Laserfiche WebLink
• . Page 1 of 1 <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Fill Riser Containment Sumps r <br /> Fill Riser Containment Sumps are Present, but were Not Tested r <br /> Test Method Developed By: r Spill Bucket Manufactured. Industry Standard f Professional Engineer <br /> f Other (Specify): <br /> Test Method Used By: r Pressure r Vacuum r Hydrostatic <br /> r Other (Specify): <br /> Test Equipment Used: LAKE TEST_.,' Equipment Resolution: 0,_0625 in. <br /> Spill Box # Spill Box # Spill Box # <br /> Tank T4 REGULAR Tank TS MUL Tank T6 SUPREME Spill Box # <br /> Fill - Direct Fill - Direct Fill - Direct <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 15.25 15.50 16.25 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> starting test <br /> Test start nme: 13:30:00 13:30:00 13:30:00 <br /> Initial Reading q:: 15.25 In. 15.50 in. 16.25 in. <br /> Test End Time: 14:30:00 14:30:00 14:30:00 <br /> Final Reading sic 15.25 in. 15.50 in. 16.25 in. <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Charge In Reading N^i: 0.00 In. 0.00 in. 0.00 in. <br /> Pass/Fail Threshold or Criteria: +/- 0.00 +/- 0.00 +/- 0.00 <br /> Test Result: PassPass Pass <br /> Comments? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> W0: 2303506 <br />