My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2010-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> Zr Tenkm*Vy <br /> TEST DATE:0 6/21/10 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER2275484 <br /> CLIENT 7-ELEVEN, INC. AUSTIN,TEXAS 78759(512)451-6334 SITE 7-ELEVEN #32190, MXT 2368 <br /> TANK INFORMATION <br /> Tank ID: 87 4 Tank manifolded: NO Bottom to top fill In inches: 141.5 <br /> Product: REGULAR Vent manifolded: YES Bottom to grade in inches: 152.0 <br /> Capacity in gallons: 14,781 Vapor recovery manifolded: YES Fill pipe length in inches: 51.5 <br /> Diameter in inches: 90.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 543 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DN FIBERG Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> >TANK TEST RESULTS Test Method:Vacuxect LEAK DETECTOR TEST RESULTS Test method: FTA <br /> Start(in) End (in) <br /> Dipped Water Level: New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Product Level: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Probe Water Level: Make: VEEDERRDOT <br /> Ingress Detected: Water Bubble Ullage Model: ELECTRONIC <br /> Test time: S/N: 106981 <br /> Inclinometer reading: Open time in sec: <br /> Holding psi: 22 <br /> Probe TESTED VaTest Type: Resiliency cc: NOT <br /> VacuTect Probe Entry Point: <br /> Pressure Set Point: Test leak rate ml/m: 189.0 TESTED Tank water level in inches: Metering psi: <br /> Calib. leak in gph: 3.00 <br /> Water table depth in inches: Results: PASS <br /> Determined by(method): <br /> Result: <br /> COMMENTS <br /> COMMENTS <br /> NE TEST RESULTS ,wtta WP*Test <br /> LINE w."A <br /> Material: DW FLEX <br /> Diameter(in): 1.5 <br /> Length (ft): 245.0 <br /> Test psi: <br /> Bleedback cc: <br /> Test time (min): NOT NOT NOT NOT <br /> Start time: TESTED TESTED TESTED TESTED <br /> End time: <br /> Final gph: <br /> Result: <br /> Pump type: PRESSURE <br /> Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 06/30/2010 09:00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.