My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2010-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWACB,January 2002 • • Page 3. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard xl Professional Engineer <br /> Other (Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used: aplt Equipment Resolution: +-.002" <br /> Sump# 6 PRE Sump# Sump# SUMP# <br /> Sump Diameter: 4811 <br /> Sump Depth: 59" <br /> Sump Material: fiberglass <br /> Height from Tank Top to Top of 21" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 12 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good <br /> Portion of Sump Tested: t 2311 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x 1Yes❑N0E]N F]Yes DNo❑N 0Yes❑No❑N ❑Yes[]No❑N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 s e c <br /> Is system programmed for fail-safe ❑ o[_ ❑ [:] <br /> ^ ❑ � []Yes <br /> ❑ <br /> shutdown?* Yes NN Yes N N Yes N N Yes No <br /> Was fail-safe verified to be <br /> operational?* xlyes F]No❑N F]Yes DNo[�]N Yes F]NoF]NA fflYes[]No[]N <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min <br /> test: <br /> Test Start Time: 9:50 <br /> Initial Reading(RI): 0 <br /> Test End Time: 10:20 <br /> Final Reading(RF): -.00191, <br /> Test Duration: 3 0min <br /> Change in Reading(R F-Ri ): - .00191, <br /> Pass/Fail Threshold or Criteria: +-.00211 <br /> ❑ _Pa <br /> x ss Fail 0 Pass El Fail E] Pass ❑ Fail ❑Pass 1:1 Fail <br /> Was sensor removed for testing? x Yes[:]N NA Yes[:]N NA❑Yes[:]N NA Yes L]No <br /> Was sensor properly replaced and � � ❑ � ❑ ^ ❑ ❑ <br /> verified functional after testing? Ye N NA Ye N NA Ye N NA Yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> t If the entire depth of the sump is not tested, specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.