Laserfiche WebLink
MONITq&ING SYSTEM CERTIRVATION <br /> CERTIFICATION / TEST DATE: October 17, 2011 <br /> Al. FACILITY A2. OWNER <br /> Name 7-Eleven Market#2368/Store#32190 Name 7-Eleven, Inc <br /> Address 4943 South State Route 99,Stockton,CA 95206 Address P.O. Box 711, Dallas,TX 75221 <br /> Phone# 209-939-0679 Phone# 805-523-2949 <br /> Contact Stephen Boyd Contact Stephen Boyd <br /> F. IN-TANK GAUGING /SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all Inputwiring been Inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested_? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No` Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,+describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ N/A (check all that apply) Simulated leak rate: ■ 3g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ■ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> ■ NIA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ■ Yes ElNo* For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> ElN/A <br /> ■ Yes ElNo* Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> t 2011 Walton Engineering,Inc. <br /> Page 3 of 3 <br />