Laserfiche WebLink
-.--- - <br /> SECTION II INSPECTIONS TESTINr, -- CONTNUED SEC_i-10NI it INSPEMIONS / rESTING - C0WI_H\ UE:0 <br /> _-_ SEC _i"ION 111tARrH WORK - COWINUFD z u <br /> PART 3 TANK INSTALLATION INSPECTION CONITINUr=D PART 5 -- START--- UP INSPECTION CONTINUED PART 3 -- EXECUTION - COITINUEDI— 2 <br /> AIR TEST: TANKS SHALT_ BE AIR TESTED AS PER MANUFACTURER'S SPECIFICATIONS 5.5. 1 :3 EI-.FCTRICAI_ CONDUITS SECURED WITH ALL CONNECTIONS COMPLETED. VERIFY 3.5 HAZARDOUS MATERIAL: SHOULD ROCK, `NATER OR OTHER HAZARDOUS MATERIALS NOT W " iS <br /> 3.5 P,.R TE_T. AD S <br /> PRIOR To PLACEMENT. CONTRACTOR SHALL BE RESPONSIBLE" FOR PROVIDING AI_I- COMPLIANCE WITH REQUIREMENTS FOR ISOLATED GROUND WIRING TO JUNCTION BOX SHOWN ON SOILS TEST BE. ENCOUNTERED, LOCAL_ CONSTRUCTION OFFICE SITE MANAGER z <br /> MATERIALS TO PROVIDE_ COMPLETE AIR TEST INCLUDING, Bur Nor LIMITED TO, AIR CASING. SHALL BE IMMEDIArEI_.Y CoNTACTED FOR A13PROVAL TO PROCEED. r' <br /> COMPRESSOR OF SUFFICIENT SIZE AND CAPACITY, SPECIFIED SOAP MATERIAL AND ,5.;3. 14 DI°aPLNSFJI (CANOPIES INSTALLED AND LIFiINC, LUGS REMOVED WITH PROPER .5.6PROfECfI0N: CONTRACTOR SHALL. PROVIDE SUFF (CIt.Ni PROTECTION WITH E"ARTFiEN z <br /> ACCEPTABLE SOAP APPLICATION EQUIPMENT. r INSERTED. BERMS AT Ai.-i TIME_., f0 PROTECT TANK HOLE AND TRENCHES FROM DRAINAGE OF <br /> PLUGS kaJ <br /> 5.6 MINIMUM TESf1NG: JACKETED STEEL_ FANK S AS MANUFACTURED BY TOTAL CONFAINMENT 5,5. 15 ALL NOZZLES AND SWIVELS AVAiIABLE ON --SITE, INSTALLED PRIOR ONLY IF SURFACE WATERS. EXCAVATIONS SHALT_ BE PROPERLY MARKED, PROTECTED AND <br /> SHOULD ARRIVE AT THE JOB SiTE WITH A MIMIUM OF 4" HG ON THE INTERSTICE, OBSERVE REQUIRED BY GOVERNING AUTHORITIES FOR INSPECTION PURPOSES. BARRICADED FOR SAFETY UNTIL. BACKFILL iS COMPLETE AND SURFACING FINISHED, L,j 0 <br /> THE VACUUM HOLD TEST FOR AT LEAST ONE (1 ) HOUR PRIOR TO SETTING THE i'ANKS. r 5 GOVERNINGAUTHORITIES COMPLETED AND SIGNED. SIGNED 3.7 SHORING: CONRRACTOR SHALL BE RESPONSIBLE FOR DETERMINING REQUIREDr1EN1S C� � <br /> SHOULD THE INTEf2STICE NOT HOLD A MINIMUM 4° HG VACUUM, THEN CONTACT THE TANK �•�• lo ALL INSPECTIONS BY ( c _D \ ) SG c <br /> 1 FOR SHORING AND PROVIDING SAME SHOULD SITE AND OR SOIL CONDITIONS 7) (� i <br /> MANUFACTURER IMMEDIATELY. AND COMPLETED PERMIT CARD Oi ! .Si(E. / <br /> r � , <• <• � �• r f WARRANT SAME. <br /> 3.7 OBSERVATION: SOUFHLAND'S CONSTRUCTION DEPARTMENT ANG/OR REPRESENFANVE 5.5. 