My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 2 - <br /> 2. Inoperative vapor pumps, as determined by the ARB Approved installation, <br /> Operation and Maintenance Manual, constitute a defect. <br /> 3. For unihose dispensers, any modifications or repairs to the nozzle, hanging <br /> hardware or vacuum pump done to bring one fuel grade V/L into compliance at <br /> a fueling point invalidates the results of any previous fuel grade(s) tested before <br /> the alteration. All fuel grades at that fueling point shall be tested again to verify <br /> compliance. <br /> Inverted Coaxial Hoses <br /> 1. The maximum length of the hose assembly, including hose adaptor, whip hose, <br /> breakaway, flow limiter (optional) and inverted coaxial hose, measured at the base <br /> of the nozzle, shall be no more than twenty (20) feet. <br /> 2. Any hose configuration is allowed. <br /> Breakaway Couplings <br /> 1. Testing is required after reconnecting the breakaway to ensure proper operation <br /> and no observed leaks. The procedure for reconnecting breakaway and fueling <br /> point testing after a drive-off, referenced in Section 1.4 of Healy Systems <br /> Scheduled Maintenance, shall be conducted to verify that breakaway, hose and <br /> nozzle are operating properly after a drive-off. <br /> Flow Limiters <br /> 1. Flow limiter is mandatory when the flow rate is greater than 10.0 gallons per minute <br /> to comply with U.S. EPA requirement. <br /> Clean Air Separator Pressure Management System <br /> 1. The Clean Air Separator is a passive gasoline storage tank ullage pressure <br /> management system, with no electrical requirements. The Clean Air Separator <br /> vapor integrity shall be evaluated using the test procedure outlined in Exhibit 4 of <br /> this Executive Order. <br /> a. A Clean Air Separator that fails the leak decay test outlined in <br /> Exhibit 4 shall be considered a defect. <br /> b. Unless there is maintenance or testing being conducted on <br /> the Clean Air Separator, the four ball valves shall be locked <br /> in the positions shown in Figure 2B-2 or 2B-2111 for normal <br /> Clean Air Separator operation. Figure 2B-2 applies to vertical <br /> CAS installations and Figure 2B-2H applies to horizontal CAS <br /> installations. A Clean Air Separator that is not in the proper <br /> operating configuration shall be considered a defect. <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2—VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.