My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2010-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Replacing the ECPU Board Removing the ECPU Board <br /> 10. The console is now writing the current system setup to the EEPROM (E2) chip. After this task is completed, <br /> the printer prints: <br /> ARCHIVE UTILITY <br /> SAVE SETUP DATA: <br /> END TIME: <br /> MM DD, YYYY HH:NN:SS XN <br /> BYTES: XXXX <br /> 11. And the front panel display reads: <br /> ARCHIVE UTILITY <br /> PRESS <STEP>TO CONTINUE <br /> Removing the ECPU Board <br /> Important! All operating, setup and historical data will be lost when the console is turned off and the ECPU board <br /> is replaced. <br /> 1. Switch Off power to the Console. Open the left front door of the console. Follow the steps in Figure 1 to <br /> remove the ECPU board. <br /> 2. Place old and new ECPU boards side by side on a clean work surface. Make sure that the Battery Backup <br /> switches on both boards are turned Off. <br /> 3. Using a chip removal tool similar to the one shown (IC Extraction tool, Digikey Part No. K158-ND, or <br /> equivalent), follow the steps outlined in Figure 4 remove the E2 chip from the old ECPU board and install it the <br /> identical socket on the new board reversing the procedure shown in Figure 4. Observe chip oreintation as <br /> shown in Figure 5. <br /> 4. Remove the SEM module from the old board and install it in the SEM socket of the new board (ref Figure 10 <br /> on page 17). Note: Either type SEM will only plug in one way. <br /> 5. Remove the software module from the old ECPU board and install it on the new board (ref Figure 8 on <br /> page 14). If present, also remove the memory module from the old ECPU board and install it on the new <br /> board. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.