17 ELECT'RICAI- DEVICE. INCLUDING LIGHTS, SIGNS AND INTERCOMS PROPERLY C) � wr�iN <br /> SHALL BE RESPONSIBLE FOI2 INSPECTION OF AIR OR VACUUM TEST, OBSERVATION OF <br /> INSTALLED, SECURED AND PL-UMB. 3.3 FILLING AND BACKFILLING: PLACE APPROVED FILL_ MATERIAL IN STRICT ACCORDANCE x <br /> 4VITFI TANK MANUFACTURER'S SPECIE"ICA(IONS. PROVIDE t1 12' BED OF APPROVED FI `J I_J Uj <br /> 3..3.13 ANY N/Ir21NG INSPECTION PORTS IN CANOPY C01_UMN., COVERED WITH BACKFILL OVER BOTTOM OF EXCA ✓AFION PRIOR TO TANK PLACEMENT. BACKFILL SHALL � <br /> LIFTING, SETTING Ahl[) BURIAL- OF TANKS. t � t � - rx <br /> ACCEPTABLE PLATES. " <br /> 3.3 TANK INSPECTION REPORT; WRITTEN REPOT?T SHALL INCLUDE PFIOTOGf2APPiiC DOCUMENT`- 5.15. <br /> : t < . ( ( i3E. PLACED AND COMPACTED IN MAXIMUM 12 LIFTS. (Wzui <br /> APON OF ALL PROCEDUF2E2. ,3..3. 19 VENT LINES PROPERLY SECURED, PROTECTED AND INSTALLED AT PR )PE.R HEIGHT ;5.9CLEAN--UP: CLEAN UP ALL. DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING Q ~ � <br /> r>ai� r '1 - P�1�K �lU LINE rF S i TNG 5.5.20 VERIFICATION OF COMPLIANCE FOR TANK AND LINE TEST AVAILABLE ON SFrE. PREMISES CLEAN AND NEsAT AT ALT_ TIMES. r a <br /> 5 5.21 ALL MANHOLES FREE OF CONCRETE AND DEBRIS. <br /> 4. 1 CONTRACTOR SHALL. COMPLETE AND BE RFSPONSIBI_E roR THE FOLLOWING PRIOR To � ,- < , SECTION ION 9V TAIiNK INSiAI LAFION <br /> 3. x.22 MANHOLE (.AVERS PROPERLY ERL'Y f AIN[ED• SE <br /> _._ . _.. _ -G__. _-_.__ ___._ __._ _._.__ __. Nz <br /> CONCREIF REPLACEMENT" AND FINAL SYSTEM TEST: 5.5.2.5 ALL PAINTING COMPLETE INCLUDING CtA4e10PY, DON1N`.iPOUTS, ME:(AL.5 AND r -_.._._.__. .__.__ . _. _._. -__----- .._ . -------...------._____._. _.-_---- 0p I <br /> 4. 1 . 1 PIPING: ALL PIPING SHALL BE COMPLETED EXCEPT INSTALIAHON OF OVERFILL MISCEI_L}\NE:UUi METALS. ART ) GENERAL <br /> W : 4 <br /> PROTECTION, OVERFILL. PROTECTION SHALL BE INSTALLED UPON COMPLETION OF TEST. r _ 3 � 1 . 1 SCOPE: THIS SECTION COVEFZS THE. FURNISHING OF ALL LABOR, MATERIALS, SERVICES, HHo <br /> 4. 