My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> IT IS FURTHER ORDERED that, except as provided above, local districts at their <br /> option will specify the testing frequency of the nozzle vapor valves. If nozzle vapor <br /> valve tests are required by the district, the test shall be conducted in accordance <br /> with Exhibit 7, Nozzle Bag Test Procedure. <br /> IT IS FURTHER ORDERED that the Healy Phase II EVR System Including <br /> Veeder-Root ISD shall be compatible with gasoline in common use in California at <br /> the time of certification. Any modifications to comply with future California <br /> gasoline requirements shall be approved in writing by the Executive Officer or <br /> Executive Officer delegate. <br /> IT IS FURTHER ORDERED that the certification of the Healy Phase II EVR <br /> System Including Veeder-Root ISD is valid through September 1, 2009. <br /> IT IS FURTHER ORDERED that Executive Order VR-202-C issued on May 9, <br /> 2007, is hereby superseded by this Executive Order. Healy Phase II EVR <br /> Systems Including Veeder-Root ISD certified under VR-202-C may remain in use <br /> at existing installations. This Executive Order shall apply to new installations or <br /> major modifications of Phase II systems. <br /> Executed at Sacramento, California, this _day of December 2007. <br /> f� <br /> William V. Loscutoff Chief <br /> Monitoring and Laboratory Division <br /> Attachments: <br /> Exhibit 1 Equipment List <br /> Exhibit 2 System Specifications <br /> Exhibit 3 Manufacturer Performance Standards and Specifications <br /> Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air <br /> Separator <br /> Exhibit 5 Vapor to Liquid Volume Ratio <br /> Exhibit 6 Franklin Fueling System Phase 11 EVR System Limited Warranty and <br /> Veeder-Root Environmental Equipment Warranty Policy <br /> Exhibit 7 Nozzle Bag Test Procedure <br /> Exhibit 8 Required Items in Conducting TP-201.3 <br /> Exhibit 9 ISD Operability Test Procedure <br /> Healy Phase 11 EVR System Induding Veeder-Root ISD—VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.