My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_PLAN 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
INSTALL_PLAN 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:17:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
PLAN 2003
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\INSTALL PLAN 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12" DIA. x 2'-0" CONC <br />BURIED BASE (TYP.) <br />2" U -BOLTS <br />(TYP.) -\ <br />2" DIA. - 90'_ <br />GALVANIZED ELL <br />2" GALVANIZED SCH 40 VENT <br />RISER AT 12' ABOVE GRADE <br />(P/V VENT PER LOCAL CODE) <br />2" DIA, x 8'-0" GALVANIZED <br />SCH 40 SUPPORTS <br />7'-0" ABOVE GRADE (TYP.) <br />1/8" x 4" x 18" <br />UNI -STRUTS <br />AT 3' AND 5' <br />ABOVE GRADE <br />2" FRP <br />GASOLINE VENT <br />SLOPE VENTS DOWN 1/B " PER FT. <br />TO TANKS (TYP. ALL LINES <br />2" DIA. MALE ADAPTER <br />VENT RISER DETAIL <br />NOT TO SCALE <br />NOTE: <br />ALL DISPENSERS ARE TO BE POSITIONED WITH UNLEADED <br />ON THE LEFT OF THE "A" SIDE OF THE DISPENSER FACE. <br />SIDE "A" OF DISPENSERS ARE TO ALWAYS FACE CLOSEST <br />TO STORE FRONT. IF THE DISPENSERS ARE PERPENDICULAR <br />TO THE STOREFRONT, THE "A" SIDE WILL BE POSITIONED <br />TO THE RIGHT, LOOKING TOWARDS THE STORE. <br />6 MPD'S 1-10,000 & 1-15,000 GAL. (1) 2 H.P. STP <br />STAGE II "Y" FROM TANK TO FIRST BLENDER DISPENSER WITH 1 1/2" <br />IHLL VAPOR RECOVERY PRIMARY PRODUCT LINE, AND USE 1 1/2" PRIMARY PRODUCT <br />r TANK LINE TO THE REST OF THE BLENDER DISPENSERS. <br />2" GALV. STEEL. VENT INTERSTIC cXD <br />PIPE & SUPPORT - NOTE: FOR HIGH VOLUME LOCATIONS USE 2-15,000 GALLON TANKS <br />TO BE PAINTED STEEL VENT RISERS <br />'SOFT WHITE' OR AS AN ALTERNATIVE, USE 3- 15.,000 GALLON TANKS. <br />— <br />PLATE w 1 2 <br />�G <br />TANK MONITOR <br />2" GALV. 90 N MlN2 FG MIN FG SUB -PUMP 2 FG <br />'I <br />7/181 SCOPE <br />S / G <br />F, 1 1/2 y F h <br />Irv, <br />SCOP <br />CLAMPS `\� 2„ FG <br />(TYP.) <br />UNLEADED ,� <br />n - WRAP EXPOSED VENT RISER TANK I G\�P <br />12" BELOW CONCRETE WITH FLEX CONNECTOR <br />3M CATHODIC PROTECTION <br />1 TAPE _1. 2 (TYP.) <br />NOTE: PREMIUM <br />PRIOR TO PAINTING, TANK. ' ?" <br />2 ALL GALVANIZED METAL <br />MUST BE PREPPED 8 TANks r� o ,M/N3 F.G <br />FREE-STANDINNOT G <br />GAVENT DETAIL LE OPPOSITERsIOKSOF LOCATED ON IOWA&,) LANDSt s pe <br />NOTES: <br />1, VENT RISER TO EXTEND A MINIMUM OF 12' ABOVE GRADE WHEN <br />LOCATED IN REMOTE AREA. 5 <br />2. ALL STEEL PIPE & CLAMPS ABOVE GRADE PAINTED "SOFT WHITE PIPING SCHEMATIC (SIX ISLAND MPDS) <br />PAINT FURNISHED BY 7 -ELEVEN TO THE CONTRACTOR. <br />NOTE: SEE SITE PLAN FOR PUMP AND VENT LOCATIONS <br />6" THICK CONCRETE <br />PAVING W/ #3'S @ 18" O.C. <br />BOTH WAYS. APPLY CONCRETE ELECTRICAL <br />SEALANT PER SPEC S:-- CONDUITS <br />SPECIFIED FILL <br />0 0 0 °0 <br />VAPOR RECOVERY <br />LINE <br />F113ERGLASS PIPING ro)��PRODUCT PIPING <br />SECONDARY <br />PIPING <br />PRODUCT LINE <br />6"-3/8" <br />PEAG AVEL BEDDING <br />SECTION THRU PIPING TRENCH <br />NOT To SCALE <br />NOTE: IF CONDUIT OR WATER NEEDS TO CROSS FRENCH IT <br />SHOULD DO SO PERPENDICULAR TO PRODUCT PIPE, <br />UMP <br />2 FG <br />UMP <br />4 4A <br />11ry y\�P <br />1 f� <br />� FC <br />2 F� <br />F. <br />/ OpE I:i SrORf SOF <br />5� <br />4" x 2" DOUBLE <br />TAP BUSHING <br />SLAVE <br />TANK END <br />2" ELL <br />2" UNION THEN NIPPLE <br />& 90' ELBOW <br />2" THREADED—� SEE NOTE - <br />STEEL PIPE " U #3 BELOW <br />3/8 " COPPER <br />FUNCTIONAL ELEMENT OF <br />2" FIBERGLASS <br />PIPE W/3" SECONDARY CONTAINMENT PIPE <br />2" ENVIRON BALL VALVE #BSV-2020 <br />OR EQUAL. MUST BE RATED FOR USE <br />WITH ALCOHOL BLEND FUELS. <br />2" x 3/8" BUSHING FOR COPPER LINE <br />2" NIPPLE <br />`ELECTRICAL CONDUIT <br />SUBMERSIBLE + I <br />' 2" NIPPLE I <br />4", x 2" DOUBLE <br />TAP.. BUSHING I <br />II <br />II <br />2" THREADED <br />STEEL PIPE �I <br />• II <br />A U <br />PRODUCT LINE <br />2" UNION THEN NIPPLE <br />& 90' ELBOW \ <br />I1 — 2"x2"x2" TEE <br />h I <br />I I <br />I I <br />I I <br />I I <br />in <br />SUB PUMP END <br />NOTES: <br />1. ALL FITTINGS TO BE CONTAINED INSIDE RISER. <br />2. SLOPE`TO TURBINE SIDE. <br />3. ENVIRON FLEXIBLE ENTRY BOOTS (PART NO. FEB -6300) AT SIPHON PENETRATIONS, <br />WITH 3•X'2 RUBBER REDUCER BOOT (ENVIRON NO. RRB-3030) ON SIPHON SIDE <br />& A 3'X"2 RUBBER TEST REDUCER (ENVIRON NO. RTR-3020) ON THE STP SIDE. <br />SIPHON DETAIL <br />NOT TO SCALE <br />NOTE: <br />SIPHON TO BE USED FOR MANIFOLDING OF TWO REGULAR 10,000 GALLON TANKS AT LOCATIONS <br />WHERE THREE 10,000 GALLON TANKS ARE USED (1-10,000 PREMIUM & 2-10,000 REGULAR) <br />NOTE: <br />ALL SUMPS TO BE WATER TESTED <br />NOTE: FOR VAPOR VAC INSTALLATION, <br />STAGE II VAPOR RECOVERY LINE <br />SHALL BE 2" FIBERGLASS PIPE WHEN <br />THERE ARE TWO DISPENSERS OR LESS, <br />AND 3" FIBERGLASS PIPE WHEN THERE <br />ARE THREE DISPENSERS OR MORE, <br />GENERAL NOTES <br />1, PIPING TO BE TESTED UNDER PRESSURE DURING BACKFILL PROCEDURE <br />TO ASSURE NO BREACH IN SYSTEM — CHECK OFTEN DURING BACKFILL <br />AND COMPACTION. <br />2. STAGE II VAPOR RECOVERY PIPING TO BE PRESSURE TESTED FOR DECAY <br />AND BLOCKAGE PRIOR TO BACKFILLING. <br />3. PIPING TO BE CHECKED FOR CONTINUOUS SLOPE BACK TO THE TANKS. <br />1� <br />EQUIPMENT <br />SCHEDULE <br />ITEM <br />DESCRIPTION <br />MANUFACTURER, PART NO, <br />FURN. BY <br />1 <br />FLEX 2QPNNECBTOR MS <br />TITEFLEX PART <br />NO. <br />110165-242-0180 <br />7-11 <br />ENVIRON ISOLATION TUBE W/DONUT <br />ENVIRON PART <br />NO. <br />FIT -3530, ITR -3020 <br />7-11 <br />2" VAPOR VENT CAP (VAPOR VAC) <br />OPW PART NO. <br />523V-2253 <br />7-11 <br />O <br />GEODUCT FLEXIBLE CONDUIT <br />ENVIRON PART <br />NO, <br />GDP -4500-1 <br />7-11 <br />4A <br />GEOFLEX—D SUPPLY PIPING <br />ENVIRON PART <br />NO. <br />GFP-2150 <br />7-11 <br />O <br />3" FIBERGLASS PIPE <br />RED THREAD II <br />OR <br />AMERON <br />G.C. <br />O <br />2" FIBERGLASS PIPE <br />RED THREAD II <br />OR <br />AMERON <br />G.C. <br />O <br />12" MANHOLE ASSEMBLY <br />OPW PART NO. <br />104FG-1200 <br />7-11 <br />O <br />4" X 4" X 3" X 2" EXTRACTOR <br />ENVIRON PART <br />N0, <br />VEF-4432 <br />7-11 <br />O9 <br />GEOTECH MATERIAL <br />SEE SPEC. SECT. III <br />2.2 <br />7-11 <br />NOTE: <br />ALL SUMPS TO BE WATER TESTED <br />NOTE: FOR VAPOR VAC INSTALLATION, <br />STAGE II VAPOR RECOVERY LINE <br />SHALL BE 2" FIBERGLASS PIPE WHEN <br />THERE ARE TWO DISPENSERS OR LESS, <br />AND 3" FIBERGLASS PIPE WHEN THERE <br />ARE THREE DISPENSERS OR MORE, <br />GENERAL NOTES <br />1, PIPING TO BE TESTED UNDER PRESSURE DURING BACKFILL PROCEDURE <br />TO ASSURE NO BREACH IN SYSTEM — CHECK OFTEN DURING BACKFILL <br />AND COMPACTION. <br />2. STAGE II VAPOR RECOVERY PIPING TO BE PRESSURE TESTED FOR DECAY <br />AND BLOCKAGE PRIOR TO BACKFILLING. <br />3. PIPING TO BE CHECKED FOR CONTINUOUS SLOPE BACK TO THE TANKS. <br />1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.