1 .2VENI"S: VENT I_.INF:i SHALL BE COn•1PLE-FEU UNDERGROUND 11NU STUBBED UP •3••.x.2.4 CONCRE-FE AT ISI-ANDS AND TANK PAD TRUE, PROPERLY SLOPED AND FINISHED � <br /> EQUIPMENT AND RELATED APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY ACL <br /> MINIMUM OF 5' ABOVE FINISHED GRADE. WITH ACCEP(ABl_E RISE 70 ?AANHOLES INCIDENTAL_ TO THE INSTALLATION OF GASOLINE STORAGE TANKS. vQiv <br /> 4. 1 .3 PRODUCT LINES: ALL PRODUCT LINES' SHALL. 13E COMPLETE WiTH FIRE VALVES 5.5.25 EL..ECTRICAL PANELS PROPERLY COMPLETED 70 INCLUDE: <br /> _ U 6 <br /> PAR ( 1 - PRODUCTS <br /> _ <br /> INSTALLED AT ISLAND. (A) ONE BF?EAKEI2 FOR EACH SUBv1EFZSIBL.E: PUMP, DISPENSER, CONSOLE -- <br /> 2. 1 TANKS: SHALL BE DESIGNED AND MANUFACTURED SU AS TO BE CORROSION <br /> 4. 1 .4 PUMPS: SUf3Mi::R`JIE3LE PUMPS AND LINES SHALL r3E COMPL1=:fEi_.Y INSTALLED, AUTOGAIJGING, DISPE:NSF.R LIGHTS ALL AND CANOPY IJGI-ITS ALL . (� <br /> 4. 1 .5VAPOR RECOVERY: ALL PHASE I VAPOR RECOVERY LINES SHALL_ BE COMPLETE AND ( ) ( ) PROTECTED PER EPA REQUIREMENTS. APPROVED TANKS SHALL BE: <br /> (E3) GAS PANEL CONTROLLED H'f ON MAN r3REAf{FR. , , r <br /> '2. 1 . 1 IJL LISTED HOPE JACKET STEEL_ TANKS AS SUPPLIED BY TOTAL CONTAINMENT INC. of '.-A <br /> PLUGGED Ai ISLANDS S' G CONTROL BOXES AND DISTRIBUTION BOXES INSTALLED AND WIRED. <br /> , 3 =^ <' - VAPOR � 2.2 HOLD DOWN STRAPS: STRAPS AS REOUIRE:D BY SOILS WATER CONDITION SHALL �a °'� t <br /> 4. 1 .(y FILL_ Plf 1.3 ALL FILL, PHASE I RECOVEf2Y ,AND GAUGING RISERS SHALL ( ) / i <br /> D INTERCOM INSTALLATION COMPLETE AND PROPERLY WORKING. BE INSTALLED. ( ) - BF SUPPI_IEU ,3Y TANK MANUFACTURER C)NL'Y..-_ FI,EL( )_ FABRICATED t1TEf) _UNITS sAft ,. NOT t <br /> 4. 1 .75ITE PREPARATION: CONTRACTOR SHAI.L. PREPARE TANK AREA FOR PRODUCT (E) CONSOLE INSTAi_.I_AfION COMPLETE AiND FUNCTIONAL. ACCEPTABLE;. <br /> DELIVERY AND TAEl1{ iESfiNG PROCEDURES. (F) ALL MIRING PROPERTY IDENTIFIED Wi FH COLOR CODED WIRING. <br /> 4, 1 .8FILL: CONTf2ACTOR SHALL PROVIDE 2' BACKFILL OVER rANKS OR PROVIDE PART :3 -- INSiALLATION <br /> ACCEPTABLE INSULATED BLANKETS FOR COVERAGE OF TANKS. (G) CONouir5 PROPERLY IDENTIFIED. 3. 