL`i CORRECT AND ACCEPTABLE. PARAPET FASCIA SHALL BE VERTICAL.. AND PLUMB. <br /> ALL INTERSECTIONS SHALL. BE TRUE AND STRAIGHTEDGE LINES. MATERIALS SHALL BE <br /> LEFT IN ACCEPTABLE CONDITION TO BE PAINTED E3Y OTHERS. ALL METAL SHALL BE U') <br /> FREE OF DEBRIS AS MAY BE REOUIRE:D FOR FINAL PAINTING/FINISHING. <br /> 3.2. 131NSTALLING CONTRACTOR SHALL. BE.. RFSPONSIBL.F: FOR POURING OF CONCRETE 0 <br /> AROUND CANOPY COUJMNS, COVERING ANCHOR BOLTS AS MAN( BE REQUIRED. <br /> J.2.14-CANOPY CONTRACTOR SHALL LEAVE ALL EXPOSED STRUCTURAL STEEL FREE: OF <br /> DEBRIS, PRIMED AND READY FOR FINAL_ PAINTING BY GASOLINE CONIRACTUR. U <br /> 3.-:5 RESPONSIBILITIES OF GENERAL. GASOLINE CONTRACTOR: _ <br /> :3.3.1 SHALL BE RESPONSIBt_E FOR A MINIMUM OF 30 DAY NOiTIVICATIUN OF DATE WHEN fJ <br /> SITE WILL BE READY FOR INSTALLATION OF GASOLINE CANOPY. <br /> 3.3.2 UPON AGREED DATE BETWEEN GASOLINE CONTRACTOR AND CANOPY CONTRACTOR, CL- <br /> -THE SITE SHALL BE FREIE OF MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL AND <br /> IN PROPER CONDITION FOR CANOPY iN`FA.l_I_ATTON. GENERAL GASOLINE. CON'TRACTOTZ <br /> SHALL PERFORM SITE 'NORK AS MAY BE REQUIRED TO COMPI-Y. <br /> 13.3GASOLINE CONTRACTOR SHALL NOT INSTALL_ GASOLINE DISPENSFRS PRIOR TO CANOPY w <br /> ERECTION, UNLESS S AGREED UPON IN WRITING BETWEEN THE CANOPY INSTALLER AND <br /> GASOLINE INSTALLER. <br /> 3.3.4GENERAL CONTRACTOR SHALL 131' RESPOM`31BLF FOR THE INSTALLATION OF CANOPY <br /> FOOTINGS AS DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, <br /> PROVIDING ALL STEEL_, ETC., (WITH THE EXCEPTION OF ANCHOR BOLTS TO BE <br /> PROVIDED BY CANOPY INSTALLER). FOOTINGS SHALL. BE POURED IN A SUFFICIENT <br /> AMOUNT OF TIME, SO PROPER CURING TIME IS ALLOWED). L <br /> 3,3.5GASOLIN=. CONTRACTOR SHALL BE RESPONSIBLE FOR PAIIN TING OF ALL METAL AND ,I <br /> FRIM AS RELATED TO THE GASOLINE CANOOPY AS PER STANDARD COLOR REQUIREMEN"fS. <br /> 3.3.6GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLATION <br /> OF LIGHT.`), SIGNS, SECURffY LIGHTS, ETC., IN CONJUNCTION ,WIFH NORMAL <br /> GASOLINE INSTALLATION. <br /> :5.3. 7CASOl.INF: CONTRACTGR SHfALI. E3E: RE5T'ONSIBLE FOF2 I_FAVLNG BLOCKOUTS AS MAY s <br /> BY REQUIRED FOR INSFALLAFION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS, cOi` <br /> AND PLACEMENT OF ANCHOR BOLTS IN ACCORDANCE WITH SHOP DRAWINGS AS RELATED <br /> THERETO. <br /> 3.4 `NARRANTIES: CANOPY CONTRACTOR SHALL WARRANY, IN WRITING;, COMPLETE CANOPY <br /> INSTALLATION FORA MINIMUM PERIOD OF 2 YEARS. A 5 YEAR WARRANTY PROJ�Ct NO: <br /> GUARANTEEING INSTALLATION TO BE FREE OF DESIGN AND INSTALLATOIN DEFECTS. <br /> 3377, 1Ct <br /> INCI_UDINGS ACTS OF MAN, GOD AND NORMAL 'NEAR AND TEAR, SHALL BE COVERED. ! APPRBVED <br /> 5.5 I-EAN--UP: CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CLFAN —UP AND I w <br /> REMOVAL FROM SITE ALL. TRASH AND DEBRIS RESULTING FROM WORK RELATING TO <br /> INSTALLATION OF CANOPY. [oarz I5su�U: <br /> sNs�T --- <br /> i <br /> y <br /> r <br /> v � , <br />
The URL can be used to link to this page
Your browser does not support the video tag.