My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
BILLING_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:43 PM
Creation date
11/5/2018 8:17:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2010-2015
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\BILLING 2010-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IWIWD PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK MW <br /> MONITORING PLAN- (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Check all <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) thara l) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify)--`--------- -- <br /> --- - 0-9-son. <br /> LEAK MONITOR MANUFACTURER:Veeder-Root 49055. MODEL#:TLS-350 a9as6. <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 490-57' MODEL#(S):794380-208 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES El b.NO 490-59.UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN, ® a.YES ❑ b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT'AT THE DISPENSER. _® a.YES ❑ b.NO 49-62. <br /> UDC CONSTRUCTION iS: _....___._____ <br /> ® 1.SINGLE WALL `-______._-..-____..___.-___-_ <br /> IF DOUBLE WALL: ❑ 2.DOUBLE WALL 49-63. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE 496-fi4a <br /> ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490 Mb, <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.PLD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE REQUIRED.123 cctt§2644.p <br /> 29 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> IN J.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ C.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e,TANK GAUGING RESULTS(and supporting documentation records) <br /> ® <br /> I.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® <br /> It.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiaz with all Of the following documents relevant to theirjob duties: 490-69a. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILffy(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING 1"sQU1PMENT(Required) 49-69c <br /> ❑ CAL�'ORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69a <br /> ❑ CAL]FORNTA IWDERGROIWDSTORAGE TANK LAW 49069e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49-69t. <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> ❑ SWRCB PUBLICATION:"IJNDEItSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br /> ❑ OTHER(Specify): 49-69g. <br /> 490 fi9h. <br /> This facility has a'Designated UST Operntor who has passed the California UST System Operator Exam administered by the In[ema[ional Cade Council 49-70. <br /> (ICC). The "Designated UST Operator"will it facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> Overfill protection-Flapeer <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: l.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> _.by this_2lan occurs_2.)0-B conditions that indicate aEossible release are tovestiga[ed_and L)all moni[orinyzrecords are inmtain0Pop alY_.-__---- <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORM WG THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Ian Moorhead 49-]z TITLE:Environmental Compliance Manager 490-73. <br /> NAME: Jivtesh Gill 490.94. TITLE:Franchisee 49x75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-uaction. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE. 49077 <br /> EF.PP,ESENMNG:[3: Tank Ownu/O rotor 0 2.Facila O amt I®3.Aurhorizei Re uurafias of Owrer 490-]6. P <br /> APPLICANT NAME(print): 490-78. APPLICANT TITLE: 490-79. <br /> Ian Moorhead Env. Compliance Mgr. <br /> UPCF UST-D(12(2007)-3/4 www.unido".org <br />
The URL can be used to link to this page
Your browser does not support the video tag.