1 MAUNFACfURING: REFER TO TANK MANUFACI`URER'E CRITERIA AND SPECIFICATIONS FOR 4 <br /> 4, 1 .9 WATER: SHOULD WATER BE PRESENT IN FANK HOLE, CONTRACTOR SHALL_ VERIFY (H) ALL BREAKERS IN " OFF" POSITION. TANK INSTALLATION AND ADHERE TO AS REQUIRED. � <br /> AND NOTIFY SOUTHLAND CONSTRUCTION DEPARTMENT OF STATUS. 5,6 NOTIFICATION: CONFRACTOR SHALL VERIFY ifEIMS AS INDICATED ABOVE PRIOR TO 1i.2 CLEARANCES: MINIMUM CLEARANCE FOR TANKS SHALL- BE AS FOLLOWS: SHOULD <br /> SCHEDULING OF START--UP, MONIES AND/OR TIME LOST Ai SFART-UP DUE 7O NON-- REQUIREMENTS OF TANK MANUFACTURER OR 5011_ CONDITIONS DICTATE GREATER <br /> 4,2 AF TER PLACEMENT OF CONCRETE A COMPLETE SYSTEM TIGHTNESS TEST INCLUDING COMPLIANCE SHALL [3E' CHARGED TO CONTf2NClOR ACCU(?DINGLY, CL.EAf?ANCF_', ADHERE TO ACCORDINGLY. <br /> TANI{S, PRODUCT LINES STAGE II VAPOR RECOVERY LIMES SECONDARY CONTAINMENT <br /> _� <_ _ <: <- - <. " <- <br /> 5.7LINE TESi"TNG: PRIOR TO SYSTEF.1 START-UP, A NYAROSfATIC LINE TEST SHALL BE 3.2..t F3Uri0M: PROVIDE MINIMUM OF 12" BEDDING MATERIAL. BETWEEN BUTTUPA OF <br /> PIPING AND VENT LINES SHALL BE PERFORMED, TESTING SYSTEM ..SHALL BE A.S EXCAVATION OR PAD AND BOTTOM OF TANK. <br /> PERFORMED ON PRODUCT LINES. TESTING METHOD SHAI_I_ BE AS APPROVED BY <br /> APPROVED BY THE SOUTHLAND CORPORAI'ION. <br /> SOUTHLAND ENVIRONMENTAL ENTAL DEPARMENT. TEST SHALT_ BE PERFORMED WITH 3.2.2SIDES: PROVIDE MINIMUM OF 2't) BETWEEN TANKS AND 20 FROM SIDE/END OF � 1 <br /> 4.3 PRODUCT DELIVERY: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION r0 SOUTHLAND REPRESFNrATIVE ON `.,IrF. TANK TO WALL OF EXCAVATION. <br /> SOUTHLAND rZEPRESEN7IVE OF TEST DATE AND VERIFICfION OF NEED FOR TANKS TO BE 5.£3 CATHODIC PROTECTION SYSTEMS: LAS APPLICABLE, ''SHALI_ BE; TESTED FOR 5,2.:3 FOP: PRIOVIDE 33" FILL MN[ERIAL OVER TANK PLUS 13" OF CONCRETE <br /> 11 <br /> FILLED WITH PRODUCT FOR 'TESTING PROCEDURES. A MINIMUM OF 72. HOURS ADVANCE EFFECTIVENESS AND COMPLIANCE WITH MANUFACTURER'S CRITERIA. <br /> 3.:5 TESTING: PRIOR TO INSTAi_i.AfION OF TANKS, FEST PER MANUFACTURER'S ` <br /> NOTIFICATION WILL BE REQUIRED FOR PRODLIC"f DELIVERY. 5.9 CLEAN--IJP; CLEAN UP ALL DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING SHALL BE PERFORMED ON TANK. ON DUAL WALL TANKS, CONSULT TANK MANUFACTURER I <br /> PREMISES CLEAN AND NEAT AT ALL TIDAES. FOR TE STING CRITERIA BUT MINIMUM 4" HG VACUUM Ml1ST BE. HELD ON INfERSTIAL � <br /> 4.4 CONTRACTOR SHALL HAVE REPRESENTATIVES ON SITE TO ACCEPT AND RECORD ALL _ SPACE 1T LEAST ON 'HOUR. - <br /> PRODUCT DELIVERIES, CONTRACTOR'S (-ZEPRESE:NI'ArIVE SHALL REMIND DELIVERY COMPANY SECTION III EARiH WORK 3 E ( 1 } <br /> FOR f <br /> THAT NO OVERALL PROTECTION IS INSTALLED AND TO FOLLOW PROCEDURES FOR DELIVERY --- -_-_____ __ ..._. _____ .-_____ .--_-- . _-- _-. . . __.-_ --._.____ __ . ...._.._-. . .. ..._. . . _ .. ..__ . _,..- � .4PLt\CAME"N F. <br /> AS SIfUArION DICTATES, P �- 3.4. 1 REFER TO SITE PLAN FOR TANK PLACEMENT AND PRODUCT ROTATION. z <br /> PART 1 C�ENERAI_. 3 <br /> f V - ES UPON COMPLETION OF 1 . 1 SCOPE: THIS SECTION COVERS THE FURNISFIING OF ALL LABOR, MATERIALS, 3.4.2 PRIOR TO SETTING OF TANKS, REMOVE ALL. FOREIGN DEBRIS, ROCKS, CLODS, Q s <br /> 4.5 PRODUCT REMOVAL: ANY REMAINING PRO )OCT IN ENT LIN S f � , , GARBAGE, ETC. FROM EXCAVATION. <br /> TESF SFIALL BE REMOVED BY TESTING COMPANY. <br /> SERVICES, EQUIPMENT AND APPLIANCES LIANCES f2EOUl[2ED IN CONJUNCTION WH11 OR i;: <br /> PROPERLY INCIDENTAL TO FARTHWORK. 3.4.3PLACE TANKS ONLY ON APPROVED FIL-I_. DO NOT SET ON CONCRETE OR WOOD. <( <br /> PART __ P(Z(� I�) P� (' I j :5.4.4 SLOPE rANKS 2° MINIMUM AND 4" MAXIMUM iOWARDS END WITH FII_l_ OPENING. <br /> PART 5 -- START--- UP INSPEC, PION - <br /> F _ C SHALL BE RESPONSIBLE FOR FINAL SCHEDULING START- -UP 2. 1 FILL. MATERIAL: SHALT_ BE MATERIAL IN COMPLIANCE WITH 'FANK AND LINE 3.4.5 TANKS SHALL BE BURIED TO MINIMUM DEPI'Ii AS PER ABOVE AND AS SHOWN ON <br /> �. 1 SCHEDULING: CONTRACTOR 3r L _ - . <br /> AND CHECK---OUT. CONTRACTOR SHALL NoTIFY LOCAL- CONSTRUCTION DEPARTMENT AND MANUFACTURER'S SPECIFICATIONS. GASOLINEDRAWINGS. TANKS 4AAY REQUIRE GREATER BURIAL DEPTH IF INSTALLED IN r � <br /> APPLICABLE MANTENANGE DEPARFMENf OFFICE: A MINIMUM OF 48 HOUFZS PRIOR TO INTENDED 2. I . 1 PEA GRAVEL: SHALL BE CLEAN, NATURALLY ROUNDED AGGREGATE WITH A MIX REMOTE POSITION TO ALLOW FOR PROPER SLOPE" ON VENT LINES, VERIFY DEPTH AS W <br /> FiNAL START--UP AND CIiECK -OUT DATE AND TIME. OF PARTICLE SIZE NOT LESS THAN 1 /13" OR MORE: THAN 3/4" . REQUIRED. CL <br /> r• 2. r WASHED ;5.5 PLUGS: ALL. UNUSED PLUGS SHALL_ BE REMOVED. APPLY COMPATIBLE NUN-HARDENING <br /> .3 I <br /> . PU60NNEL: CONTRACTOR, PLUMBING LUMBING .SUBCONTRACTOR, AND ELECTRICAL SUBCONTRACTOR 1 <br /> 2. .2SFONE OR GRAVEL_ CRUSHING')': .SHALL BE WASHED MATERIAL WITH ANGULAR <br /> SHALL BF. AVAILABLE: ON-SITE DURING SFA2T--UP. PIPE SEALANT To INTERNAL BUSHING THT2FADS. PERMANENT METAL PLUGS SHALL BE <br /> PARTIGI_E SIZE: t107 LESS THAN 1 /8' OR MORE THAN I /2' . INSTALLED AT ALL UNUSED OPENINGS. I <br /> 5.3 START--(jP: PHYSICAL START---IJP AND CHECK--OUT OF SYSTEMS AND EQUIPMENT SHALL BE NOTE: MATERIALS MUST- MEF_- f ASrM G--:53 PARAGRAPH 7. 1 FOR QUALITY AND _ <br /> 2 = 'TON OF SOUTI-{LAND REPRESENTATIVE ONLY. CONTRACTOR SHALL 1 ( �/ C 3.6BUSHING: 'THE DI --ELECTRIC BUSl ]INGS IN STI --P3 TANKS SHALL. NOT BE REMOVED w <br /> DONE BY AND A7 THE DI( C.G i SOUNDNESS. FILL MATERIAL 5HAUI_ i�i ) T HAVE MORE THAN 3� PASSING A �3 NEVE, <br /> NOT START OR ACTIVATE ANY EQUIPMENT WITHOUT THE SPECIFIC DIRECTIVE OF SOUi7HLAND DRY Gf2AVEL DENSITY MUST BEA 4AINIMtJM OF 95 POUNI)5 PER CUBIC FOOT. FROM THE UNUSED OPENINGS. THE PLUGS IN TANK OPENINGS WHICH ARE TO BE USED <br /> f2EPf?ESENTATIVE. U,4h1AGE TO ANY 5UtITI-]LAND EOUIPME:NT DUE TO IMPROPER INSTALIIAFION SHALL NOT BE OVERTIGHTEiNED AS THIS MAY CAUSE: THE BU SETING TO UNSCREbv WITVI € <br /> W THE RESPONSIBLITY OF THE CONTRACTOR. 2. 1 .3SADlD: (WHEN APPROVED IN 'NRITING OE! A PER FSROJE.CT BASIS.) b1ATERit\I_ THE PLUG, CARE SHALL OF TAKEN NOT TO CROSSrREAD OF? DAMAGE THE: NUN-- v <br /> AND/OR UNt\UTHORILED .TART UP WILL BE E SHALL F3E CLEAN, WASHED, INERT, WELL GRANULATED WITH LESS THAN £3% BY S E 3 S � - � cNta <br /> 5.4 SITE COMPLETION: ALL SITE WORK, INCLUDING CONCRETE/ASPHALT PAVEMENTS, SHALL WEIGHT PASSING A { 200 SIEVE, ME"I'A[_i_IC BUSHINGS WHEN REPLACING PLUGS aFZ INSTALLING REQUIRED TANK PIPING. <br /> 3.7WET HOLE IN`<�fAl_IATION: SHOULD GROUND WATER BE PRESENT" IN TANK EXCAVATIONS, <br /> Hca <br /> LA COMPLETE. ALL 11 IN_I"TIES SHAL[. BE CONNECTED L B OPERATIONAL. ALL 2.2 GEOTFXTILE MATERIAL: SOIL STABILIZATION FILFFR FABRIC MATERIAL SHALL BE ONE S f - rn <br /> LANDSCAPING, INCLUDING SPRINKLER S"("SfE4riS, SHALL BE COMPLETE' t}F- THE FOULUNJING: - ANCHORING SHALL BE REC)UIFZED. § <br /> 5.5 VERIFICA'rION: PRIOR TO SCHEDULING OF START-UP, CONTRACTOR SHALL 013SERVE 3.7. 1 WELL_ POINT: WATER SHALL_ BE KEPI' AT LOWEST POSSIBLE POINT BY WELL. POINT <br /> 2.2. 1 PHILLIPS FIBERS, SURPAC 4NP (PHONE #800-345-5737), , PUMP <br /> (S). <br /> VERIFY CORRECTNESS AND COMPLIANCE TO SOUTHLANO'S DRAWINGS AND SYSTEMFS) AND ROPERI-Y ..SIZED PUMP (.3). � I <br /> SPECIFICATIONS FOR THE FOLLOWING: 2.2.2H0E:CHST CELANESE CORPORATION TREVIRA 51125 (PHONE 11F800--845 --7597). 3.7.2ANCHOR DEADh1AN SHALL BE CONSTRUCTED OF CONCRETE AS DETAILED IN <br /> 5.5. 1 MANWELI_S SHALL BE PROPERLY CENTERED/INSI'AL.L_ED AT OVERFILLS, SUBMERSIBLES, 2.2AREEMAY, INC., IMPAR 3401 OR FMPAR .3,541 (PHONE #800-321 -6271 ).-6271 ). DRAWINGS AND AS PER TANK MANUFACTURER'S RECOMMENDATIONS. PLACE 12 FROM <br /> VAPOR RECOVERY, AUTOGAUGING, OBSERVATION TUBES AND SUMP RISERS, ) . - OUrSIDE VERTICAL LINE OF TANK(S) AS SHOWN ON DRAWINGS. <br /> / P ART. 3 E Xt_CU FION 2 <br /> 5.5.2 PROPER HEIGHT" OF GRAVEL_ BACKFILL_ AROUND SUMP RISERS. 3 3. /.:3 fIE DOWNS: STRAPPING MATERIAL. SHALL BE AS PER TANK MANUFACTURER'S c7 E„ <br /> / :i. 1 PROTEC710Na: PROVIDE ADEQUATE SHORING, BRACING, PILING AND rt <br /> 5.5.3 TANK I.D. MARKERS INSTALLED IN CONCRETE AT PROPER L.00TIONS. CRIBBING. REOUIRE:MENTS. <br /> „ <br /> 5.5.4 AL1_ BRASS GOODS AND FfrfINGS PROPERLY INSTALLED, TIGHT AND SECURE. :5.2 [AfOUT: CONTRACTOR .SHALL BE RESPONSIBLE FOR LAYOUT OF ALL. WORK. OrlNE:TZ 3.7.1- TJRh1B ,l „,Kt_F_S: TO REMOVE .,ABLE ;SLAC. UTILIZE 5/3 JAW TYPE U2 BU ,K _ES, <br /> U <br /> < DISCREPANCIES, ONE EACH SIDE OF TANK 2 PER STRAP). <br /> 5.5.5 LEAK DETECTORS INSiALI_ED, RF.,ERVEJ THE RIGrIT "CO MAKE IF UISCREFANCIESSAf2E r01JND BY S .a 3 C „t <br /> 3 r CONTRACTOR. REPORT DISCREF ANCIEs To OWNER'S LOCAL_ CONSTRUCTION FAANAGFR. 3, 7.5STfW PLACEMENT: AS PER TANK MANUFACTURER'S SPECIFICATIONS. _ <br /> 5.5.6 PROTECTED FLEX LINES PROPERLY INSTALLED WITHOUT TWIS"r IN INSTALLATION SFT AND MAINTAIN NECESSARY STAKES, BArFER BOARDS AND REFERENCE POINTS. <br /> AID <br /> AID STRIPE. 3.7.61N.SULATIUN: iANKS.� SHA(_L. 13E INSULATED FROM TIEDUWiNS BY PLACEMENT OF PRoj_Ecr Flo: <br /> 5.3 EXCAVATION: EXCAVATE TO LINES, ELEVATIONS AND LIMITS REQUIRED BY THE APPROVED DI--EL ECTRIC MATERIAL BETWEEN STRAP AND FANK. MATERIAL SHALL BE 0377. t0 <br /> 5.5.7 MANHOLE EXTENDERS PROPERLY INSTALLED AND SCRFWED IN FRAME OF" MANHOLE DRAWINGS PLUS SUFFICIENT DISTANCE AND SPACE 'TQ PERMIT INSTALLATION OF "TANKS. PETROLEUM RESISTANT MATERIAL AS APPROVED BY TANK MANUFACTURER. -"-- <br /> SUMP/RISERS, PROPERLY SET AND SEALED 1O TANK MANWAY OR FITTINGS AND EXCAVATE AS REQUIRED, REGARDLESS OF TYPE, CONDITION OR MOISTURE CONTENT OFAPPHQVEp : <br /> CLEANED OUT FREE OF DEBRIS AND CONCRETE. 5.7.7 COATING: COVER Al_I_ NON-GALVANIZED HARDWARE. WITH TWO (2) COATS OF <br /> 7FiE MATERIAL ENCOUNTERED. HAUL EXCESS MATERIAL. OFF THE: SITE AND DISPOSE OF ASPHALT IMPREGNATED WITH WATERPROOFING PRIOR TO PLACEMENT OF BACKFILL, - --- <br /> 5.5.8 TANKS CLEAN AND FREE OF WATER. SAME. DIMENSIONS OF TANK EXCAVATION SHALL BE MINIMAL AS ESTABLISHED BY pAr issuEUc ' <br /> < 'S _ - '( " " f CORPORATION DRAWINGS UNLESS TANK MANUFACTURER RE( UIREME:NrS ARE 3.8 LIFTING: TANKS SHALL. BE LIFTED ONLY AS PER MANUFACTURER'S RECOMMENDATIONS, <br /> 5.5.9 ISLAND FORM INNER B0.(E� f ROPLRL_Y CLEANED our iREE OF DEBRIS ANU S )UTHWN.) .,01 S ) Ufll_IZING L_IFi-INC LUGS PROVIDED ON TANKS. TANKS SHAT-L. Nor BE ROLLED, DROPPED <br /> CONCREFF. GREATER, OR WRAPPED WITH CHAINS. EQUIPMENT OF _SUFFICIENT SIZE, DESIGN AND LIFT CAPACITY 5HEE7 <br /> 5.5. 100ISPENSERS PROPERLY SET AND SECURED TO ISLAND BOX FRAME AND 3.4 SAWCUriING: IF PAWING MUST BE. REMOVED, THE: PERIMErER OF THE TANK H01._E LAND SHALL BE: UTILIZED FOR SETTING OF TANKS. SHOULD TANK33 BE BUMPED, DENTED, DROPPED . <br /> DISPENSER SUMPS PROPERLY CLEANED OUT FREE: OF UEBRIS AND CONCRETE., ALL TRENCHES SHALL BE CUT WITH A CONCRETE SAW. NO1E: PAVING TO BE CUT '2.' OR MISHANDLED IN ANY WAY INSTALLATION SHALL BE HALTED AND TANK MANUFAC FURER'S FSP - 2 <br /> F : 1 1 FIRE V<\I SIE S `,;EGIJFZED r0 FRAME 'ADI TFI PROPER HARDWARE. BEYOND EDGES OF TANK. HOLD IN ALL. DIRECTINS IN ORDER TO GIVE PROPER SUPPORT REPRESENTATIVE IMMEDIATELY CONTACTED FOR RECERTIFICATION OF TANKS. CONTACT LOCAL <br /> ,'5' TO NEW SLAB TO AVOID SETf1_ING. CONSTRUCr1oIN OFFICE OR SiTE MANAGER IMMEDIATELY UPON NOTICE OF QUESTIONABLE <br /> 5.5. 12PHASE 11 VAPOR RECOVERY LINES STUBBED UP AND SECURED IN PROPER L.01CAFION, HANDLING OF "TANKS OR NOTABLE: DAMAGE THERETO. <br />